L-18-013, Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedure Update: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:L____ --Pacific Gas and Electric Company..., October 4, 2018 PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Michael A. Ginn Manager Emergency Planning Oiablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update Dear Commissioners and Staff: Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3446 Internal:
691.3446 Fax: 805.545.6265 Pacific Gas and Electric Company (PG&E) submitted PG&E Letter DCL-18-074/DIL-18-012, "Emergency Plan and Implementing Procedures Update," dated September 26, 2018, in accordance with 10 CFR 50.54(q)(5) and the
* requirements of 1 O CFR 72.32, providing the NRC with changes made to the E_mergency Plan without prior NRC approval.
That submittal provided the most current revision (Revision 5.02) of DCPP's Emergency Plan, Appendix D. This letter includes, for information, Revision 5.00 of the Emergency Plan Appendix D "Emergency Action Level Technical Basis Manual," which was approved by the NRC in License Amendments 231 and 233. This manual is provided in the* Enclosure.
= ' This submittal does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans." PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. . *'"' *** If there are questions regarding this submittal, please contact me at (805) 545-3446.
A member of the STARS Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek \ A-x45 ;u/ll~szi rJ/ ... t-1UfVI ~>
Document Control Desk October 4, 2018 Page2 Sincerely, Michael A. Ginn Emergency Planning Manager armb/4743 Enclosure cc/enc: William C. Allen, NMSS Project Manager PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 Kriss M. Kennedy, NRC Region IV Administrator ChristopherW.
Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)
A member of the STARS Alliance Callaway
* Diablo Canyon
* Palo Verde
* Wolf Creek}}


=Text=
=Text=

Revision as of 05:28, 22 April 2019

Independent Spent Fuel Storage Installation - Submittal of Emergency Plan Implementing Procedure Update
ML18292A714
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/04/2018
From: Ginn M A
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-18-077, DIL-18-013
Download: ML18292A714 (2)


Text

L____ --Pacific Gas and Electric Company..., October 4, 2018 PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Michael A. Ginn Manager Emergency Planning Oiablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update Dear Commissioners and Staff: Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3446 Internal:

691.3446 Fax: 805.545.6265 Pacific Gas and Electric Company (PG&E) submitted PG&E Letter DCL-18-074/DIL-18-012, "Emergency Plan and Implementing Procedures Update," dated September 26, 2018, in accordance with 10 CFR 50.54(q)(5) and the

  • requirements of 1 O CFR 72.32, providing the NRC with changes made to the E_mergency Plan without prior NRC approval.

That submittal provided the most current revision (Revision 5.02) of DCPP's Emergency Plan, Appendix D. This letter includes, for information, Revision 5.00 of the Emergency Plan Appendix D "Emergency Action Level Technical Basis Manual," which was approved by the NRC in License Amendments 231 and 233. This manual is provided in the* Enclosure.

= ' This submittal does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans." PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. . *'"' *** If there are questions regarding this submittal, please contact me at (805) 545-3446.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek \ A-x45 ;u/ll~szi rJ/ ... t-1UfVI ~>

Document Control Desk October 4, 2018 Page2 Sincerely, Michael A. Ginn Emergency Planning Manager armb/4743 Enclosure cc/enc: William C. Allen, NMSS Project Manager PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 Kriss M. Kennedy, NRC Region IV Administrator ChristopherW.

Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Text

L____ --Pacific Gas and Electric Company..., October 4, 2018 PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Docket No. 72-26, Materials License No. SNM-2511 Michael A. Ginn Manager Emergency Planning Oiablo Canyon Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update Dear Commissioners and Staff: Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 805.545.3446 Internal:

691.3446 Fax: 805.545.6265 Pacific Gas and Electric Company (PG&E) submitted PG&E Letter DCL-18-074/DIL-18-012, "Emergency Plan and Implementing Procedures Update," dated September 26, 2018, in accordance with 10 CFR 50.54(q)(5) and the

  • requirements of 1 O CFR 72.32, providing the NRC with changes made to the E_mergency Plan without prior NRC approval.

That submittal provided the most current revision (Revision 5.02) of DCPP's Emergency Plan, Appendix D. This letter includes, for information, Revision 5.00 of the Emergency Plan Appendix D "Emergency Action Level Technical Basis Manual," which was approved by the NRC in License Amendments 231 and 233. This manual is provided in the* Enclosure.

= ' This submittal does not contain any privacy and proprietary information in accordance with NRC Generic Letter 81-27, "Privacy and Proprietary Material in Emergency Plans." PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter. . *'"' *** If there are questions regarding this submittal, please contact me at (805) 545-3446.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek \ A-x45 ;u/ll~szi rJ/ ... t-1UfVI ~>

Document Control Desk October 4, 2018 Page2 Sincerely, Michael A. Ginn Emergency Planning Manager armb/4743 Enclosure cc/enc: William C. Allen, NMSS Project Manager PG&E Letter DCL-18-077 PG&E Letter DIL-18-013 Kriss M. Kennedy, NRC Region IV Administrator ChristopherW.

Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager Senior Emergency Preparedness Inspector (RGN-IV/DR)

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek