Line 12: |
Line 12: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 5 | | | page count = 5 |
| | | project = |
| | | stage = RAI |
| }} | | }} |
|
| |
|
Revision as of 07:44, 22 April 2019
|
---|
Category:E-Mail
MONTHYEARML21287A4512021-10-15015 October 2021 Email for NuScale Topical Report Quality Assurance Program Description Topical Report -A Version Verification ML21154A1322021-05-26026 May 2021 Final Safety Evaluation Transmittal Email ML21053A2662021-02-22022 February 2021 SMR DC Docs - FW: NuScale EPZ Review Path Forward ML20203M1872020-07-14014 July 2020 Control Room Staffing Topical Report - NRC Staff'S Documentation of the Results of the Completeness Review ML20190A2352020-07-0808 July 2020 SMR DC Docs - Approved Version of NuScale Topical Report, Rod Ejection Accident Methodology, TR-0716-50350, Revision 1 ML20141L6102020-05-20020 May 2020 SMR DC Docs - NuScale Topical Report - Approved Version of NuScale Applicability of Areva Method for the Evaluation of Fuel Assembly Structural Response to Externally Applied Forces, TR-07116-50351, Revision 1 ML20090A8642020-03-30030 March 2020 SMR DC Docs - NuScale Topical Report - Approved Version of TR-0516-49417, Evaluation Methodology for the Stability of the NuScale Power Module, Revision 1 ML19331A7302019-11-27027 November 2019 SMR DC Docs - FW: Ibr Flow Chart ML19331A7382019-11-27027 November 2019 SMR DC Docs - FW: Chapter 18 (Di IP) Related (non-prop) ML19331A7262019-11-26026 November 2019 SMR DC Docs - (External_Sender) Ibr Flow Chart ML19329E7132019-11-25025 November 2019 SMR DC Docs - FW: Chapter 18 (Di IP) Related ML19323F6982019-11-19019 November 2019 DCA Technical Specification Confirmatory Items - Email Commitments ML19329E7022019-11-0606 November 2019 SMR DC Docs - (External_Sender) Chapter 18 (Di IP) Related ML19309D7862019-10-31031 October 2019 Reconciliation - NRR Response to Acrs' September 20 2019 Letter on NuScale Stability Analysis Topical Report ML19309E0172019-10-31031 October 2019 Reconciliation - NRR Response to Acrs'S September 24 2019 Letter on NuScale External Forces Topical Report ML19309F8612019-10-31031 October 2019 Reconciliation - NRR Response to Acrs'S September 25, 2019 Letter on the Focus Area Review Approach ML19276D2812019-10-0303 October 2019 SMR DC RAI - Request for Additional Information No. 526 Erai No. 9719 ML19235A1092019-08-23023 August 2019 SMR DC RAI - Request for Additional Information No. 525 Erai No. 9705 (19.02) ML19206B0772019-07-25025 July 2019 SMR DC Docs - FW: FW: NuScale Chapter 5 Section 5.2.3 - Changes to Information on Check Valves ML19171A0092019-06-20020 June 2019 SMR DC RAI - Request for Additional Information No. 524 Erai No. 9691 (3.9.4) ML19157A0352019-06-0606 June 2019 SMR DC RAI - Request for Additional Information No. 523 Erai No. 9682 (12.3-12.4, 9.3.2) ML19150A3172019-05-30030 May 2019 SMR DC RAI - Request for Additional Information No. 522 Erai No. 9681 (14) ML19151A0272019-05-30030 May 2019 SMR DC RAI - Request for Additional Information No. 522 Erai No. 9681 (14) ML19099A1272019-04-0909 April 2019 SMR DC Docs - FW: NuScale Comments Chapter 5 SER W/Ois ML19098A2362019-04-0808 April 2019 SMR DC Docs - FW: NuScale Comments Chapter 5 SER W/Ois ML19089A0112019-03-29029 March 2019 SMR DC Docs - NuScale Topical Report - Approved Version of Subchannel Analysis Methodology, TR-0915-17564, Revision 2 ML19081A2722019-03-22022 March 2019 SMR DC RAI - Request for Additional Information No. 521 Erai No. 9672 (19) ML19079A3632019-03-20020 March 2019 SMR DC RAI - Request for Additional Information No. 520 Erai No. 9642 (16) ML19077A2852019-03-18018 March 2019 SMR DC RAI - Request for Additional Information No. 519 Erai No. 9656 (12.03) ML19063D4042019-03-0404 March 2019 SMR DC RAI - Request for Additional Information No. 518 Erai No. 9659 (19) ML19062A0012019-03-0303 March 2019 SMR DC RAI - Request for Additional Information No. 518 Erai No. 9659 (19) ML19057A4382019-02-26026 February 2019 SMR DC Docs - March 5, 2019, Public/Closed Meeting on NuScale EPZ Sizing Methodology Topical Report_Nrc Staff Talking Points (Public) ML19056A5062019-02-25025 February 2019 SMR DC RAI - FW: Request for Additional Information No. 365 RAI No. 9309 (3.8.4) Rev 1 (to Remove Prop from Previous Subject Line) ML19046A0672019-02-15015 February 2019 SMR DC RAI - Request for Additional Information No. 517 Erai No. 9657 (12.03) ML19032A1202019-02-0101 February 2019 SMR DC RAI - Request for Additional Information No. 516 Erai No. 9647 (15.0.6) ML19016A2692019-01-16016 January 2019 SMR DC RAI - Request for Additional Information No. 515 Erai No. 9607 (12.02) Revision 1 ML19015A2782019-01-15015 January 2019 SMR DC RAI - Request for Additional Information No. 366 RAI No. 9292 (12.3) ML19015A2742019-01-15015 January 2019 SMR DC RAI - Request for Additional Information No. 486 Erai No. 9296 (12.3) ML19014A0882019-01-14014 January 2019 SMR DC RAI - Request for Additional Information No. 515 Erai No. 9607 (12.02) ML19014A0842019-01-14014 January 2019 SMR DC RAI - FW: Request for Additional Information No. 371 RAI No. 9373 (15.06.06) ML19003A1772019-01-0303 January 2019 SMR DC Docs - Approved Version of NuScale Topical Report TR-0616-48793, Nuclear Analysis Codes and Methods Qualification, Revision 1 ML19003A4612019-01-0303 January 2019 SMR DC Docs - Approved Version of Topical Report TR-0116-21012, NuScale Power Critical Heat Flux Corrections, Revision 1 ML18352B0812018-12-18018 December 2018 SMR DC RAI - Request for Additional Information No. 513 Erai No. 9643 (4.04) ML18352B0852018-12-18018 December 2018 SMR DC RAI - Request for Additional Information No. 514 Erai No. 9645 (4.04) ML18341A3452018-12-0707 December 2018 SMR DC RAI - NuScale Request for Additional Information -eRAI No. 9631, Section 6.2.6 - Cancelled ML18333A0212018-11-29029 November 2018 SMR DC RAI - Request for Additional Information No. 512 Erai No. 9634 (16) ML18324A8142018-11-20020 November 2018 SMR DC RAI - Request for Additional Information No. 511 Erai No. 9613 (12.02) ML18312A2492018-11-0808 November 2018 SMR DC Docs - FW: NuScale FSAR Draft Changes in Section 2.4.4 ML18309A2642018-11-0505 November 2018 SMR DC RAI - Request for Additional Information No. 510 Erai No. 9631 (6.2.6) ML18296A2342018-10-23023 October 2018 SMR DC RAI - Request for Additional Information No. 509 Erai No. 9608 (14.3.8) 2021-05-26
[Table view] |
Text
layouts."Chapter 18, "Human Factors Engineering," of NUREG0800, "Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition," and NUREG0711, "Human Factors Engineering Program Review Model," identify 0711, Review Criterion 2.4.4(2) says, "The applicant's method should-track issues until the potential for negative effects " "Human Factors Engineering Program Management Plan (HFE PMP), Section 5.1, "Availability of Human Factors Engineering Issue Tracking System," says the applicant uses a database to track human engineering discrepancies until rPMP, Section 5.4.8, "HED Process Flow" says Priority 2 HEDs have a direct or indirect impact on pla 0711, Review Criterion 2.4.1(4) says, "The applicant's HFE program should cover the MCR, remote shutdown facility lan."
The "Human Factors Engineering Operating Experience Review Results Summary Report," Table 31, "Comparison of commercial PWR systems to NuScale systems," identifies a "refueling monitoring station" in the NuScale plant design."Human Factors Engineering Staffing and Qualifications Results Summary Report" explains that refueling operations are performed by a dedicatThe "Concept of Operations," "Arrangement of HumanSystem Interfaces," indicates the HSIs associated with refueling are considered local control DCD Tier 2, Section 18.7.2.3.3, "HumanSystem Interface Style Guide" says, "to the HSI style guide."
"Aspects of the Human Factors Engineering Design not Verified During Verification and Validation," says, "Aspects of the HFE design that are not addressed in the HFE verification and validation include modifications to the standar d design and the HFE aspects that cannot be performed in the simulated environment. This may include design characteristics, such as new or modified displays for plant-specific design features. Features that may not be accurately simulated include
- ergonomic considerations, such as lighting and background noise.
- HSIs outside the MCR but within the plant HFE program scope, including the TSC, RSS, EOF, and certain LCSs."
Please clarify which LCSs are considered "certain LCSs" as discussed in
FSAR Tier 1, Section 3.15.1, "Design Description," says, "The HSI of the technical workload is assessed."FSAR Tier 2, Section 18.1.1.4, "Applicable Facilities," contains the same statement. The "Human Factors Engineering Program Management Plan" (HFE PMP), is incorporated by reference in FSAR Tier 2.2.2.3, "Applicable Facilities," says, The scope of the NuScale HFE program includes the alarms, controls, indications, and procedures applicable to the main control room (MCR) and the remote shutdown station (RSS). The HSI at the RSS are derived from the HSI in the MCR. The HSI of the TSC, the EOF, and local control stations (LCS) are also included implicitly since their HSI are derivatives of the MCR HSI. The EOF and the technical support center (TSC) will comply with the guidance of NUREG-0696, Functional Criteria for Emergency Response Facilities. The HSI in the TSC and EOF are derivatives of the MCR HSI and comply with the HSI style guide; however, these HSI are for information display only. No control functions are provided in any of the emergency response facilities. For these facilities, the program scope is limited to defining the plant data and their HSI impact on licensed operator workload.
0696, "Functional Criteria for Emergency Response Facilities."