ML071940120: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML071940120
| number = ML071940120
| issue date = 07/25/2007
| issue date = 07/25/2007
| title = Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits (TAC Nos. MD2650, MD2651, and MD2652)
| title = Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits (TAC Nos. MD2650, MD2651, and MD2652)
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV

Revision as of 09:41, 10 February 2019

Technical Specifications, Revised Shutdown Control Element Assembly Insertion Limits (TAC Nos. MD2650, MD2651, and MD2652)
ML071940120
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/25/2007
From:
NRC/NRR/ADRO/DORL/LPLIV
To:
Markley, M T, NRR/DORL/LP4, 301-415-5723
Shared Package
ML071940113 List:
References
TAC MD2650, TAC MD2651, TAC MD2652
Download: ML071940120 (2)


Text

Shutdown CEA Insertion Limits 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Shutdown Control Element Assembly (CEA) Insertion Limits LCO 3.1.6 APPLICABILITY:

All shutdown CEAs shall be withdrawn to > 147.75 inches.MODE 1.MODE 2 with any regulating CEA not fully inserted................----..

.--- NOTE-----------------------------

This LCO is not applicable while performing SR 3.1.5.3.I ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One shutdown CEA not A.1 Restore shutdown CEA 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> within limit, to within limit.B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.I PALO VERDE UNITS 1.2,3 3.1.6.-1 AMENDMENT NO. 44.; 168 Shutdown CEA Insertion Limits S SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify each shutdown CEA is withdrawn 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s> 147.75 inches.I PALO VERDE UNITS 1.2.3 3.1.6-2 MENDMENT NO. 4477, 168