StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 26: | Line 26: | ||
D Classroom: | D Classroom: | ||
D Read to the examinee: | D Read to the examinee: | ||
Actual Performance: | Actual Performance: | ||
[gj Simulator: | [gj Simulator: | ||
[gj Plant: D I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | [gj Plant: D I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. | ||
Initial Conditions: | Initial Conditions: | ||
: 1. A reactor startup is in progress on Unit-1, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn | : 1. A reactor startup is in progress on Unit-1, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn | ||
: 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-1 CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure. | : 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-1 CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure. | ||
Are there any questions? | Are there any questions? | ||
You may begin. Task Standard: | You may begin. Task Standard: | ||
Terminates an Inadvertent Dilution During Reactor Startup and Restores Required Shutdown Margin Appendix C Evaluation Criteria: | Terminates an Inadvertent Dilution During Reactor Startup and Restores Required Shutdown Margin Appendix C Evaluation Criteria: | ||
Job Performance Measure Worksheet | Job Performance Measure Worksheet | ||
: 1. All critical steps completed (denoted by shading). | : 1. All critical steps completed (denoted by shading). | ||
: 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. Form ES-C-1 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | : 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. Form ES-C-1 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials: | ||
Procedures and manuals normally available in the control room General | Procedures and manuals normally available in the control room General | ||
Line 99: | Line 99: | ||
Result: SAT UNSAT ---------Examiner's Signature and Date: ---------------------- | Result: SAT UNSAT ---------Examiner's Signature and Date: ---------------------- | ||
Appendix C Initial Conditions: | Appendix C Initial Conditions: | ||
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. A reactor stmiup is in progress on Unit-I, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn | Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. A reactor stmiup is in progress on Unit-I, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn | ||
: 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) Form ES-C-I 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-I CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure. | : 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) Form ES-C-I 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-I CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure. | ||
Are there any questions? | Are there any questions? | ||
You may begin.}} | You may begin.}} |
Revision as of 00:25, 28 April 2019
ML15043A710 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs |
Issue date: | 02/09/2015 |
From: | Exelon Generation Co |
To: | Operations Branch I |
Shared Package | |
ML12067A049 | List: |
References | |
U01849 | |
Download: ML15043A710 (8) | |
Text
APPLICANT:
---CAL VERT CLIFFS NUCLEAR POWER PLANT 2012 INITIAL LICENSED OPERATOR EXAM JPM #: SIM-7 Appendix C Job Performance Measure Worksheet Form ES-C-1 Facility:
Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 Task Title: Respond to Inadvertent Dilution During Reactor Startup Task Number: 202.005 KIA
Reference:
015 A3.03 (3.9, 3.9) Method of testing: Simulated Performance:
D Classroom:
D Read to the examinee:
Actual Performance:
[gj Simulator:
[gj Plant: D I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
- 1. A reactor startup is in progress on Unit-1, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn
- 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-1 CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure.
Are there any questions?
You may begin. Task Standard:
Terminates an Inadvertent Dilution During Reactor Startup and Restores Required Shutdown Margin Appendix C Evaluation Criteria:
Job Performance Measure Worksheet
- 1. All critical steps completed (denoted by shading).
- 2. All sequential steps completed in order. 3. All time-critical steps completed within allotted time. Form ES-C-1 4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made. Required Materials:
Procedures and manuals normally available in the control room General
References:
OP-2, Plant Startup From Hot Standby To Minimum Load AOP-lA, Inadvertent Boron Dilution Time critical task: No Validation Time: 10 minutes Simulator Setup: 1. IC-8, with reactor subcritical, a startup in progress with only the shutdown CEAs withdrawn, and power in the CPS range. 2. Connect SDM and reset alarms. 3. 4. Set up the 1/M trending plot, on the Plant Computer, using OI-50A. Use System Lineup to change VCT concentration to 0. Modify the file to change the VCT concentration back to 897, but don't execute the file. It is not needed during the AOP to stop the dilution since the operator will fast borate. But changing the file back to 897 restores the simulator to its normal setup. 5. Run simulator until count rate begins to increase and a SDM alarm comes in, then freeze.
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded+ * =CRITICAL STEP) CUE: Have simulator driver place Simulator in RUN TIME START: ---D Identify and locate AOP-IA,Section VI D VI.A. I. -Stop any outward CEA motion. D VI.B.1. -Stop any makeup to the RCS. D VI.C.1. -IF the rate of power rise can NOT be stopped, THEN perform the following actions: D VI.C.1.a.
-Trip the Reactor. D VI.C.1.b.
-IMPLEMENT EOP-0, POST TRIP IMMEDIATE ACTIONS. D VI.C.2. -IF, due to dilution, the Reactor approaches criticality below Zero Power Transient Insertion Limit, 54.4 inches on Group 3, THEN perform the following actions ... D VI.C.3. -IF, due to dilution, the Reactor approaches criticality above the Zero Power Transient Insertion Limit, 54.4 inches on Group 3, THEN perform the following
... D VI.C.4. -IF count rate is slowly increasing, due to the dilution, THEN perform the following actions to control the count rate: CUE: CRS directs that CEAs not be inserted, at this time. D VI.C.4.a.
-Insert CEAs as necessary.
STANDARD Same as element Directs RO to stop any CEA withdrawal.
Verifies CVC-512 is shut and RC MIU Pps are stopped. Places HS-2520 in BYPASS and checks position indication for CVC-520. Checks WRNI indications to determine rate of power rise, at 1 COS. Determines Reactor trip not required.
Monitors WRNI power, SUR, SDM, 1/M to determine status of criticality and determines step is NIA. Monitors WRNI power, SUR, SDM, 1/M to determine status of criticality and determines step is N/ A. Determines step is applicable.
No action required.
CUE: After BA Pumps run 1 minute, CPS start to decrease.
D VI.C.4.b.
-Borate the RCS as necessary.
Determines step is applicable.
c >-A ,,.,.., t ;>!VI"' ,..,.r '\/(.(.( L r1..;; T L S rt("
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded+*=
CRITICAL STEP't D VI.C.4.b.(1)
-Shut the VCT M/U valve, 1-CVC-512-CV.
D VI.C.4.b.(4)
-Start CHG PPs as necessary.
D VI.C.4.b.(5)
-WHEN boration is complete, THEN stop borating:
0 VI.C.4.b.(5)(a)
-Stop the BA PPs. D VI.C.4.b.(5)(b)
-Shut the BA DIRECT MIU valve, l-CVC-514-MOV.
D VI.C.4.b.(5)(c)
-Stop CHG PPs as desired. STANDARD Same as element Same as element Same as element (Must start at least one) Same as element (Must ensure at least 1 Charging Pump operating)
Borates until CPS indication on 1 C05 starts to lower or the dilution source has been isolated per step VI.D.2.c.
Same as element Same as element Same as element Note to OP-2 specifies RCS Boron sampling, by Plant Chemistry, every 30 minutes during Evaluator:
the approach to criticality CUE: The STA has determined required SID boron concentration is adequate per NEOP-301.
Chemistry's latest grab sample indicates current RCS boron concentration is 1590 PPM. D VI.C.5. -Verify SDM is adequate ... D VI.D.l. -Verify correct lineup of the CVCS: D VI.D.1.a.
-Ensure MIU WTR FLO and CONC BA FLO controllers are in MANUAL and 0% output. D l-FIC-210X D 1-FIC-210Y No action required.
May elect to continue boration of the RCS, per step VI.C.4, until the dilution source is isolated Same as element Checks FIC-21 OX and Y operating mode in manual with output at "O". Checks CVC-210X and Y indicate shut.
Appendix C Job Performance Measure Worksheet Form ES-C-1 ELEMENT (shaded + * = CRITICAL STEP't STANDARD CUE: When dispatched, ABO reports 12 and 13 IX isolated and 11 IX is in service. 0 VI.D.1.b.
-Ensure that any CVCS IXs with deborating resin or unborated resin are removed Dispatches ABO to check IX lineup. from service PER OI-2D, PURIFICATION Determines lineup is correct. SYSTEM OPERATION.
CUE: When dispatched, ABO reports DW-190 was found shut. 0 VI.D.1.c.
-Ensure IX FLUSH ISOL valve, Dispatches ABO to verify DW-190 O-DW-190, is shut. is shut. CUE: When dispatched, PO reports Metering Pumps are off. CVC-258, 266 and 338 were found shut, CVC-308 was found partially open and has been shut. 0 VI.D.2 -Isolate any chemical additions.
Dispatches ABO to perform Steps a, b, c, d & e. 0 VI.D.2.a.
-Verify the following Pumps are secured: Same as element. 0 11 A Metering Pump 0 1 lB Metering Pump 0 VI.D.2.b.
-Verify shut CHEM ADD MTRG SKID Same as element. OUTLET ISOL VLV, 1-CVC-266.
0 VI.D.2.c.
-Verify shut RCMW TO CHG PP Same as element. SUCT, 1-CVC-308.
0 VI.D.2.d.
-Verify shut CHEM ADD SKID & Same as element. CHEM ADD TK INLET VL V, 1-CVC-258.
0
-Verify shut CHEM ADD & MTRG TK Same as element. COMB DISCH, 1-CVC-338.
0 VI.D.3 -If necessary, notify Plant Chemistry that Same as element. chemical additions have been secured. TERMINATING CUE: This JPM is complete when boration takes place to lower count rate and the dilution has been secured. The evaluator is expected to end the JPM. I TIME STOP: ---
Appendix C Job Performance Measure Worksheet Verification of Completion Job Performance Measure Number: SIM-7 Applicant:
NRC Examiner:
Date Performed:
Facility Evaluator:
Number of Attempts:
Time to Complete:
Form ES-C-1 Follow up Question:-------------------------
Applicant Response:
Result: SAT UNSAT ---------Examiner's Signature and Date: ----------------------
Appendix C Initial Conditions:
Job Performance Measure Worksheet EXAMINEE'S CUE SHEET 1. A reactor stmiup is in progress on Unit-I, OP-2 at step 6.6.G. 2. Shutdown CEAs are fully withdrawn
- 3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes) Form ES-C-I 4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM 5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes) 6. The "S/D MON HI" annunciator (1C05, window D-33) alarms 7. 11 Purification Ion Exchanger has been in service for three weeks 8. You are performing the duties of the Unit-I CRO Initiating Cue: The CRS directs you to respond to the reactivity excursion per the appropriate procedure.
Are there any questions?
You may begin.