| issue date = 03/06/2018
| issue date = 03/06/2018
| title = NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000445/2018402, 05000446/2018402, and 07200074/2018402
| title = NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000445/2018402, 05000446/2018402, and 07200074/2018402
| author name = Groom J R
| author name = Groom J
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Peters K J
| addressee name = Peters K
| addressee affiliation = Vistra Operations Company, LLC
| addressee affiliation = Vistra Operations Company, LLC
| docket = 05000445, 05000446, 07200014
| docket = 05000445, 05000446, 07200014
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 6, 2018  
{{#Wiki_filter:March 6, 2018


Mr. Ken J. Peters, Senior Vice President
==SUBJECT:==
 
COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000445/2018402, 05000446/2018402, AND 07200074/2018402
and Chief Nuclear Officer
 
Attention: Regulatory Affairs
 
Vistra Operations Company LLC P.O. Box 1002 Glen Rose, TX 76043
 
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000445/2018402, 05000446/2018402, AND 07200074/2018402


==Dear Mr. Peters:==
==Dear Mr. Peters:==

Revision as of 19:37, 17 June 2019

NRC Independent Spent Fuel Storage Installation Security Inspection Report 05000445/2018402, 05000446/2018402, and 07200074/2018402
ML18065A430
Person / Time
Site: Davis Besse, Comanche Peak  Luminant icon.png
Issue date: 03/06/2018
From: Jeremy Groom
Plant Support Branch-1
To: Peters K
Vistra Operations Company
References
IR 2018402
Download: ML18065A430 (3)


Text

March 6, 2018

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 05000445/2018402, 05000446/2018402, AND 07200074/2018402

Dear Mr. Peters:

On January 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Comanche Peak Nuclear Power Plant, Independent Spent Fuel Storage Installation. The NRC inspector disc ussed the results of this ins pection with Mr. J. Dreyfuss, Plant Manager, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division Reactor Safety

Docket Nos. 50-445, 50-446, and 72-074 License Nos. NPF-87 and NPF-89

Nonpublic Enclosures: 1. NRC Inspection Report 05000445/2018402, 05000446/2018402, and 07200074/2018402 2. Supplemental Information

cc w/o encls: Electronic Distribution

ML18065A425 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18065A430 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE DRS/PSB1 DRS/PSB1 DRP/RBBA DRS/PSB1 DNMS NAME CJewett JGroom MHaire JGroom RKellar SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ DATE 2/21/18 2/22/18 2/28/18 3/6/18 3/6/18