Line 2: |
Line 2: |
| | number = ML073300418 | | | number = ML073300418 |
| | issue date = 11/29/2007 | | | issue date = 11/29/2007 |
| | title = Wolf Creek Nuclear Generating Station - Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) | | | title = Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) |
| | author name = Donohew J N | | | author name = Donohew J N |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLIV | | | author affiliation = NRC/NRR/ADRO/DORL/LPLIV |
Letter Sequence Other |
---|
TAC:MD0197, Steam Generator Tube Integrity (Withdrawn, Closed) |
|
MONTHYEARML0606004582006-01-31031 January 2006 Westinghouse Electric Company LLC LTR-CDME-05-209-NP, Steam Generator Tube Alternate Repair Criteria for the Portion of the Tube within the Tubesheet at the Wolf Creek Generating Station. Project stage: Request ET 06-0015, Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process2006-03-28028 March 2006 Supplement to Revision to Technical Specifications - Steam Generator Tube Integrity Using the Consolidated Line Item Improvement Process Project stage: Request ML0609001572006-04-10010 April 2006 Withholding from Public Disclosure, LTR-CDME-05-209-P, MD0197 Project stage: Other ML0616500992006-06-27027 June 2006 Request for Additional Information (RAI) Related to License Amendment Request (LAR) to Revise the Steam Generator Program Project stage: RAI WO 07-0012, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-05-0303 May 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0716504002007-06-19019 June 2007 Notice of Meeting with Wolf Creek Nuclear Corp Regarding Nrc'S Request for Additional Information on 2/21/06 Licensee Amendment Request Re SG Tube Surveillance Program, Wolf Creek Generating Station Project stage: RAI ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation Project stage: Meeting ML0719802032007-08-0707 August 2007 Summary of Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station to Discuss Second Request for Additional Information for Steam Generator Tube Surveillance Program LAR Project stage: RAI ML0722700022007-08-30030 August 2007 Topical Report, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ET 07-0043, Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program2007-09-27027 September 2007 Response to Request for Additional Information Related to License Amendment Request to Revise the Steam Generator Program Project stage: Response to RAI ML0730901272007-11-0808 November 2007 Notice of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss NRC Staff'S Request for Additional Information on Licensee'S Supplemental Letter to Letter Dated September 27, 2007, to Application Dated February 21, 2006 Project stage: RAI ML0732500032007-11-21021 November 2007 Memo to Thomas G. Hiltz Key Issues for Discussion for November 28, 2007 Meeting on Steam Generator Tube Inspection License Amendment (Tac MD0197) Project stage: Meeting ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) Project stage: Other ML0733700452008-01-0404 January 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Representatives Re Steam Generator Tube Surveillance Program Project stage: Meeting ML0803706102008-01-11011 January 2008 Westinghouse Electric Company LLC, LTR-CDME-08-2, Rev. 1 NP-Attachment, Meeting Handouts from the December 13, 2007 Meeting with Wolf Creek and NRR on H*/B*. Project stage: Request ML0804300062008-02-27027 February 2008 Request for Withholding Information from Public Disclosure, 01/11/2008 Affidavit Executed by J. A. Gresham, Westinghouse Electric Company LLC Project stage: Withholding Request Acceptance ML0804501852008-02-28028 February 2008 Withdrawal of License Amendment Request on Steam Generator Tube Inspections Project stage: Withdrawal RS-08-047, Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria2008-04-0101 April 2008 Withdrawal of License Amendment Request Related Steam Generator Tube Alternate Repair Criteria Project stage: Withdrawal 2007-06-19
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] Category:Proprietary Information Review
MONTHYEARML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure ML23093A2092023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML23093A0462023-04-14014 April 2023 Request for Withholding Information from Public Disclosure ML22048C2192022-02-22022 February 2022 Request for Withholding Information from Public Disclosure ML21274A0012021-10-14014 October 2021 Request for Withholding Information from Public Disclosure ML20253A2532020-09-29029 September 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142 (COVID-19)) ML20212L3652020-08-0606 August 2020 Request for Withholding Information from Public Disclosure (EPID L-2020-LLA-0142) (COVID-19) ML1108310262011-03-30030 March 2011 Request for Withholding Information from Public Disclosure - Proposed Denial of Request to Daryl M. Shapiro, Legal Counsel for Ameren Missouri ML0733004182007-11-29029 November 2007 Topical Report Withholding Information from Public Disclosure (Tac No. MD0197) ML0704705172007-02-21021 February 2007 Request for Withholding Information from Public Disclosure, TAC No. MD2654 ML0700302902007-01-24024 January 2007 Topical Report for Wolf Creek Generating Station - Request for Withholding Information from Public Disclosure ML0620704312006-07-31031 July 2006 Withholding of Information - Letter of Intent to Submit Combined License Application for Future Unit(S) at the Callaway Plant Site ML0524201542005-09-0707 September 2005 Withholding from Public Disclosure, Responses to NRC Request for Additional Information on WCAP-16265-P, Rev. 0, 'Callaway Replacement Steam Generator Program NSSS Licensing Report,' Dated February 2005 (CAW-05-1944) ML0524300462005-09-0707 September 2005 Withholding from Public Disclosure, Setpoint Methodology Portion of the Response to (NRC) Request for Additional Information, Questions 1 and 2 (CAW-05-1998) ML0524301332005-09-0707 September 2005 Callaway - Request for Withholding Information from Public Disclosure (CAW-05-2007) (Tac. MC4437) ML0410602032004-04-14014 April 2004 Request for Withholding Information from Public Disclosure for the Wolf Creek Generating Station and the Callaway Plant, Unit 1 ML0332406502003-11-20020 November 2003 Request for Withholding Information from Public Disclosure ML0319800992003-07-16016 July 2003 7/16/03 Callaway-Request for Withholding Info. from Public Disclosure-Application for Amd. Related to Steam Generator Tube Surveillance Program (CAW-03-1649/CAW-03-1650) (Tac. MB6478) ML0228805232002-11-0404 November 2002 Withholding from Public Disclosure, Steam Generator Tube Surveillance Program, TAC MB6478, CAW-02-1558 ML0212807042002-05-23023 May 2002 Withholding from Public Disclosure, Re Issuance of Amendment on Steam Generator Tube Surveillance Program ML0211400622002-05-0202 May 2002 Memo to File, Request for Withholding Information from Public for a Supplemental Letter on the Electrosleeve License Amendment Request for Callaway (Tac No. MB1214) 2023-08-15
[Table view] |
Text
November 29, 2007Mr. J. A. GreshamManager, Regulatory Compliance and Plant Licensing Nuclear Services Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
TOPICAL REPORT FOR WOLF CREEK GENERATING STATION - REQUESTFOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MD0197)
Dear Mr. Gresham:
By letter dated September 25, 2007 (CAW-07-2335), Westinghouse Electric Company(WEC) submitted an affidavit (CAW-07-2335) also dated September 25, 2007, executed by you, requesting that information designated proprietary in the topical report entitled, LTR-CDME-07-198-P, "Response to NRC Request for Additional Information Relating to
[topical report] LTR-CDME-05-209-P of the Wolf Creek Generating Station (WCGS) Permanent B* License Amendment Request," dated September 24, 2007, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2,Section 390. The topical report and the WEC letter are Enclosures I and III, respectively, to theletter dated September 27, 2007 (ET 07-0043), from the Wolf Creek Nuclear Operating Corporation (WCNOC) to the Nuclear Regulatory Commission (NRC), for the Wolf Creek Generating Station.A nonproprietary copy of the document designated LTR-CDME-07-198-NP, which isEnclosure II to the above September 27, 2007, letter from WCNOC, has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room (ADAMS AccessionNo. ML072750610).The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons:Under that system, information is held in confidence if it falls in or more of several types,the release of which might result in the loss of an existing or potential competitive advantage, as follows:(a)The information reveals the distinguishing aspects of a process (orcomponent, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
J. A. Gresham-2-(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential economic value to Westinghouse.We have reviewed your application and the material designated as proprietary in topical reportLTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1307.Sincerely,/RA/Jack N. Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483 cc: See next page J. A. Gresham-2-(c)Its use by a competitor would reduce his expenditure of resources orimprove his competitive position in the design, manufacturer, shipment, installation, assurance of quality, or licensing a similar product.(e)It reveals aspects of past, present, or future Westinghouse or customerfunded development plans and programs of potential economic value to Westinghouse.We have reviewed your application and the material designated as proprietary in topical reportLTR-CDME-07-198-P, dated September 24, 2007, in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the information marked as proprietary in topical report LTR-CDME-07-198-P, dated September 24, 2007, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at (301) 415-1307.Sincerely,/RA/Jack N. Donohew, Senior Project ManagerPlant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-483 cc: See next pageDISTRIBUTION
- PUBLIC LPL4 Reading RidsNrrDorl RidsNrrDorlLpl4RidsNrrDorlDprRidsNrrPMJDonohew RidsNrrLAJBurkhardt RidsOgcRpRidsAcrsAcnwMailCenterRidsRgn4MailCenter RidsNrrDciCsgb EMurphy, NRR/DCI/CSGBADAMS ACCESSION NO.: ML073300418NRR-084OFFICEDORL/LPL4/PMDORL/LPL4/LADCI/CSGB/BCDORL/LPL4/BCNAMEJDonohewJBurkhardtAHiserTHiltz DATE11/28/0711/27/0711/27/0711/28/07OFFICIAL RECORD COPY February 2006Wolf Creek Generating Station cc:Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, D.C. 20037Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 311 Burlington, KS 66839Chief Engineer, Utilities DivisionKansas Corporation Commission 1500 SW Arrowhead Road Topeka, KS 66604-4027Office of the GovernorState of Kansas Topeka, KS 66612Attorney General120 S.W. 10 th Avenue, 2 nd FloorTopeka, KS 66612-1597County ClerkCoffey County Courthouse 110 South 6 th StreetBurlington, KS 66839Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, KS 66612-1366Vice President Operations/Plant ManagerWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839Supervisor LicensingWolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839U.S. Nuclear Regulatory CommissionResident Inspectors Office/Callaway Plant
8201 NRC Road Steedman, MO 65077-1032Mr. Rick A. MuenchPresident and Chief Executive Officer Wolf Creek Nuclear Operating Corporation Post Office Box 411 Burlington, KS 66839