Addendum to Final Operator Exam (Folder 3)
ML15043A710
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/09/2015
From:
Exelon Generation Co
To:
Operations Branch I
Shared Package
ML12067A049 List:
References
U01849
Download: ML15043A710 (8)


Text

APPLICANT: - - -

CALVERT CLIFFS NUCLEAR POWER PLANT 2012 ~NRC INITIAL LICENSED OPERATOR EXAM JPM #: SIM-7

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: Calvert Cliffs 1 & 2 Job Performance Measure No.: SIM-7 Task

Title:

Respond to Inadvertent Dilution During Reactor Startup Task Number: 202.005 KIA

Reference:

015 A3.03 (3.9, 3.9)

Method of testing:

Simulated Performance: D Actual Performance: [gj Classroom: D Simulator: [gj Plant: D Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

1. A reactor startup is in progress on Unit-1, OP-2 at step 6.6.G.
2. Shutdown CEAs are fully withdrawn
3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes)
4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM
5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes)
6. The "S/D MON HI" annunciator (1C05, window D-33) alarms
7. 11 Purification Ion Exchanger has been in service for three weeks
8. You are performing the duties of the Unit-1 CRO Initiating Cue:

The CRS directs you to respond to the reactivity excursion per the appropriate procedure. Are there any questions? You may begin.

Task Standard:

Terminates an Inadvertent Dilution During Reactor Startup and Restores Required Shutdown Margin

Appendix C Job Performance Measure Form ES-C-1 Worksheet Evaluation Criteria:

1. All critical steps completed (denoted by shading).
2. All sequential steps completed in order.
3. All time-critical steps completed within allotted time.
4. JPM completed within validated time. Completion time may exceed the validated time if satisfactory progress is being made.

Required Materials:

Procedures and manuals normally available in the control room General

References:

OP-2, Plant Startup From Hot Standby To Minimum Load AOP-lA, Inadvertent Boron Dilution Time critical task:

No Validation Time:

10 minutes Simulator Setup:

1. IC-8, with reactor subcritical, a startup in progress with only the shutdown CEAs withdrawn, and power in the CPS range.
2. Connect SDM and reset alarms.
3. Set up the 1/M trending plot, on the Plant Computer, using OI-50A.
4. Use System Lineup to change VCT concentration to 0. Modify the file to change the VCT concentration back to 897, but don't execute the file. It is not needed during the AOP to stop the dilution since the operator will fast borate. But changing the file back to 897 restores the simulator to its normal setup.
5. Run simulator until count rate begins to increase and a SDM alarm comes in, then freeze.

Appendix C Job Performance Measure Form ES-C-1 Worksheet ELEMENT (shaded+ * =CRITICAL STEP) STANDARD CUE: Have simulator driver place Simulator in RUN TIME START: - - -

D Identify and locate AOP-IA,Section VI Same as element Directs RO to stop any CEA D VI.A. I. - Stop any outward CEA motion.

withdrawal.

Verifies CVC-512 is shut and RC D VI.B.1. - Stop any makeup to the RCS.

MIU Pps are stopped.

Places HS-2520 in BYPASS and checks position indication for CVC-520.

D VI.C.1. - IF the rate of power rise can NOT be stopped, THEN perform the following actions: Checks WRNI indications to determine rate of power rise, at D VI.C.1.a. - Trip the Reactor.

1COS. Determines Reactor trip not D VI.C.1.b. - IMPLEMENT EOP-0, POST TRIP required.

IMMEDIATE ACTIONS.

D VI.C.2. - IF, due to dilution, the Reactor approaches Monitors WRNI power, SUR, SDM, criticality below Zero Power Transient Insertion 1/M to determine status of criticality Limit, 54.4 inches on Group 3, THEN perform the and determines step is NIA.

following actions ...

D VI.C.3. - IF, due to dilution, the Reactor approaches Monitors WRNI power, SUR, SDM, criticality above the Zero Power Transient Insertion 1/M to determine status of criticality Limit, 54.4 inches on Group 3, and determines step is N/A.

THEN perform the following ...

D VI.C.4. - IF count rate is slowly increasing, due to the dilution, THEN perform the following actions to Determines step is applicable.

control the count rate:

CUE: CRS directs that CEAs not be inserted, at this time.

D VI.C.4.a. - Insert CEAs as necessary. No action required.

CUE: After BA Pumps run for~ 1 minute, CPS start to decrease.

D VI.C.4.b. - Borate the RCS as necessary. Determines step is applicable.

c>- A ,,.,.., t ;>!VI"' ~ ,..,.r '\/(.(.(

L r1..;; T ~l(.l L S rt("

Appendix C Job Performance Measure Form ES-C-1 Worksheet ELEMENT (shaded+*= CRITICAL STEP't STANDARD D VI.C.4.b.(1) - Shut the VCT M/U valve, Same as element 1-CVC-512-CV.

Same as element Same as element (Must start at least one)

Same as element D VI.C.4.b.(4) - Start CHG PPs as necessary. (Must ensure at least 1 Charging Pump operating)

Borates until CPS indication on D VI.C.4.b.(5) - WHEN boration is complete, 1C05 starts to lower or the dilution THEN stop borating: source has been isolated per step VI.D.2.c.

0 VI.C.4.b.(5)(a) - Stop the BA PPs. Same as element D VI.C.4.b.(5)(b) - Shut the BA DIRECT MIU Same as element valve, l-CVC-514-MOV.

D VI.C.4.b.(5)(c) - Stop CHG PPs as desired. Same as element Note to OP-2 specifies RCS Boron sampling, by Plant Chemistry, every 30 minutes during Evaluator: the approach to criticality The STA has determined required SID boron concentration is adequate per NEOP-301.

CUE:

Chemistry's latest grab sample indicates current RCS boron concentration is 1590 PPM.

No action required. May elect to continue boration of the RCS, per D VI.C.5. - Verify SDM is adequate ...

step VI.C.4, until the dilution source is isolated D VI.D.l. - Verify correct lineup of the CVCS: Same as element D VI.D.1.a. - Ensure MIU WTR FLO and CONC BA FLO controllers are in MANUAL and 0% Checks FIC-21 OX and Y operating output. mode in manual with output at "O".

Checks CVC-210X and Y indicate D l-FIC-210X shut.

D 1-FIC-210Y

Appendix C Job Performance Measure Form ES-C-1 Worksheet ELEMENT (shaded + * = CRITICAL STEP't STANDARD CUE: When dispatched, ABO reports 12 and 13 IX isolated and 11 IX is in service.

0 VI.D.1.b. - Ensure that any CVCS IXs with deborating resin or unborated resin are removed Dispatches ABO to check IX lineup.

from service PER OI-2D, PURIFICATION Determines lineup is correct.

SYSTEM OPERATION.

CUE: When dispatched, ABO reports DW-190 was found shut.

0 VI.D.1.c. - Ensure IX FLUSH ISOL valve, Dispatches ABO to verify DW-190 O-DW-190, is shut. is shut.

When dispatched, PO reports Metering Pumps are off. CVC-258, 266 and 338 were CUE:

found shut, CVC-308 was found partially open and has been shut.

Dispatches ABO to perform Steps a, 0 VI.D.2 - Isolate any chemical additions.

b, c, d & e.

0 VI.D.2.a. - Verify the following Pumps are secured:

Same as element.

0 11 A Metering Pump 0 1 lB Metering Pump 0 VI.D.2.b. - Verify shut CHEM ADD MTRG SKID Same as element.

OUTLET ISOL VLV, 1-CVC-266.

0 VI.D.2.c. - Verify shut RCMW TO CHG PP Same as element.

SUCT, 1-CVC-308.

0 VI.D.2.d. - Verify shut CHEM ADD SKID &

Same as element.

CHEM ADD TK INLET VL V, 1-CVC-258.

0 VI.D.2.e~ - Verify shut CHEM ADD & MTRG TK Same as element.

COMB DISCH, 1-CVC-338.

0 VI.D.3 - If necessary, notify Plant Chemistry that Same as element.

chemical additions have been secured.

TERMINATING CUE: This JPM is complete when boration takes place to lower count rate and the dilution has been secured. The evaluator is expected to end the JPM.

I TIME STOP: - - -

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure Number: SIM-7 Applicant:

NRC Examiner:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Follow up Q u e s t i o n : - - - - - - - - - - - - - - - - - - - - - - - - -

Applicant Response:

Result: SAT UNSAT - - - - - - - - -

Examiner's Signature and Date: - - - - - - - - - - - - - - - - - - - - - -

Appendix C Job Performance Measure Form ES-C-I Worksheet EXAMINEE'S CUE SHEET Initial Conditions:

1. A reactor stmiup is in progress on Unit-I, OP-2 at step 6.6.G.
2. Shutdown CEAs are fully withdrawn
3. Regulating group CEAs are being withdrawn per OP-2 (There has been no rod motion for several minutes)
4. RCS Boron Concentration after completion last CEA withdrawal was 1690 PPM
5. Neutron counts unexpectedly begin to rise (30 CPS over the last five minutes)
6. The "S/D MON HI" annunciator (1C05, window D-33) alarms
7. 11 Purification Ion Exchanger has been in service for three weeks
8. You are performing the duties of the Unit-I CRO Initiating Cue:

The CRS directs you to respond to the reactivity excursion per the appropriate procedure. Are there any questions? You may begin.