|
---|
Category:Letter
MONTHYEARML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) IR 05000424/20244032024-05-0101 May 2024 Cyber Security Inspection Report 05000424/2024403 and 05000425/2024403 Public ML24120A2832024-04-30030 April 2024 Project Manager Reassignment NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000424/20240012024-04-23023 April 2024 –Integrated Inspection Report 05000424/2024001 and 05000425/2024001 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000424/20233012023-06-30030 June 2023 NRC Operator License Examination Report 05000424/2023301 and 05000425/2023301 ML22118A7302022-04-28028 April 2022 NRC Operator License Examination Report 05200025/2022301 and 0520026/2022301 ML22070A0892022-03-0707 March 2022 Reissue - Vogtle Electric Generating Plant Unit 3 & 4 - NRC Operator License Examination Report 05200025/2021301 and 05200026/2021301 IR 05000424/20213012022-01-13013 January 2022 NRC Operator License Examination Report 05000424/2021301 and 05000425/2021301 ML21312A1912021-11-0505 November 2021 License Examination Report 5200025/2021301 ML20127H9862020-05-0606 May 2020 NRC Operator License Examination Report 5200025/2020301 IR 05000424/20193012019-08-14014 August 2019 NRC Operator License Examination Report 05000424/2019301 and 05000425/2019301 ML19215A0112019-08-0303 August 2019 Il T22 NRC Post-Exam Comment ML18142B4542018-05-22022 May 2018 NRC Operator License Examination Report 5200025/2018302 ML17289A2332017-10-13013 October 2017 NRC Examination Report 05000424/2017301 and 05000425/2017301 IR 05000424/20153012015-11-24024 November 2015 NRC Operator License Examination Report 05000424/2015301 and 05000425/2015301 IR 05000424/20143012014-07-16016 July 2014 Er 05000424-14-301 & 05000425-14-301, 05/12-15/2014, Vogtle, Units 1 & 2, Operator License Examinations IR 05000424/20133012013-06-27027 June 2013 Er 05000424-13-301, 05000425-13-301; 04/15/2013 & 05/02/2013, and 05/10/2013; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations ML12249A2372012-09-0404 September 2012 Fairness Review (Fje 31AUG12) ML1216302872012-06-0707 June 2012 Er 05000424-12-301, 05000425-12-301, on March 26 - April 13, 2012, and April 20, 2012, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1212805692012-05-0707 May 2012 Vogtle Initial Exam 2012-301 Final SRO Written Exam ML1212805732012-04-26026 April 2012 Initial Exam 2012-301 Post Exam Comments IR 05000424/20113012011-05-12012 May 2011 Er 05000424-11-301, 05000425-11-301, on March 16 - 24, 2011, and April 1, 2011, Vogtle Electric Generating Plant Units 1 and 2, Operator License Examinations ML1032106432010-11-17017 November 2010 Notification of Licensed Operator Initial Examination 05000424-11-301 and 05000425-11-301 IR 05000424/20093012009-08-0707 August 2009 IR 05000424-09-301; IR 05000425-09-301, on 06/01/09 - 06/08/09, Vogtle Electric Generating Plan, Units 1 and 2 IR 05000424/20073012007-09-14014 September 2007 Er 05000424-07-301 and 05000425-07-301, on 07/30/2007 - 08/03/2007, and 08/15/2007, Vogtle Electric Generating Plant, Units 1 and 2; Licensed Operator Examinations 2023-06-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 24, 2015
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant ATTN: Mr. Brian Vice President 7821 River Road Waynesboro, GA 30830 SUBJECT: VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2-NRC OPERATOR LICENSE EXAMINATION REPORT 05000424/2015301 AND
05000425/2015301
Dear Mr. Taber:
During the period August 31 - September 4 and September 14 - 18, 2015, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Vogtle Electric Generating Plant Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating test and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on September 25, 2015.
All applicants passed both the operating test and written examination. There were no post-administration comments concerning the written examination or operating test. A Simulator Fidelity Report is included in Enclosure 2.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4662.
Sincerely,
/RA/ Eugene F. Guthrie, Chief
Operations Branch 2 Division of Reactor Safety
Docket Nos: 50-424, 50-425
License Nos: NPF-68, NPF-81
Enclosures: 1. Report Details 2. Simulator Fidelity Report
cc: Distribution via Listserv
_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRS SIGNATURE RSB2 AXG1 NTL2 EXL2 EFG NAME RBALDWIN AGOLDAU NLACY ELEA EGUTHRIE DATE 11/24/2015 11/24/2015 11/24/2015 11/24/2015 11/24/2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
REGION II
Docket No.: 50-424, 50-425
License No.: NPF-68, NPF-81
Report No.: 05000424/2015301 and 05000425/2015301
Licensee: Southern Nuclear Operating Company, Inc.
Facility: Vogtle Electric Generating Plant Units 1 and 2
Location: Waynesboro, GA 30830
Dates: Operating Test - August 31 - September - 4, 2015 and September 14 - 18, 2015 2015 Written Examination - September 25, 2015
Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer E. Lea, Regional Governmental Liaison Officer A. Goldau, Operations Engineer N. Lacy, Operations Engineer
Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety SUMMARY ER 05000424/2015301, 05000425/2015301, Operating Test August 31 - September - 4, 2015 and September 14 - 18, 2015 & Written Exam September 25, 2015; Vogtle Electric Generating Plant Units 1 and 2; Operator License Examinations. Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in ac cordance with the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examinati on Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable. Members of the Vogtle Electric Generating Plant Units 1 and 2 staff developed both the operating test and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021. The NRC administered the operating test during the period of August 31 - September - 4, 2015 and September 14 - 18, 2015. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015. All applicants passed both the operating test and written examination. All applicants were issued licenses commensurate wi th the level of examination administered. There were no post-examination comments. No findings were identified.
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Examinations a. Inspection Scope
The NRC administered the operating test during the period August 31 - September - 4, 2015 and September 14 - 18, 2015. The NRC examiners evaluated nine Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff administered the written examination on September 25, 2015 to nine RO and seven SRO applicants. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate Vogtle Electric Generating Plant Units 1 and 2, met the requirements specified in 10 CFR Part 55, "Operators' Licenses."
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A)
statement. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, "Operator Licensing Standards for Power Reactors."
The NRC reviewed the licensee's examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49,
"Integrity of examinations and tests."
The NRC evaluated the performance and fidelity of the simulation facility during the preparation and conduct of the operating test.
b. Findings No findings were identified.
The NRC developed the written examination sample plan outline. Members of the Vogtle Electric Generating Plant Units 1 and 2 training staff developed both the operating test and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 10, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
4 Using NUREG-1021, the NRC determined that the licensee's initial examination submittal was within the range of acceptability expected for a proposed examination.
Nine RO applicants and seven SRO applicants passed both the operating test and written examination. All applicants were issued licenses.
Copies of all individual examination reports were sent to the facility Training Director for evaluation of weaknesses and determination of appropriate remedial training. A copy of the final RO and SRO written examinations and answer keys may be accessed not earlier than September 25, 2017 in the ADAMS system (ADAMS Accession Numbers ML15300A490, ML15300A485).
4OA6 Meetings, Including Exit Exit Meeting Summary On September 18, 2015, the NRC examination team discussed generic issues associated with the operating test with Mr. Keith Tabor, Site - Vice President, and members of the Vogtle Electric Generating Plant Units 1 and 2 staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel
K. Tabor, Site - Vice President
D. Myers, Plant Manager
S. Briggs, Operations Director D. Stiles, Training Director M. Henson, Operations Training Director K. Jenkins, Examination Development Lead A. Lowe, Initial Licensed Training Lead K. Lewis, Licensed Operator Requalification Training Lead
G. Gunn, Regulator Affairs Manager K. Morrow, Senior Engineer, Regulator Affairs
Enclosure 2 SIMULATOR FIDELITY REPORT Facility Licensee: Vogtle Nuclear Generating Plant, Unit Nos. 1 & 2 Facility Docket No.: 50-424, 50-425 Operating Test Administered: August 31 - September - 4, 2015 and September 14 - 18 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with Inspection Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations. While conducting the simulator portion of the operating test, examiners observed the following:
There were NO simulator fidelity issues identified.