IR 05000498/2016403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML16210A507
| number = ML16210A507
| issue date = 07/28/2016
| issue date = 07/28/2016
| title = South Texas Project Electric Generating Station, Units 1 and 2 - Cover Letter for NRC Security Inspection Report 05000498/2016403; 05000499/2016403
| title = Project Electric Generating Station, Units 1 and 2 - Cover Letter for NRC Security Inspection Report 05000498/2016403; 05000499/2016403
| author name = Haire M S
| author name = Haire M S
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1

Revision as of 19:28, 6 April 2019

Project Electric Generating Station, Units 1 and 2 - Cover Letter for NRC Security Inspection Report 05000498/2016403; 05000499/2016403
ML16210A507
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/28/2016
From: Haire M S
Plant Support Branch-1
To: Koehl D
South Texas
References
IR 2016403
Download: ML16210A507 (4)


Text

" " July 28, 2016

Mr. Dennis Koehl President and CEO STP Nuclear Operating Company South Texas Project Electric

Generating Station P.O. Box 289 Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2016403; 05000499/2016403

Dear Mr. Koehl:

On June 16, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2 and the inspector discussed the results of this inspection with Mr. Gerald Powell, Executive Vice President and Chief Nuclear Officer, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspector did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholdi ng," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security

vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to SEC URITY-RELATED INFORMATION provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response.

Sincerely,/RA/

Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-498 and 50-499

License Nos. NPF-76 and NPF-80

Nonpublic

Enclosure:

NRC Inspection Report 05000498/2016403; 05000499/2016403

w/Attachment:

Supplemental Information

cc w/o enclosure: Electronic Distribution

ML16210A507 Entire Report: SUNSI Review Complete: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: NRC-002 MD 3.4 Non-Public A.3 Cover Letter Only:

SUNSI Review Complete: MLC Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: RGN-002 SUNSI Review Complete OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:PSB1 NAME MChambers MBrooks MHaire NTaylor MHaire SIGNATURE e-mail e-mail e-mail /RA/ /RA/ DATE 7/25/16 7/25/16 7/25/16 7/27/16 7/28/16 SEC URITY-RELATED INFORMATION Letter to Dennis Koehl from Mark S. Haire, dated July 28, 2016

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2016403; 05000499/2016403 Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Senior Resident Inspector (Alfred.Sanchez@nrc.gov) Resident Inspector (Nicholas.Hernandez@nrc.gov)

Branch Chief, DRP/B (Nick.Taylor@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Project Engineer, DRP/B (Shawn.Money@nrc.gov) STP Administrative Assistant (Lynn.Wright@nrc.gov)

Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Lisa.Regner@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

SAIC (Gayle.Walker@nrc.gov)

RSLO (Bill.Maier@nrc.gov)

RidsOeMailCenter Resource