ML17192A481: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML17192A481
| number = ML17192A481
| issue date = 07/10/2017
| issue date = 07/10/2017
| title = Waterford 3 - Acceptance Review for Relief Request PRR-WF3-2017-3 for HPSI Pump AB (MF9875)
| title = 3 - Acceptance Review for Relief Request PRR-WF3-2017-3 for HPSI Pump AB (MF9875)
| author name = Pulvirenti A L
| author name = Pulvirenti A L
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV

Revision as of 08:44, 6 April 2019

3 - Acceptance Review for Relief Request PRR-WF3-2017-3 for HPSI Pump AB (MF9875)
ML17192A481
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/10/2017
From: Pulvirenti A L
Plant Licensing Branch IV
To: Zamber M
Entergy Nuclear Operations
References
MF9875
Download: ML17192A481 (2)


Text

1 NRR-PMDAPEm Resource From:Pulvirenti, April Sent: Monday, July 10, 2017 10:46 AM To: Zamber, Maria Cc:Wolfgang, Robert; Alley, David; Pascarelli, Robert

Subject:

Waterford 3 - Acceptance Review for Re lief Request PRR-WF3-2017-3 for HPSI Pump AB (MF9875)

Maria, By letter dated June 27, 2017, (Agencywide Docu ments Access and Management System (ADAMS) Accession No. ML17178A459), Entergy submitted a relief request and request for alternative for HPSI Pump AB at Waterford Unit 3. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory

Commission (NRC) staff's acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application. In accordance with LIC-109, Revision 1, the staff has concluded that the application does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed

technical review, there may be instances in which issu es that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 110 total hours to complete. The NRC staff expects to complete this review in approximately seven months, which is January 31, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional

information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

April

Dr. April L. Pulvirenti Project Manager, Waterford Unit 3 United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 301-415-1390

Hearing Identifier: NRR_PMDA Email Number: 3598 Mail Envelope Properties (April.Pulvirenti@nrc.gov20170710104500)

Subject:

Waterford 3 - Acceptance Review for Relief Request PRR-WF3-2017-3 for HPSI Pump AB (MF9875) Sent Date: 7/10/2017 10:45:35 AM Received Date: 7/10/2017 10:45:00 AM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients: "Wolfgang, Robert" <Robert.Wolfgang@nrc.gov> Tracking Status: None "Alley, David" <David.Alley@nrc.gov> Tracking Status: None "Pascarelli, Robert" <Robert.Pascarelli@nrc.gov> Tracking Status: None "Zamber, Maria" <mzamber@entergy.com> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 2716 7/10/2017 10:45:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: