{{#Wiki_filter:JPM- ANO-2-JPM-RO-NRC-A3 JOB PERFORMANCE MEASURE UNIT:  2  REV #:        DATE:  14 July 2003 SYSTEM/DUTY AREA: A.3 Radiation Control TASK:  Utilization of Radiation Work Package to determine radiation equipment requirements for a job as well as ALARA concerns JTA#:  KA VALUE  RO:
2.9  SRO: 3.3  KA
 
==REFERENCE:==
 
2.3.10  APPROVED FOR ADMINISTRATION TO:  RO:
X  SRO: X  TASK LOCATION: INSIDE CR:  OUTSIDE CR:
X  BOTH:  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE:    SIMULATOR:  Perform  Perform LAB:
POSITION EVALUATED:  RO:    SRO:
ACTUAL TESTING ENVIRONMENT:  SIMULATOR:  PLANT SITE:  LAB:
TESTING METHOD:  SIMULATE:    PERFORM:
APPROXIMATE COMPLETION TIME IN MINUTES: 15 minutes  REFERENCE (S):  EXAMINEE'S NAME:
SSN:              -           
  -      EVALUATOR'S NAME:          THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:      UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time:    Stop Time:    Total Time:
SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
JOB PERFORMANCE MEASURE This JPM is to be conducted in conjunction with JPM B.2.b ANO-2-JPM-NRC-SFPSW Add water from Loop II SW to the Spent Fuel Pool.
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
Inform the examinee that the JPM shall begin as soon as the RCA control point is reached. Provide the RWP to the examinee.
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
: 1. Plant is DEFUELED and all cask loading operations are secured.
: 2. Power has been lost to both SFP cooling pumps and 2K11-K5 "FUEL POOL TEMP HI" is in alarm.
: 3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
: 4. SFP purification is out of service for replacement of 2FP-10, SFP purification pump discharge.
: 5. Fuel Pool low level alarm is in and SFP level is lowering.
The SM/CRS directs, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006," Section 10.0 beginning with step 10.5" TASK STANDARD: 2.3.10 Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
TASK PERFORMANCE AIDS: RWP, Dosimeter, protective clothing as necessary SIMULATOR INITIAL CONDITIONS:
 
JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006," Section 10.0 beginning with step 10.5" Hand the examinee the RWP and survey for this JPM when he is ready to enter the RCA CRITICAL ELEMENTS (C): 1, 2 PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 1.  (C) Review RWP.
Identify required dosimetry from the survey map.
POSITIVE CUE:
Dosimeter obtained Examinee reviews the RWP and survey map to determine requirements. Identifies that the required dosimetry based on the provided survey is only a TLD.
N/A SAT UNSAT N/A SAT UNSAT
: 2.    (C) Obtain Electronic Alarming Dosimeter (EAD) from the rack outside the CAA entrance and activate it at the access turnstile using appropriate Radiation Work Permit number, and enters the CAA when access is granted.
Determine the requirements for dosimetry, clothing, and respirators.
POSITIVE CUE:
Examinee will obtain an EAD and insert the EAD into the activation slot, scan the bar code on his TLD, and follow the instructions on the screen. Entering RWP number and answering the questions on the computer fields of the access terminal. Once all fields have been entered appropriately, access is granted.
Used RWP and survey provided to determine that protective clothing is required to be worn in this area.
N/A SAT UNSAT N/A SAT UNSAT
: 3. Dons personal safety equipment as required inside the CAA Hardhat, safety glasses, and earplugs worn where required in the CAA. N/A SAT UNSAT 4. (C) While in the CAA the examinee observes and adheres to all applicable postings and entry requirements. While in the CAA the examinee observes and adheres to all applicable postings and entry requirements.
N/A SAT UNSAT
: 5. Determines radiological status of area around valves to be operated to refill SFP. Determines or knows that the area around valves to be operated to refill SFP is a contamination area.
N/A SAT UNSAT 
: 6.  (C) Determines requirements for entry into the contaminated area around the SFP. NO additional dosimetry, single PCs, and no pre-job brief.
N/A SAT UNSAT 7. (C) When exiting the CAA the examinee enters the control point area and enters a PCM-1 monitor. Examinee clears the PCM-1 monitor and exits.
N/A SAT UNSAT 8. (C) If hand carried materials were taken into the CAA, they will be cleared through the tool contamination monitor (TCM) Examinee places hand carried items in the TCM for counting N/A SAT UNSAT
: 9. After clearing the PCM-1 monitor, the examinee exits through the Portal Monitor Examinee clears the Portal Monitor  N/A SAT UNSAT
: 10. Examinee deactivates EAD at final exit of session Examinee deactivates his EAD and returns it to the Health Physics rack.
Terminating cue: Egress from CAA completed.
END RWP      ANO      Page 1 of 3 Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2003-0005  SECTION I                                            RWP DESCRIPTION START DATE: 01-Jan-2003 END DATE: 31-Dec-2003 RWP TYPE: General DESCRIPTION:
Tours and Inspections SYSTEM        COMPONENT                                                                    BLDG                  LOCATION NA                      NA                                                                                    A1                        Non LHRA's  NA                      NA                                                                                    A2                        Non LHRA'sl  NA                      NA                                                                                  OSCA                    Non LHRA's JOB CONTACTS. Various ALARA CODE....C0008011  JOB CODE......ROS-                                                                                  ALARA CAT.....Level II SECTION II                                              TASK LIST ESTIMATED TASK  STATUS  TASK DESCRIPTION PR-HR PER-REM 1 Active Non Locked High Radiation Areas 116709. 0.617  TOTALS l116709. 0.617  SECTION III RWP REVIEWS AND APPROVAL Originator        FULTZ    MW        19-Dec-2002    Development        RASMUSSON  DC    19-Dec-2002  ALARA Eval  RASMUSSON DC  19-dec-2002      HP Supv.              RASMUSSON DC 19-Dec-2002  Terminated      ____________        ___________    Completed            ____________ ___________  Withdrawn      ____________        ___________
Fri  Jun 6 07:30:50 2003  working      RWP 2003-0005 RWP      ANO    Page 2 of 3 SECTION IV            PROTECTIVE REQUIREMENTS BY TASK      Rev 0            RWP 2003-0005 TASK TASK DESCRIPTION ( Task# 1 ) 
: 1) Non Locked High Radiation Areas RADIOLOGICAL CONDITIONS ( Task# 1 ) Component/Location (mrem/Hr)  Gen              Max Dpm/100cm2 Yr/DANI#  A1,A2 OSCA 1 1 200 80 <1K <1K  Monthly pkg Monthly pkg Dosimetry : Whole body TLD required, and Alarming Dosimeter.
Fri Jun 6  07:30:50 2003  working      RWP 2003-0005 RWP    ANO      Page 3 of 3 SECTION IV            PROTECTIVE REQUIREMENTS BY TASK      Rev 0            RWP 2003-0005 TASK                                                        TASK DESCRIPTION (Task# 1) ------------------------- SPECIAL INSTRUCTIONS ------------------------ ALARA Actions: 
: 1) Unless otherwise directed by RP supervision, Electronic Alarming Dosimeter (EAD) set points will be 5 mrem dose and 40 mrem/hr dose rate. 
: 2) Utilize low dose areas whenever possible to minimize exposure.
Monitoring: 
: 1) Notify the zone coverage RP or the on duty shift RP of areas to be entered and work to be performed. 
: 2) Area posting/survey maps should be reviewed to ensure awareness of radiological conditions in your work area. This information can be obtain from one or more of the following:  A.) RWP - Radiological Conditions Section. B.) Area Posting - Locale posting in the field. C.) Status Board - At CA-2, Unit-1 elevation 404', Unit-2 elevations 354', 335' and 317' general areas. D.) Surveys Maps - Posted outside cubicles. (Unit-1 only, 386' elevation and below). E.) RWP File - Contact RP if file is desired. F.) RP Personnel - Contact RP @ CA-1 (#5166), or use radios (on channel 2), located at CA-2 386' dress out area, 354' and 335' elevations near the elevators. 
: 3) Periodically check Electronic Alarming Dosimeter (EAD). This check should be more frequent in areas where your ability to hear the alarm is diminished. If any EAD alarm is received secure work, exit  area, and notify RP. 
: 4) Initial/intermittent RP coverage is required for entry into High Radiation Areas unless the individual is "Category 3 Advanced Radworker" qualified and has the appropriate radiation survey meter at all times during the entry. NOTE: An EAD is not an appropriate survey meter. 
: 5) Prior to entering a "Radioactive Materials Area" outside Controlled Access, contact RP to ensure all personnel, equipment, and material is evaluated for appropriate monitoring upon exit.
Work Controls:
: 1) Ensure the proper surveys are performed prior to removing any items from the RCA. Respiratory:
l1) Based on historical and current data Airborne Activity is <30% DAC. Respiratory protection is not required unless otherwise posted.
Anti-C's: 
: 1) Use Anti-C's appropriate for the area to be entered.
Fri  Jun 6  07:30:50  2003  working      RWP 2003-0005
 
8 FOR TRA I NING PURPOSES ONLY SM EAR DATA (D PM/100cm 2) SURVEY DATA 1- 2000 2- 3000 3- 800 4- 1000 5- 200 6- 400 L.A.S. Da ta  (cpm/L A S)  1. 20 2. 30 3. 20 4. 20 5. 40 6. 35 Un it: 2 B u ild in g: RAB Elev ation: 404 R oom: 2151 R x Pw r: 100 T e m p l a t e: 2A 2-24 Fr e q ue nc y: m o nt hl y S u rv ey D a t e: 07-01-2003 S u rv ey T i m e: 21: 10: 00 Statu s: Co m p lete R W P: 1 T a s k 1 D A N#: 5-1-7 Su rve y e d B y: K e i t h A. M u rra y Badg e: 956 R e vi ew ed B y: J a m e s D. L oop er No tes: Peer C h eck by BEK/837 Alpha Da ta (D PM/100cm 2) Inst r u m e nt s Use d In s t ru m e n t: R A M-ION-R A M-049 C a l D u e: 08-31-2003 S r cC k D u e: 07-04-2003 D/C & B k g N/A N/A  In s t ru m e n t: R M-C HP-C R-106 C a l D u e: 07-30-2003 SrcC k Du e:N/A D/C & Bk g  10  100 L.A.S. Alpha (cpm/L A S)        A l l Radi at i on val ues are i n m r em/hour unl es s ot herw i s e not ed S m ear res u l t s: < 1000 dpm
/100c m 2 or < 100 CCP M/L A S unl es s ot herw i s e not ed      O S m ear l o c a t i on (100c m 2) Large A r ea S m ear (LA S) l o c a t i on ANO-2-JPM-NRC-CVCS2    PAGE 1 OF  5  JOB PERFORMANCE MEASURE
 
UNIT: 2  REV #: 003  DATE:    SYSTEM/DUTY AREA:
Chemical and Volume Control System TASK:  Perform Emergency Boration (Alternate Success Path)
JTA#:  ANO2-RO-EOPAOP-OFFNORM-193 (Perform Emergency Boration)
KA VALUE  RO:  3.9  SRO:  3.7  KA REFEREN CE:  004 A4.07  APPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:  PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
7 Minutes  REFERENCE (S):
OP 2203.032, OP 2103.015 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:  THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS
 
JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A
 
QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-CVCS2  PAGE 2 OF  5 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "B riefing Checklist
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Mode 3, A Shutdown Margin is calculated following a reactor trip.
TASK STANDARD:
Greater than or equal to 40 g allons per minute boric acid solution being injected into the RCS using BAM Pumps via Emergency Borate Valve (2CV
-4916-2). This is an alternate success path JPM.
TASK PERFORMANCE AIDS:
AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin , OP 2103.015 Worksheet 4,  showing SDM not met.
SIMULATOR SETUP:
A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.
The elements of this file are:
Trigger 5 = 2CV
-4873-1a = 75%. 2CV
-4873-1a (VCT Outlet) malfunction set to 75%;  Then overrides 2HS
-4873-2 are set to false and 2HS
-4873-3 set to false to turn lights off.
This case file will simulate the VCT Outlet valve tripping its output breaker due to a motor fault as it tries to shut.
 
ANO-2-JPM-NRC-CVCS2  PAGE 3 OF  5 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required."  CRITICAL ELEMENTS (C):      1, 5, 6 PERFORMANCE CHECKLIST STANDARD (Circle One)
(C) 1. Review SDM calculation and recognize SDM is not met for
 
current condition
: s. Recognize that SDM is not met and that emergency boration is
 
required. N/A  SAT  UNSAT EXAMINERS NOTE:
Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.
EXAMINERS CUE
: When asked which method of Emergency boration is recommended, give the following CUE:
"Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2."
: 2. Verify at least one Charging Pump (CCP) running with flow greater
 
than 40 GP M. POSITIVE CUE:
Red light(s) ON.
Flow is greater than 40 gpm.
On Panel 2C09, verified CCP(s) running. Observed red light ON; green light OFF above at least one of the
 
following handswitch(es):
2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-485 3-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40
 
gpm on Charging Header Flow
 
(2FIS-4863). N/A  SAT  UNSAT
: 3. Align Boric Acid Supply To CCP Suction. POSITIVE CUE:
Red light(s) ON.
NEGATIVE CUE:
Green light(s) ON.
On Panel 2C0 9, opened BAMT Gravity Feed Valves 2CV
-4920-1 and/or 2CV
-4921-1  Observed red light ON and green
 
light OFF above handswitch(es):
* 2HS-4920-1 for 2CV-4920-1
* 2HS-4921-1 for 2CV-4921-1    N/A  SAT  UNSAT EXAMINER'S NOTE:
In the following step the VCT Outle t Valve will NOT close requiring an alternate success path.
 
ANO-2-JPM-NRC-CVCS2  PAGE 4 OF  5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
: 4. Close Volume Control Tank (VCT)
Outlet Valve (2CV
-4873-1). POSITIVE CUE:
Green light OFF.
Red light OFF.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, observed that 2CV-4873-1 did NOT go clos ed. Observed green light OFF; red
 
light OFF above VCT Outlet Valve
 
handswitch (2HS
-4873-1). N/A  SAT  UNSAT (C) 5. Start at least ONE BAM Pump.
POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C09, start 2P39A and/or 2P39B. Obser ved RED light ON above the BAM pump started, 2HS
-4919-2 (2P39A) or 2HS
-4910-2 (2P39B).
N/A  SAT  UNSAT (C) 6. Open Emergency Borate From BAM Pumps Valve (2CV
-4916-2). POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C09, opened 2C V-4916-2. Observed red light ON; green light OFF above Emergency Borate
 
Valve, 2CV
-4916-2. N/A  SAT  UNSAT
: 7. Verify Boric Acid Makeup Flow Control Valve (2CV
-4926) closed.
POSITIVE CUE:
Green light ON.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, ver ified 2CV-4926 closed.
Observed green light ON; red light
 
OFF above Boric Acid Makeup
 
Flow Controller (2FIC
-4926). N/A  SAT  UNSAT
: 8. Check Reactor Makeup Water Flow Control Valve (2CV
-4927) or VCT Makeup Isol valve (2CV
-4941) closed. POSITIVE CUE:
G reen light ON.
NEGATIVE CUE:
Red light ON.
On Panel 2C09, verified 2CV
-4927 or 2CV
-4941 closed.
Observed green light ON; red light
 
OFF above Reactor Makeup
 
Water Flow Controller
 
(2FIC-4927) or above 2CV
-4941 handswitch.
N/A  SAT  UNSAT
: 9. Check Charg ing Header Flow (2FIS-4863) greater than 40 gpm.
POSITIVE CUE:
Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)
On Panel 2C09 (upright portion), observed flow greater than 40
 
gpm on Charging Header Flow
 
indicator (2FIS
-4863). N/A  SAT  UNSAT
 
ANO-2-JPM-NRC-CVCS2  PAGE 5 OF  5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)
EN D ANO-2-JPM-NRC-CVCS2  PAGE 6 OF  5 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:
Mode 3. A Shutdown Margin is calculated following a reactor trip. 
 
INITIATING CUE:
The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform
 
actions as required."
INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE  2203.032  EMERGENCY BORATION 04/30/02  2 of 14    NOTE  Step s with (*) are continuous action steps.
: 1. Refer to 1903.010,  Emergency Action Level Classification.
: 2. Verify at least ONE Charging pump running with flow greater than 40 gpm. 2. Perform the following:
A. IF in Mode 1 or 2,  THEN perform the foll owing:  1) Trip Reactor.
: 2) GO TO 2202.001,  Standard Post Trip Actions.
B. IF in Mode 3, 4, 5, or 6,  THEN perform the following:
: 1) Verify TCBs open.
: 2) GO TO Step 8.
INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE  2203.032  EMERGENCY BORATION 04/30/02  3 of 14    3. Align Charging pump suction to at least ONE of the following sources:
A. Gravity Feed:
: 1) Open at least ONE BAM Tank Gravity Feed valve:
* 2CV-4920-1
* 2CV-4921-1  B. Boric Acid Makeup:
: 1) Start at least ONE BAM pump.
: 2) Open Emergency Borate From BAM Pumps valve (2CV
-4916-2). 3) Verify Boric Acid Makeup Flow Control va lve (2CV-4926) closed.
C. RWT to Charging pumps:
: 1) Open Charging Pump Suction Source From RWT valve (2CV-4950-2). 4. Close VCT Outlet valve (2CV
-4873-1). 4. IF VCT Outlet valve does NOT close,  THEN perform the following:
A. Start at least ONE BA M pump. B. Open Emergency Borate From BAM Pumps valve (2CV
-4916-2). C. Verify Boric Acid Makeup Flow Control valve (2CV
-4926) closed.
: 5. Check Reactor Makeup Water Flow Control valve (2CV
-4927) closed.
: 5. IF 2CV-4927 NOT closed,  THEN close VCT Make Up Isolation valve (2CV-4941-2).
INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE  2203.032  EMERGENCY BORATION 04/30/02  4 of 14    6. Check Charging Header Flow indicator (2FIS-4863) greater than 40 gpm. 6. GO TO Step
: 2. 7. GO TO Step 15.
: 8. Check RCS pressure less than 1265 psia. 8. IF RCS pressure greater than 1265 psia, THEN reduce RCS pressure as follows:
A. Reset Low PZR Press Setpoints during pressure reduction.
B. Commence RCS pressure reduction to less than 1265 psia as follows:
: 1) IF RCPs running,  THEN use Normal PZR spray.
: 2) IF ALL RCPs stopped,  THEN open PZR High Poin t Vent To Quench Tank valves:
* 2SV-4636-1
* 2SV-4636-2
* 2SV-4669-1  C. Place ALL PZR Heaters in OFF.
D. Maintain RCS MTS greater than 30&deg;F.
: 9. Align ONE HPSI Train as follows:
A. Verify RWT level greater than 7.5%.
B. Verify associated RWT Outlet valve open:
* 2CV-5630-1
* 2CV-5631-2  C. Start HPSI pump on recirc, refer to 2104.039, HPSI System Operation.
 
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 2 of 21  CHANGE: 035-04-0  1.0 PURPOSE  To provide a methodology for the calculation of critical configuration estimation and shutdown margin.
 
===2.0 SCOPE===
Procedure includes calculation methodology for determining critical Boron concentration, critical CEA position, shutdown margin (Modes 1, 2, 3, 4, 5 and 6), and Boron concentration required to maintain shutdown margin (Modes 3, 4, 5 and 6). The cycle specific data, curves and tables, needed to perform the calculations at any specified time during the cycle have been relocated to a Cycle specific Engineering Report (Plant Data Book).
Procedure satisfies Unit 2 Technical Specification surveillances 4.1.1.1.1.a, b, d & e and 4.1.1.2.a & b and ensures compliance with Limiting Condition for Operation 3.9.1.
 
==3.0 DESCRIPTION==
 
This procedure contains instructions and worksheets to perform reactivity balance calculations. Using the worksheets and cycle specific data provide d in the current cycle's Plant Data Book, operators can calculate estimated critical configurations, shutdown margin, and needed Boron additions and
 
subtractions at power and during cool downs and heatups. Additional
 
information to assist the operators dur ing operation in Mode 1 is included.
 
==4.0 REFERENCES==
 
===4.1 References===
Used In Procedure Preparation
* ANO-2 Tech Specs 3.1.1.1, 3.1.1.2, 3.1.3.6 and 3.9.1
* Plant Heat up (2102.002)
* Power Operation (2102.004)
* Plant Cool down (2102.010)
* Reactor Startup (2102.01
: 6)
* Soluble Poison Concentration Control (2103.004)
* CEDM Control System Operation (2105.009)
* Reactivity Anomaly Check Surveillance (2302.002)
* RHOBAL Updates for the Current Cycle of ANO
-2
* ANO-2 Physics Data Book for the Current Cycle
* Core Operating Limits R eport for the Current Cycle
* Reload Analysis Report for the Current Cycle
* CR-2-88-0355 items 3 and 5, Conservatism in SDM Calculations
 
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 3 of 21  CHANGE: 035-04-0  4.2 References Used In Conjunction With This Procedure
* RHOBAL Updates for the Current Cycle of ANO
-2
* ANO-2 Physics Da ta Book for the Current Cycle
* 1000.104, Condition Reporting and Corrective Actions
* 2102.002, Plant Heat up
* 2102.016, Reactor Startup
* 2302.002, Reactivity Anomaly Check Surveillance
* 2103.004, Soluble Poison Concentration Control
* ANO-2 Plant Data Book for th e Current Cycle 4.3 NRC Commitments
* Step 5.7 and the projected block that can be checked on the worksheets of this procedure satisfy a commitment stated in
 
0CANO78012, Response to Inspection Report 80
-10, Shutdown Margin Worksheet require specific notifi cation to signify projected value, dated 7 80 (Commitment P11265).
 
===5.0 LIMITS===
AND PRECAUTIONS 5.1 CEA worth figures A5A, A5B, A5C, B3, and Tables A5 and B3 of the Plant Data Book assume Groups and Banks other than those specified
 
are fully withdrawn.
Positions and associated worths for Groups 5 (figure/table A5), 6 and P are specified on the figures and tables.
5.2 The CEA group positions shall be maintained above the transient insertion limits of Technical Specification 3.1.3.6 during operation
 
in mo des 1 and 2. This ensures the shutdown margin required by Technical Specification 3.1.1.1 is maintained.
If the above requirement is not met, initiate and continue boration at >40 gpm of 2500 ppm boric acid solution or equivalent until the required shutdo wn margin is restored.
5.3 In modes 1, 2, 3, 4, and 5, a shutdown margin of
-5.5%D k/k (-6.0%D k/k when <60 EFPD) or more negative shall be maintained at all times. If a calculation indicates that the appropriate margin is not in effect, measures should be initiated immediately to restore the margin by boration. These shutdown margin requirements include a 0.5%
D k/k margin to allow for error in the curves and operating data enclosed in this procedure. An additional 0.5%
D k/k conservatism is added to the shutd own margin requirements above until after startup tests have shown good agreement with predictions. This extra conservatism may be removed following completion of startup physics tests for a cycle.
 
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 4 of 21  CHANGE: 035-04-0  5.4 While shutdown (in modes 3, 4, and 5) CEA Shutdown G roups A and B should be fully withdrawn at all times if possible. If it is not possible to have Shutdown Groups A and B withdrawn, at least one
 
boron dilution monitor and alarm should be operable. (Reference Cycle
 
11 Reload Analysis Report, Section 7.1.1.1
)  5.5 While at refueling shutdown (<l40
&deg;F with the vessel head unbolted or removed), the boron concentration shall be maintained at all times to ensure that Keff
<0.95. To accomplish this, and account for uncertainty, Keff is required to be
<0.941 when <6 0 EFPD or Keff
<0.945 when
>60 EFPD. Also verify that the RCS (and refueling canal boron) concentration is greater than or equal to 2500 ppm. The more restrictive of these conditions must be met and is referred to as the
 
refueling boron concentration in Wo rksheets 5 and 6. If the more restrictive of the above conditions is not in effect (i.e. the refueling boron concentration), measures shall be initiated
 
immediately to restore the boron concentration to the required value.
5.6 Use the conservative data suppli ed in Table B4 (CEA worth less the worth of the worst stuck rod pair) for an inoperable CEA. For the purposes of shutdown margin calculations a CEA is considered
 
inoperable only when it is untrippable and not fully inserted.
5.7 If shutdown margin workshe ets are employed to project shutdown margin for other modes (such as during heat ups or cool downs), the "PROJECTED" block should be checked at the top of the worksheet to
 
preclude confusing such projected values with actual values.
 
Typically Worksheet 5 i s to be used for such projected shutdown margin. (Commitment P11265) 5.8 A computer program, RHOBAL, exists to perform the calculations of all Worksheets in this procedure. Contact Reactor Engineering if
 
assistance is needed in performing these worksheets. 5.9 Figures C1 through C5 of the Plant Data Book include additional boron to account for Sm buildup to the equilibrium Sm value at the
 
beginning of a cycle.
5.10 When using Worksheets 4, 5, 6 and 8, and a CEA has been declared inoperable per TS, it is onl y necessary to assume that it is inoperable under the scope of these worksheets if it is untrippable and not fully inserted
. 6.0 SETPOINTS  None PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 5 of 21  CHANGE: 035-04-0  7.0 INSTRUCTIONS
 
===7.1 General===
7.1.1 The equation used for calculating a reactivity balance is:
r (net) = r (fuel) + r (boron) +
r (CEAs) +
r (temp) + r (power) + r (xenon) +
r (Net Sm)  where it is understood that the values for r above are added algebraically (i.e. poisons are negative values).
7.1.2 When r (samarium) is called for in this procedure, the net samari um worth as defined by RHOBAL is the samarium worth which should be used.
7.1.3 The xenon reactivity worth is obtained from the RHOBAL computer program, which is accessible on the personal
 
computers in the control room.
7.1.4 The samarium reactivity worth can be obtained from the RHOBAL computer program, which is accessible on the personal computers in the control room.
7.1.5 When running a Rhobal power history, power must be stable for a minimum of 72 hrs and burn up must be >30 EFPD prior
 
to using the Equili brium Concentrations initialization option. Otherwise, for > 30 EFPD, the power history must begin from the last time equilibrium conditions existed and
 
the transient must be modeled in the program. For < 30
 
EFPD, the BOC conditions initialization option m ust be used and the entire power history from BOC must be modeled. As an alternative, the input concentrations option may be used
 
and the concentrations from a previous power history
 
starting from the above conditions would be the input.
 
====7.1.6 Shutdown====
m argin is the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all control element
 
assemblies are fully inserted except for the single
 
assembly of highest reactivity worth whi ch is assumed to be fully withdrawn.
7.1.7 Keff is defined as 100/(100
-r) where r is a negative reactivity value when shutdown, in units of %
D k/k. 7.1.8 When using values from figures or tables, either interpolate values between curves or data points, ca lculate the values if equations are provided, or use RHOBAL to determine the values.
 
====7.1.9 Where====
worksheets call for a value from a figure, the table used to calculate the figure can be used to provide a more
 
accurate value.
 
PROC./WORK PLAN NO.
2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 6 of 21  CHANGE: 035-04-0    7.1.10 Select the appropriate works heet from Step 7.2 or obtain the equivalent output from RHOBAL. Follow the instructions as given on the worksheet. Contact Reactor Engineering for
 
assistance with reactivity problems which the Operations
 
staff cannot expeditiously resolve.
 
A NO-2-JPM-NRC-ELECXT    PAGE 1 OF 6  JOB PERFORMANCE MEASURE
 
UNIT: 2  REV #: 000  DATE:    SYSTEM/DUTY AREA:
A. C. Electrical Distribution TASK:  Perform Synchronized Cross Connect of 480 VAC load
-centers 2B1 and 2B2 JTA#:  ANO2-RO-480VAC-NORM-15  KA VALUE  RO:  3.3  SRO:  3.1  KA
 
==REFERENCE:==
 
062 A4.01  A PPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    AC TUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:  PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE (S):
OP 2107.001 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PER FORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS J PM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
A NO-2-JPM-NRC-ELECXT    PAGE 2 OF 6  JOB PERFORMANCE MEASURE
 
ANO-2-JPM-RO-ELECXT  PAGE 3 OF  6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Wal kthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized.
TASK STANDARD:
Cross connect 480VAC non
-vital busses 2B1 and 2B2 with 2B1 suppl ying and 2B2 feeder breaker open. Maintain 2B1 amperage less than 130 amps.
TASK PERFORMANCE AIDS:
OP 2107.001 Section 12.0.
SIMULATOR SETUP:
Any power level or mode.
All Non-Vital 4160VAC and 480VAC Busses energized.
Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).
 
ANO-2-JPM-RO-ELECXT  PAGE 4 OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 feeder breaker from 2A2 using OP
 
2107.001 section 12.0."  CRITICAL ELEMENTS (C):
2, 3, 4, 6, 8
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)
Examiner's note:
If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.
: 1. Check that Operations Manager approval obtained.
EXAMINER'S CUE:
"The Operations Manager has given pe rmission to perform Cross Connect of 2B1 and 2B2."  Ask if Operations Manager has given approval to cross connect
 
2B1 and 2B2 at power.
N/A  SAT  UNSAT Examiner's note:
The following two steps may be completed after cross
-connecting the busses. The reso lution on the meters is low at the low end.
(C) 2. Determine combined load of 2B1 an 2B2.
On Panel 2C10, summed the current reading of 2B1 and 2B2.
Observed that the summed load
 
is greater than 130 amps.
N/A  SAT  UNSAT
 
ANO-2-JPM-RO-ELECXT  PAGE 5 OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 3. Reduce loads on 2B1 an d 2B2 so that combined loading is less than 130 amps when cross
 
connected.
EXAMINERS CUE:
"AO has been directed to secure non
-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than
 
130 amps."
EXAMINERS NOTE:
Direct operator in simulat or instructor's station to reduce loading on 2B1 and 2B2 so
 
that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1
 
and 480CURR2B2).
Direct the AO or inform CRS of need to reduce non
-essential loads on 2B1 and 2B2 so that combined loading i s less than 130 amps.
N/A  SAT  UNSAT (C) 4. Synchroscope switch inserted in 2B1/2B2 cross
-tie slot and placed in ON.
On Panel 2C10, Placed Synchroscope switch into
 
2B1/2B2 cross
-tie slot and rotated clockwise to the ON position. N/A  SAT  UNSAT
: 5. Observed that the Synchroscope is at the 12
 
o'clock position.
On Panel 2C10, Observed that the Synchroscope is at the 12
 
o'clock position with the
 
Synchroscope switch in the ON
 
position. N/A  SAT  UNSAT (C) 6. Close the 2B1/2B2 Cross Tie breaker. O n panel 2C10, rotate the Cross Tie handswitch for 2B1/2B2 clockwise.
Observed that the Green light
 
turns OFF and the Red light turns
 
ON above the Cross Tie
 
handswitch.
N/A  SAT  UNSAT
: 7. Verify that the amperage indicated on 2B1 is less than
 
130 amp s. On panel 2C10, observe that the current is less than 130 amps on
 
2B1. N/A  SAT  UNSAT
 
ANO-2-JPM-RO-ELECXT  PAGE 6 OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 8. Open normal supply breaker on 2B2. AND  Open Transformer feeder
 
breaker from 2A2 to 2B2.
On Panel 2C10, rotate the normal feeder supply breaker on 2B2
 
cou nter clockwise to the open position. Observed that the RED light went OFF and the GREEN light went
 
ON. On Panel 2C10, rotate the
 
transformer feeder breaker on
 
2A2 to 2B2 counter clockwise to
 
the open position.
Observed that the RED light went OFF and th e GREEN light went ON. N/A  SAT  UNSAT
: 9. Turn sync switch to OFF.
On Panel 2C10, turn sync switch counter clockwise to the OFF
 
position. N/A  SAT  UNSAT
: 9. Notified AO to monitor 2B1 transformer during cross
 
connected operation and
 
maintain temp erature less than 220&deg;C. EXAMINER'S CUE
: "AO has been notified to monitor 2B1 transformer and
 
notify the control room if
 
temperature exceeds 220&deg;C
 
during cross connected
 
operations."
Notify AO to monitor 2B1 transformer during cross
 
connected operation a nd maintain temperature less than 220&deg;C. N/A  SAT  UNSAT END ANO-2-JPM-RO-ELECXT  PAGE 7 OF  6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Non-Vital 4160VAC busses are energized. 2B1 and 2B2 are energized.
INITIATING CUE:
The SM/CRS directs, "Cross Connect 2B1 and 2B2 and ope n 2B2 feeder breaker from 2A2 using OP 2107.001 section 12.0."
PROC./WORK PLAN NO.
PROCEDURE/WORK PLAN TITLE:
PAGE: 23 of 169 2107.001 ELECTRICAL SYS TEM OPERATIONS CHANGE:    12. CROSS CONNECTING 480V NON
-ESF BUSES CAUTION
* Time dependent over current relays exist on all 480V Load Center feeder breakers. They are set at 1600 amps (equates to 185 amps on 4160V AC side). Bus load should not exceed 173 amps (including 7% tolerance).
* Transformer continuous amperage rating at 4160V is 139 amps. Continuous operation >
139 amps will eventually degrade transformer. 
(130 amp limit based on 7% instrument error) 12.1. IF in Modes 1 OR 2, AND cross connecting for non
-emergency conditions,  THEN obtain Operations Manager concurrence.
12.2. IF BOTH buses energized,  AND combined load >
130 amps,  THEN adjust load as necessary to achieve <
130 amps combined load.
12.3. IF cross connecting to energize a de-energized bus,  THEN strip all loads from de
-energized Load Center.
12.4. Place Synchroscope switch for appropriate Cross Tie breaker to ON.
12.5. IF cross connecting energized buses,  THEN check synchroscope at 12 o'clock position.
12.6. Close selected Cross Tie break er. 12.7. IF desired to separate 480V bus from 4160V AC bus,  THEN open the following breakers:
12.7.1. Normal Supply breaker on 480V bus.
12.7.2. Transformer Feeder breaker on 2A1 OR 2A2.
12.8. Verify < 130 amps on supplying transformer.
12.9. Turn Sync switch to OFF.
12.10. IF EITHER Load cente r has been stripped,  THEN energize loads as directed by S/M.
12.11. Monitor supplying transformer to ensure temperature remains <
220&deg;C while buses are cross
-connected.
12.12. Maintain <
130 amps on supplying transformer while buses are cross-connected.
 
ANO-2-JPM-NRC-SIT01    PAGE 1 OF 6  JOB PERFORMANCE MEASURE UNIT: 2  REV #: 001  DATE:    SYSTEM/DUTY AREA:
Safety Injection System TASK:  Perform a high pressure fill of a SIT (SIT "A")  (Alternate Success Path)
JTA#:  ANO2-RO-ECCS-NORM-2 (Perform filling SIT's (RCS pressure >1500psia))
KA VALUE  RO:  3.3  SRO:  3.7  KA
 
==REFERENCE:==
 
006 A2.03  APPROVED FOR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:  PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
10 Minutes REFERENCE (S):
OP 2104.001 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS
 
JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  Total Time SIGN ED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A
 
QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-RO-SIT01  PAGE 2 OF  6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall r eview the "Briefing Checklist
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
HPSI Pump (2P89A) is running on minimum recirculation and "A" SIT (2T2A) header from "A"  train has been flus hed    TASK STANDARD:
Safety Injection Tank (2T2A) level has been raised ~ 0.3% and fill is secured.
This is an ALTERNATE SUCCESS PATH JPM.
TASK PERFORMANCE AIDS:
OP 2104.001 Section 8.0.
SIMULATOR SETUP:
Setup override to de
-energize the red and green lights for 2CV
-5015-1 when the handswitch is taken to the open position and have the valve open 1%. Safety Injection Tank (2T2A) pressure is <608 psig. Safety Injection Tank (2T2A) level ~ 82.5%.
HPSI Pump (2P89A) is running on minimu m recirculation.
RCS Pressure is > 1500 psia.
Run CASE file JPM04. It will do the following:
Set T4=sitfill (triggered when 2HS5015
-1 red light energized).
T4 Set 2CV5015_a = 0.1 T4 Set 2HS
-5015-1_G = FALSE (green light off)
T4 Set 2HS
-5015-2_R = FALSE (red light off)
 
ANO-2-JPM-RO-SIT01  PAGE 3 OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with
 
step 8.3."  CRITICAL ELEMENTS (C):
1, 2, 4, 5, 6                                                         
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 1. Open SIT (2T2A) Drain Valve (2SV-5001-1). POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C17, placed handswitch for 2SV
-5001-1 to OPEN. Observed red light ON above
 
handswitch.
N/A  SAT  UNSAT (C) 2. Open SIT (2T2A) Check Valve Bypass (2SV-5004). POSITIVE CUE:
Red light ON.
NEGATIVE CUE:
Green light ON.
On Panel 2C33, placed handswitch for 2SV
-5004 to OPEN. Observed red light ON above
 
handswitch.
N/A  SAT  UNSAT
: 3. Monitor SIT level and pressure during fill.
While filling SIT A , monitored level to ensure level maintained
< 87.9%. While filling SIT A, monitored SIT
 
pressure closely to ensure
 
pressure maintained < 624 psig.
N/A  SAT  UNSAT
 
ANO-2-JPM-RO-SIT01  PAGE 4 OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 4. Throttle open HPSI Header 1 Injection to RCP A Discharge
 
(2CV-5015-1). POSITIVE CUE: Both lights ON.
NEGATIVE CUE:
Only green light ON.
On Panel 2C17, throttled 2CV-5015-1 OPEN by placing handswitch to OPEN momentarily as required to establish an SIT fill
 
rate. Observed red and green lights
 
ON above handswitch.
Observed SIT (2T2A) control board level instrument(s):
2LIS-5008 (2C17) 2LI-5010  (2C17) 2LIS-5009 (2C16)
OR  Observed SIT (2T2A) level on
 
PMS, or SPDS computer
 
point/trend display.
N/A  SAT  UNSAT (C) 5. Attempts to close HPSI Header 1 Injection to RCP A Discha rge valve prior to exceeding 87.9%.
NEGATIVE CUE:
Red light ON.
On Panel 2C17, placed handswitch for 2CV
-5015-1 to CLOSE. Recognized that 2CV
-5015-1 would NOT close and both red and green lights are
 
deenergized.
N/A  SAT  UNSAT
 
ANO-2-JPM-RO-SIT01  PAGE 5 OF  6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 6. Stop the level i ncrease in 2T2A SIT. POSITIVE CUE:
2P-89A is secured OR Closed SIT A Drain Valve (2SV-5001-1). POSITIVE CUE:
2SV-5001-1 green light is ON red light is OFF.
OR Closed SIT A Check Valve Bypass (2SV
-5004). POSITIVE CUE:
2SV-5004 green light is ON red lig ht is OFF.
On panel 2C17, placed handswitch for A HPSI Pump
 
(2P-89A) in stop Observed 2P89A stopped.
OR On Panel 2C17 placed handswitch for SIT A Drain Valve
 
(2SV-5001-1) to CLOSED.
Observed green light ON above
 
handswitch.
OR On Panel 2C33, placed han dswitch for SIT A Check Valve Bypass (2SV
-5004) to CLOSED. Observed green light ON above
 
handswitch.
N/A  SAT  UNSAT
: 7. Inform CRS of failure of 2CV-5015-1 to close.
POSITIVE CUE:
Acknowledge communication as CRS. Direct Examinee to
 
secure from fill ing A SIT.
Informed CRS that 2CV
-5015-1 failed to close.
N/A  SAT  UNSAT
: 8. Close SIT (2T2A) Drain Valve.
(if not closed previously.)
POSITIVE CUE:
Green light ON.
On Panel 2C17, placed handswitch for SIT A Drain Valve
 
(2SV-5001-1) to CLOSE.
Observe d green light ON above handswitch.
N/A  SAT  UNSAT
: 9. Close SIT (2T2A) Check Valve Bypass. (if not closed previously.)
POSITIVE CUE:
Green light ON.
On Panel 2C33, placed handswitch for SIT A Check
 
Valve Bypass (2SV
-5004) to CLOSE. Observed green lig ht ON above handswitch.
N/A  SAT  UNSAT END ANO-2-JPM-RO-SIT01  PAGE 6 OF  6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
HPSI pump (2P89A) is running on minimum recirculation and "A" SIT (2T2A) header from "A" train has been flushed.
 
INITIATING CUE:
The SM/CRS directs, "Rai se Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3
."
PROC./WORK PLAN NO.
2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 12 of 89 CHANGE:      8.0 FILLING SITS (RCS PRESSURE
&#xb3; 1500 PSIA 8.1 IF leakage is indicated past associated 2SI
-15 check valve THEN GO TO Injection Header Flush and SIT Fill, Attachmen t C of this procedure to fill SIT(s).
 
===8.2 Place===
HPSI pump (2P
-89A/B/C) in service on minimum recirculation mode using applicable section of HPSI System Operation (2104.039).
NOTE
* Steps marked with an
* are continuous action steps.
* SIT pressure will rap idly drop 2
-5 psi when opening drain valve if SIT drain header has been depressurized.
  *8.3 WHEN closing HPSI valves, THEN maintain handswitch in close position for ~
2 seconds after red light out.
  *8.4 Closely monitor SIT parameters as SIT pressure will rise rapidly during fill operations.
8.5 IF filling A SIT, THEN perform the following:
 
====8.5.1 Verify====
open:
* SIT A Drain valve (2SV
-5001-1)
* SIT A Check Valve Bypass (2SV
-5004)  8.5.2 Throttle open selected HPSI Pump Injection MOV:
* HPSI Header 1 Injection to RCP A Discharge (2CV-5015-1)
* HPSI Header 2 Injection to RCP A Discharge (2CV-5016-2)  8.5.3 WHEN desired level reached, THEN close the following:
A. HPSI valve opened in previous step B. 2SV-5001-1  C. 2SV-5004 PROC./WORK PLAN NO.
2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 13 of 89 CHANGE:      8.6 IF f illing B SIT, THEN perform the following:
 
====8.6.1 Verify====
open:
* SIT B Drain valve (2SV
-5021-1)
* SIT B Check Valve Bypass (2SV
-5024)  8.6.2 Throttle open selected HPSI Pump Injection MOV:
* HPSI Header 1 Injection to RCP B Discharge (2CV-5035-1)
* HP SI Header 2 Injection to RCP B Discharge (2CV-5036-2)  8.6.3 WHEN desired level reached, THEN close the following:
A. HPSI valve opened in previous step B. 2SV-5021-1  C. 2SV-5024  8.7 IF filling C SIT, THEN perform the following:
8.7.1 Ve rify open:
* SIT C Drain valve (2SV
-5041-2)
* SIT C Check Valve Bypass (2SV
-5044)  8.7.2 Throttle open selected HPSI Pump Injection MOV:
* HPSI Header 1 Injection to RCP C Discharge (2CV-5055-1)
* HPSI Header 2 Injection to RCP C Discharge (2CV-5056-2)  8.7.3 WHEN desired level reached, THEN close the following:
A. HPSI valve opened in previous step B. 2SV-5041-2  C. 2SV-5044 PROC./WORK PLAN NO.
2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 14 of 89 CHANGE:      8.8 IF filling D SIT, THEN perform the following:
 
====8.8.1 Verify====
open:
* SIT D Drain valve (2SV
-5061-2)
* SIT D Chec k Valve Bypass (2SV
-5064)  8.8.2 Throttle open selected HPSI Pump Injection MOV:
* HPSI Header 1 Injection to RCP D Discharge (2CV-5075-1)
* HPSI Header 2 Injection to RCP D Discharge (2CV-5076-2)  8.8.3 WHEN desired level reached, THEN close the foll owing:  A. HPSI valve opened in previous step B. 2SV-5061-2  C. 2SV-5064  8.9 WHEN all SIT filling operations are complete, THEN secure HPSI pump using HPSI System Operation (2104.039).
 
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2    REV #: 6    DATE:  14 July 2003 SYSTEM/DUTY AREA:
Abnormal/Emergency Operations TASK: Secure Containment Spray (during recovery actions for SIAS)
JTA#: 2 0265140101 KA VALUE    RO:
3.2      SRO:
3.7    KA
 
==REFERENCE:==
 
026 020 A2.03 APPROVED FOR ADMINISTRATION TO:
RO: X  SRO: X  TASK LOCATION:
INSIDE CR:
X  OUTSIDE CR:
BOTH:  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  LAB:  POSITION EVALUATED:
RO:  SRO:  ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:    TESTING METHOD:
SIMULATE:
PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
15 minutes REFERENCE (S):
E OP 2202.003 EXAMINEE'S NAME:
SSN:
  -  -  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE
 
PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRE NT WITH THAT REVISION.
 
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Walkthrough" portion of OP 1064.023  with the examinee.
JPM INITIAL TASK CONDITIONS:
Post LOCA conditions exist. CSS termination criteria are satisfied.
EOP 2202.003 is completed through step 18.A.
TASK STANDARD:
CSAS is reset and CSAS actuated components are secured
.   
 
TASK PERFORMANCE AIDS:
EOP 2202.003 Section 1
- ENTRY Step 18
 
SIMULATOR SETUP:
SIAS with containment spray actuated. Containment Temperature. < 140 &deg; F, Pressure < 22.5 psia, AND ALL CNTMT cooling fans running in emergency mode.
 
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Reset CSAS and secure Containment Spray beginning with OP 2202.003 Section 1
- ENTRY step 18.B."  CRITICAL ELEMENTS (C):
1, 2, 3  PERFORMANCE CHE CKLIST STANDARDS (Circle One)
EXAMINERS NOTE:
The following step may be simulated for each of the other three trip paths.
  (C) 1. Reset CSAS.
POSITIVE CUE:
All trip paths reset.
Pretrip/trip indicators are reset.
NEGATIVE CUE:
One/all trip paths NOT re set. On panel 2C23B, obtained key and placed it in trip path to be reset.
Placed trip path to UNLK.
Depressed CSAS pushbutton for trip path.
Depressed CSAS lockout reset pushbutton.
Reset pretrip/trip indicators after all CSAS trip paths are reset.
O R  On PPS inserts, reset pretrip/trip indicators after all CSAS trip paths are reset.
 
N/A  SAT  UNSAT (C) 2. Stop Containment Spray Pumps.
POSITIVE CUE:
Green lights ON.
NEGATIVE CUE:
Red light(s) ON.
On panels 2C16/17, Placed handswitches for C ontainment Spray Pumps (2P35A and 2P35B) in STOP. Observed green lights ON above handswitches.
 
N/A  SAT  UNSAT (C) 3. Close Containment Spray Header Isolation Valves.
POSITIVE CUE:
Green lights ON.
NEGATIVE CUE:
Red light(s) ON.
On panels 2C16/17, placed handswitches for Containment Spray Header Isolation valves (2CV-5612-1 and 2CV-5613-2) in CLOSE. Observed green lights ON above
 
handswitches.
 
N/A  SAT  UNSAT END JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 4 OF 8 JOB PERFORMANC E MEASURE  QUESTION 1:
 
==Reference:==
026 000 K1.01 4.2/4.2 The "B" LPSI pump is running supplying shutdown cooling. Cntmt Spray Header Iso Valve (2CV
-5612-1) is OPEN for testing. The CRS directs shifting shutdown cooling to the "A" LPSI pump through the "B" shutdown cooling heat exchanger. How will containment spray system components respond?
ANSWER:
 
==Reference:==
OP 2104.005 Rev. 33 PC
-3  With no CSAS actuation, 2CV
-5612-1 will close.
COMMENTS:
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 5 OF 8 JOB PERFORMANCE MEASURE QUESTION 2:
 
==Reference:==
026 000 K4.02 3.1/3.6 While performing the 2P136A monthly test, the operator fails to close 2BS
-11A. What affect will this have on completion of the monthly test?
ANSWER:
 
==Reference:==
OP 2104.005 Rev. 33 PC
-3  NaOH Tank Outlet Valve (2CV
-5657-1) will not open (from the control room) due to valve interlocks unless 2BS
-11A is closed.
 
COMMENTS:
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 6 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY QUESTION 1:
The "B" LPSI pump is running supplying shutdown cooling. Cntmt Spray Header Iso Valve (2CV
-5612-1) is OPEN for testing. The CRS directs shifting shutdown cooling to the "A" LPSI pump through the "B" shutdown cooling heat exchanger. How will containment s pray system components respond?
 
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY QUESTION 2:
While performing the 2P136A monthly test, the operator fails to close 2BS
-11A. What affect will this have on completion of the monthly test?
 
JPM- ANO-2-JPM-RO-EOP01 (AA62002J
-008-A0006)    PAGE 8 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:
Post LOCA conditions exist. CSS termination criteria are satisfied. EOP 2202.003 is
 
completed through s tep 18.A.
INITIATING CUE:
The SS/CRS directs, "Reset CSAS and secure Containment Spray beginning with OP
 
2202.003 Section 1
- ENTRY step 18.B."
JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 1 OF 5  JOB PERFORMANCE MEASURE SYSTEM/DUTY AREA:
Abnormal/Emergency Operations TASK:  Restore SDC Flow following an instrument failure
- inadvertent Auto
-Closure Initiation (ACI)     
 
JTA#:  Respond to Loss of SDC, ANO2 RO EOPAOP OFF NORM  20355190401                                     
 
KA VALUE      RO:
3.5 SRO:
3.7 KA
 
==REFERENCE:==
 
005 A2.02  APPROVED FOR ADMINISTRATION TO:  RO:
X SRO:
X TASK LOCATION:  INSIDE CR:
X OUTSIDE CR:
 
BOTH:
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE: 
 
SIMULATOR:
Perform LAB:__________ 
 
POSITION EVALUATED:      RO: __________      SRO: ___________
 
ACTUAL TESTING ENVIRONM ENT:  SIMULATOR:
 
PLANT SITE:
 
LAB: ______
 
TESTING METHOD:  SIMULATE: 
 
PERFORM: ____________
APPROXIMATE COMPLETION TIME IN MINUTES:
15 minutes                                         
 
REFERENCE (S):
EOP 2203.029                                                           
 
EXAMINEE'S NAME:
 
SSN: _________________
 
EVALUATOR'S NAME: _
_____________________________________ DATE _________________               
 
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETER MINED TO BE:
SATISFACTORY: 
 
UNSATISFACTORY: _____________
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time
 
Stop Time
 
Total Time SIGNED__________________________________
DATE: _____________________
SIGNATURE INDICATES THIS JPM HAS B EEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 2 OF 5  JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Walkthrough" po rtion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
AOP 2203.029 has been entered due to 2PI
-4623-2 failing "High". SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, completed up t o step 13.C TASK STANDARD:
SDC restored per Loss of SDC AOP, 2203.029.       
 
TASK PERFORMANCE AIDS:
Loss of SDC AOP, 2203.029
 
SIMULATOR SETUP
:  Mode 5, SDC aligned for the "A" LPSI Pump through the "A" SDC Heat Exchanger.
2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV
-5086-2 is CLOSED.
ACI actuation clear due to de
-energizing 2PS
-4623-2 by fuse removal.
 
JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 3 OF 5  JOB PERFORMANCE MEASURE INITIATING CUE:
Th e SM/CRS directs, "The fuse has been removed for 2PI
-4623-2, Restore Shutdown Cooling Flow I.A.W. AOP 2203.029 beginning with step 13.C."  CRITICAL ELEMENTS (C):                2, 5, 6, 8, 9
 
PERFORMANCE CHECKLIST STANDARDS  (Circle One)
: 1. Verify SDC RCS isola tion valves open.
POSITIVE CUE:
Red lights ON; green lights OFF.
On panels 2C16 and 2C17, checked indications for:
  - 2CV-5038-1  - 2CV-5084-1  - 2CV-5086-2  Observed 2CV
-5086-2 closed by green light ON, red light OFF above
 
handswitch.
N/A  SAT  UNSA T (C) 2. Determine that 2CV
-5086-2 is shut due to the Auto
-Closure Initiation (ACI) and Open 2CV-5086-2. POSITIVE CUE:
Red light ON; green light OFF  On panel 2C16, placed handswitch for 2CV
-5086-2 to "OPEN". Observed red light ON
; green light OFF above handswitch.
N/A  SAT  UNSAT
: 4. Check SDC pump running.
On 2C17, determined That no SDC pumps are running.
Observed 2C
-16 and 2C-17 that 2P-60 A & B were secured. Observed green light ON; red
 
light OFF above handswitches.
N/A  SAT  UNSAT
 
JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 4 OF 5  JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS  (Circle One)
(C) 5. Close ALL LPSI Injection MOVs. POSITIVE CUE:
Green lights ON; red lights OFF. On 2C16 & 17, placed handswitches for Safety
 
Injection MOVs to "CLOSE".
2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red
 
li ght OFF above Handswitch for all valves.
N/A  SAT  UNSAT (C) 6. B. Open ONE LPSI Injection MOV 10%.
On 2C-16 or 17, throttled open 1 LPSI Injection MOV 10%.
2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Operated 1 LPSI Injection MOV Handswitch until po sition indicator shows ~ 10%.
Observed green and red light
 
ON and position indicator at
 
10% above handswitch.
N/A  SAT  UNSAT
: 7. Verify RCS level adequate; refer to Attachment A, RCS Level.
Referred to Attachment "A" and verified RCS Level
 
adequate for SDC Pump restart. N/A  SAT  UNSAT NOTE: If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C
-16 & 17 back to 2C
-04 multiple times to control flow. 2CV
-5091 should be monitored to ensure that it has control of flow when plac ed in automatic.
(C) 8. D. Start SDC pump; refer to 2104.004, Shutdown
 
Cooling System.
On 2C17 placed handswitch for 2P-60A to "START".
Observed red light ON; green
 
light OFF above handswitch.
N/A  SAT  UNSAT
 
JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 5 OF 5  JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS  (Circle One)
(C) 9. Raise SDC flow to greater than 24 00 gpm by opening LPSI Injection MOVs.
On 2C-16 & 17 placed hand
-switches for Safety Injection MOVs to "OPEN) as necessary
 
to achieve > 2400 gpm flow.
2FIC-5091 indicates > 2400 gpm. N/A  SAT  UNSAT
: 10. Control RCS cool down rate within TS limits; r efer to 2202.010, Standard Attachments, Attachment
 
8, RCS Cool down Table.
On 2C04 adjusted 2HIC
-5093, SDC Temperature Controller as necessary.
N/A  SAT  UNSAT END JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 6 OF 5  JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
Loss of Shutdown Cooling AOP, 22 03.029, has been entered due to 2PS-4623-2 failing "High". The resulting ACI caused 2CV
-5086-2 to close. The "A" SDC pump was secured and AOP completed up to step 13.C.
INITIATING CUE:
The SM/CRS directs, "The fuse has been removed for 2PI
-4623-2, Resto re Shutdown Cooling Flow I.A.W. AOP 2203.029 beginning with step 13.C."
JPM- ANO-2-JPM-RO-EFW      JOB PERFORMANCE MEASURE UNIT:  2  REV #:  7      DATE:  14 July 2003 SYSTEM/DUTY AREA:
Heat removal from core, EFW system TASK: Local/manual start of Turbine driven EFW pump JTA#: 20015130101 KA VALUE  RO: 3.5  SR O: 3.9  KA
 
==REFERENCE:==
001 A4.10 APPROVED FOR ADMINISTRATION TO: RO:
X  SRO: X  TASK LOCATION: INSIDE CR:
X  OUTSIDE CR:
BOTH:  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
SIMULATOR:
Perform  Perform LAB:
POSITION EV ALUATED:  RO:    SRO:  ACTUAL TESTING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD: SIMULATE:
PERFORM:  APPROXIMATE COMPLETION TIME IN MINUTES:
20 minutes REFERENCE (S):
Procedure 2106.006 EMERGENCY FEEDWATER SYSTEM OPERATIONS EXAMI NEE'S NAME:
SSN:               
-             
  -                .
EVALUATOR'S NAME:   
                                                                                                      .
 
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time:
Stop Time:
Total Time:
                    .
 
SIGNED__________________________________
DAT E: _____________________
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE
 
PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
JOB PERFORMANCE MEASURE Initial Conditions:
The plant has suffered a los s of all feed water. It is necessary to perform a local start of the EFW pump to restore feed water flow to the Steam generators.
JOB PERFORMANCE MEASURE INITIATING CUE:
The SS/CRS directs, "Perform a local manual startup of 2P
-7A EFW pump using Procedure 2106.006. Attachments A and C of Procedure 2106.006 have been completed"  CRITICAL ELEMENTS (C):
1e,1f, 5, 6, 10, 12
 
===7.1 Align===
system using Attachment A and Attachment C of this procedure.
PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 1. Verify 2P-7A al igned using Section 7.0 of this procedure Performs checks IAW section 7.0  (steps a through I)
: a. Verify Condensate Suction valve 2CV-0795-2 open Condensate Suction valve 2CV-0795-2 open N/A  SAT  UNSAT
: b. Verify EFW Discharge valve 2CV
-1037-1 open EFW Discharge valve 2CV
-1037-1 open N/A  SAT  UNSAT
: c. Verify Service Water Suction valve 2CV-0711-2 closed Service Water Suction valve 2CV-0711-2 closed N/A  SAT  UNSAT
: d. Verify EFW Discharge valve 2CV
-1026-2 closed EFW Discharge valve 2CV
-1026-2 clo sed N/A  SAT  UNSAT
: e. (C) Verify 2P-7A Speed controller (2HIC-0336-2) set at 100%.
2P-7A Speed controller (2HIC
-0336-2) set at 100%.
N/A  SAT  UNSAT
: f. (C) Verify EFW pump (2P
-7A AND 2P-7B) bearing oil levels within 1/4 inch of line on Oil Level indic ating plate.
EFW pump (2P
-7A AND 2P-7B) bearing oil levels within 1/4 inch of line on Oil Level
 
indicating plate.
N/A  SAT  UNSAT
: g. Check EFW pump Turbine (2K
-3) inboard bearing oil level between low and high marks on 2LI
-0315. EFW pump Turbine (2K
-3) i nboard bearing oil level between low and high marks on 2LI-0315. N/A  SAT  UNSAT
: h. Check 2P-7B motor oil
> 1/4 full in bulls-eye sight glass. (pump is operable with any oil in sightglass).
2P-7B motor oil
> 1/4 full in bulls-eye sight glass.
N/A  SAT UNSAT  i. IF oil is needed for 2K
-3 or 2P-7B motor, THEN submit MAI Examinee states that MAI is not needed.
N/A  SAT  UNSAT This completes the system alignment
: 2. Notify Chemistry to perform the following:
* Take required EFW samples. (CR-ANO-2-1999-0324)
* Sample Main Steam as needed to accommodate effluent release calculations. (CR
-ANO-2-1999-0324 Chemistry notified.
N/A SAT UNSAT
: 3. 3 IF plant power < 10%, AND use of SU/BD DI Cond Return Header as suction source
 
desired, AND FW Htr 2E7A Cond Inlet Temp (T0606) is
< 140&deg;F, THEN verify open EFW Suction (2EFW-0706). Checks plant power and contacts control to determine
 
if use of SU/BD DI Cond
 
Return Header as suction source desired.
Cue: Use of use of SU/BD DI
 
Cond Return Header as
 
suction source is not desired.
 
N/A SAT UNSAT
: 4. IF in Mode 1, 2 or 3, THEN enter Tech Spec 3.7.1.2.
N/A SAT UNSAT
: 5. (C) Close 2P-7A Trip Throttle valve.
2P-7A Trip Throttle valve closed N/A SAT UNSAT
: 6. (C) Open Steam Supply valve (2CV
-0340-2). Steam Supply valve (2CV
-0340-2) opened.
N/A SAT UNSAT
: 7. Record time 2CV
-0340-2 opened in Control Room log.
Time 2CV-0340-2 opened recorded in Control Room log N/A SAT UNSAT
: 8. Check Turbine Bearing Cooling Water Supply valve (2SV
-0317-2) opens Turbine Bearing Cool ing Water Supply valve (2SV
-0317-2) checked open.
N/A SAT UNSAT
: 9. Slowly open 2P
-7A Trip Throttle valve to obtain desired RPM or discharge pressure.
2P-7A Trip Throttle valve opened. Desired RPM or discharge pressure obtained.
N/A SAT UNSAT CAUTION 2P-7A will trip on over speed between 4420 and 4520 RPM.
Examiner: Venting of the control oil system is desired, examinee should perform the following:
: 10. (C)  Adjust 2P-7A Speed controller (2HIC-0336-2) to 50%.
2P-7A Speed controller (2HIC
-0336-2) adjus ted to 50%.
N/A SAT UNSAT
: 11. Throttle closed 2P
-7A Trip Throttle valve until governor valve is fully extended (full open) 2P-7A Trip Throttle valve throttled closed until governor valve is fully extended (full open)  N/A SAT UNSAT
: 12.  (C) Slowly open Trip Throttle valve until governor valve fully retracts Trip Throttle valve opened slowly until governor valve is
 
fully retracted N/A SAT UNSAT
: 13. Repeat above steps as desired to fully vent control oil system Repeat above as necessary until syste m properly vented.
N/A SAT UNSAT
: 14. WHEN venting operations are complete, THEN return 2HIC
-0336-2 to 100% while maintaining desired RPM or discharge pressure
 
using Trip Throttle valve.
2HIC-0336-2 returned to 100%
with desired RPM or discharge pressure maintained using Trip Throttle valve.
N/A SAT UNSAT
: 15. JPM completed
 
TS 3.7.1.2 EMERGENCY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 Two emergency feed water pumps and associated flow paths shall be OPERABLE with:
: a. One motor driven pump capable of being powered from an OPERABLE emergency bus, and
: b. One turbine driven pump capable of being powered from an OPERABLE steam supply system.
APPLICABILITY: MODES 1, 2, and 3 ACTION: With one emergency feed water pump inoperable, resto re the inoperable pump to OPERABLE status within 72 hours or be in HOT SHUTDOWN within the next 12 hours.
SURVEILLANCE REQUIREMENTS 4.7.1.2 Each emergency feed water pump shall be demonstrated OPERABLE:
: a. At least once per 31 days by:
: 1. Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
: b. In accordance with the Inservice Testing Program by:
: 1. Verifying the developed head of each EFW pump at the flow test point is greater than or equal to the required developed head.
This surveillance requirement is not required to be performed for the turbine driven EFW pump until 24 hours after exceeding 700 psia in the steam generators.
: c. At least once per 18 months by:
: 1. Verifying that each automatic valve in the flow path actuates to its correct position on MSIS or EFAS test signals.
: 2. Verifying that the motor driven pump starts automatically upon receipt of an EFAS test signal.
: 3. Verifying tha t the turbine driven pump steam supply MOV opens automatically upon receipt of an EFAS test signal.
: d. By verifying proper alignment of the required EFW flow paths by verifying flow from the condensate storage tank to each steam generator. This SR is requi red to be verified prior to entering MODE 2 whenever plant has been in MODES 4, 5, 6, or defueled for
> 30 days.
 
JPM- ANO-2-JPM-RO-RCP02  PAGE  1  OF  6 JOB PERFORMANCE MEASURE UNIT:          2 REV #:          4 DATE:                         
. SYSTEM/DUTY AREA:
Abnormal/Emergency Operations                                                                   
 
TASK:    Restore component cooling water to reactor coolant pumps  (Alternate Success Path)
 
JTA#:  20085180401                                                       
 
KA VALUE      RO:
3.3 SRO:
3.1 KA
 
==REFERENCE:==
 
008  A4.01     
 
APPROVED FO R ADMINISTRATION TO:  RO:
X SRO:
X       
 
TASK LOCATION:  INSIDE CR:
X OUTSIDE CR:
 
BOTH:                     
 
SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
 
PLANT SITE: 
 
SIMULATOR:
Perform LAB: 
 
.
POSITION EVALUATED:      RO:
 
SRO:
 
.
ACTUAL TESTING ENVIRONMENT:  SIMULATOR:
 
PLANT SITE:
 
LAB:           
.
TESTING METHOD:  SIMULATE: 
 
PERFORM:
 
.
APPROXIMATE COMPLETION TIME IN MINUTES:
15 minutes                                                 
 
REFERENCE(S):
EOP 2202.010                                                                                                             
 
EXAMINEE'S NAME:
 
SSN:            -         
-           
.
EVALUATOR'S NAME: 
 
.
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM
 
AND IS DETERMINED TO BE:
 
SATISFACTORY: 
 
UNSATISFACTORY: 
 
.
PERFORMANCE CHECKLIST COMMENTS:
 
 
 
Start Time
 
Stop Time Total Time
 
SIGNED__________________________________
DATE: _____________________
 
SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED
 
INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT R EVISION.
JPM- ANO-2-JPM-RO-RCP02  PAGE  2  OF  6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
2A1, 2A2, are re
-energized from SU#2 following a degraded power situation.
2202.010 ATT. 29 steps up to 1.n have been completed. Power to CCW pumps has been restored.       
 
TASK STANDARD:
Controlled bled off isolated to VCT and CBO relief valve isolated.
 
TASK PERFORMANCE AIDS:
EOP 2202.010 Attachment 21                                                     
 
SIMULATOR INITIAL CONDITIONS
: Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2
 
USAGE" perform actions through step 1.n. Close RCP CCW RETURN valve, 2CV
-5255-1, 2CV-5254-2 and 2CV-5236-1. NO SIAS actuation.
 
Run case file JPM07  This will do the following:                                                                                                   
 
Set T4 = ccwrcp (this will trigger T4 when 2CV 5255 red light is energi zed).                                                           
 
When 2CV 5255
-1 is taken to open position, it will trip the breaker                                                                         
 
T4=2HS-5255-1_R false (override)
 
T4=2HS-525 5-1_G false (override)
 
T4=2CV5255
-1_a = 0.0% (component malfunction)
 
JPM- ANO-2-JPM-RO-RCP02  PAGE  3  OF  6 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS directs, "Restore CCW to the RCP's using EOP 2202.010 Attachment 21."
CRITICAL ELEMENTS (C):
3,  4, 5 , 6,  7, 11, 12
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 1. Verify RCP bleedoff to VCT valves
 
open.
POSITIVE CUE:
For 2CV-4846-1 red light ON and For 2CV-4847-2 red light ON.
On panel 2C16 verified 2CV
-4847-2 red light on; control sw itch in OPEN.
On panel 2C17, verified 2CV
-4846-1 red light on; control switch in OPEN.
N/A  SAT  UNSAT
: 2. Verify RCP Bleedoff Relief Isolation to Quench Tank open.
 
POSITIVE CUE:
For 2CV-4856 red light ON On panel 2C09, verified 2CV
-4856 red light on; keyswitch in LOCKED OPEN. N/A  SAT  UNSAT (C) 3. Determine RCP Seal temperature
 
and status of Loop II CCW pump.
 
POSITIVE CUE:
RCP seal temperatures are > 180&deg;F
 
and one CCW pump is running on
 
Loop II. On panel 2C14 or on PMS computer, determined RCP seal temperatures.
 
On 2C14, observed running
 
indication for one Loop II CCW
 
pump and Loop II flow.
N/A  SAT  UNSAT (C) 4. Verify RCP CCW Return valve
 
(2CV-5255-1) CLOSED.
 
POSITIVE CUE:
Green light ON.
On panel 2C17, verified 2CV
-5255-1 closed.
Obser ved green light ON; red light OFF above handswitch.
N/A  SAT  UNSAT (C) 5. Open RCP CCW Supply valve
 
(2CV-5236-1).
POSITIVE CUE:
Red light ON.
 
On panel 2C17, placed handswitch
 
for 2CV-5236-1 in "OPEN".
 
Observed green light OFF; red light
 
ON. N/A  SAT  UNSAT (C) 6. Open RCP CCW Return valve
 
(2CV-5254-2).
POSITIVE CUE:
Red light ON.
On panel 2C16, placed handswitch
 
for 2CV-5254-2 in "OPEN".
 
Observed green light OFF; red light
 
ON. N/A  SAT  UNSAT
 
JPM- ANO-2-JPM-RO-RCP02  PAGE  4  OF  6 JOB PERFORMANCE MEASURE EXAMINER'S NOTE:
When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be stuck closed.
  (C) 7. Modulate RCP CCW Return valve (2CV-5255-1) OPEN.
POSITIVE CUES:
Red and green lights OFF.
 
If WCO sent to the valve; 2CV-5255-1 cannot be opened.
 
If AO sent to the breaker, 2B53
-G4; the breaker for 2CV
-5255-1 cannot be reset. On panel 2C17, took handswitch for
 
2CV-5255-1 to "OPEN" for one (1) second then released.
 
Observed red and green lights OFF.
EXAMINEE may ask to dispatch a NLO to the valve and or breaker.
N/A  SAT  UNSAT EXAMINER'S NOTE:
The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot be restored. This
 
monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV
-5255-1 did not open.
The examinee should go to step 4 of Attachment 21.
: 8. Verify ALL RCP's secured.
POSITIVE CUE:
Green light ON and Red light OFF
 
for 2P32 A, B, C, D.
On panel 2C04, observed 2P32A, B, C, and D RCP handswitches in
 
STOP or PTL.
Observed handswitch is green flagged; gr een light ON and red light OFF.
N/A  SAT  UNSAT
: 9. Close 2CV-5254-2.
POSITIVE CUE:
Green light ON.
On panel 2C16, placed handswitch
 
for 2CV-5254-2 to "CLOSE"
 
Observed green light ON; red light
 
OFF. N/A  SAT  UNSAT
: 10. Close 2CV-5236-1.
POSITI VE CUE: Green light ON.
On panel 2C17, placed handswitch
 
for 2CV-5236-1 to "CLOSE"
 
Observed green light ON; red light
 
OFF. N/A  SAT  UNSAT
 
JPM- ANO-2-JPM-RO-RCP02  PAGE  5  OF  6 JOB PERFORMANCE MEASURE (C) 11. Close RCP bleedoff to VCT valves.
POSITIVE CUE:
For 2CV-4846-1 green light ON and For 2CV-4847-2 gree n light ON.
On panel 2C17, placed handswitch
 
for 2CV-4846-1 to "CLOSE."
On panel 2C16, placed handswitch for 2CV-4847-2 to "CLOSE."
 
For each valve, observed green light
 
ON; red light OFF.
N/A  SAT  UNSAT (C) 12. Close RCP bleedoff relief isolation
 
t o quench tank valve (2CV
-4856).
POSITIVE CUE:
Green light ON.
On panel 2C09, placed handswitch
 
for 2CV-4856 to "CLOSE"
 
Observed green light ON; red light
 
OFF. N/A  SAT  UNSAT END JPM- ANO-2-JPM-RO-RCP02  PAGE  6  OF  6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY
 
JPM INITIAL TASK CONDITIONS:
 
2A1, 2A2, are re
-energized from SU#2 following a degraded power situation.
2202.010 ATT. 29 steps up to 1.n have been completed.
Power to CCW pumps has been restored.
 
INITIATING CUE:
 
The SM/CRS directs, "Restore CCW to the RCP's using EOP 2202.010 Attachment 21." 
 
ANO-2-JPM-NRC-2RS4A  PAGE 1 of 11  2  REV #: 000  DATE:    SYSTEM/DUTY AREA:
AC Electrical Distribution TASK:  Perform A Startup Of 2Y2224, Swing Inverter For 2RS4 (Alternate Success Path)
JTA#:  ANO2AO120ACNORM5 KA VALUE  RO:  3.4  SRO:  3.9  KA
 
==REFERENCE:==
 
062 A2.01  APPROVED F OR ADMINISTRATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X  BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TES TING ENVIRONMENT:
SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:  PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
2107.003 and 2107.001 supplement 4.
EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  Total Time SIGNED:  DATE:    SIGNATURE I NDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-NRC-2RS4A  PAGE 2 of 11 
 
THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checkli st - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
: 1. Unit is in Mode 1.
: 2. 2Y2224 is shut down.
: 3. 2RS4 is being supplied by Inverter 2Y24 Normal Source.      TASK STANDARD:
: 1. 2Y2224 Alternate Source is supplying 120VAC Vital Bus 2RS4 in accordance with OP 2107.003,      Attachment J, Section 1.
: 2. Procedure was halted when examinee was prompted of the Low Inverter Voltage Alarm.
: 3. Examinee did not place 2Y2224 on normal source with low inverter voltage.
TASK PERFORMANCE AIDS:
2107.003 Attachment J, Section 1 2107.001 Supplement 4, Table 11 SIMULATOR SETUP:
NONE ANO-2-JPM-NRC-2RS4A  PAGE 3 of 11  INITIATING CUE:
The SM/CRS directs you to, "
Place 2Y2224 in service with the inverter supplying 2RS4 and shutdown 2Y24 using 2107.003, Attachment J Section 1 and 2107.001 Supp. 4 Table 11
."  CRITICAL ELEMENTS (C):
9, 12, 13, 20, 27, 30, 31 START TIME:
 
PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 1. Verify Battery INPUT breaker (B1) OPEN  POSITIVE CUE:
B1 handle is in the DOWN position  At 2Y2224, verified B1 OPEN Observed B1 handle in the DOWN position N/A  SAT  UNSAT
: 2. Ver ify INVERTER OUTPUT BREAKER (B2) OPEN POSITIVE CUE:
B2 handle is in the DOWN position  At 2Y2224, verified B2 OPEN.
Observing B2 handle in the DOWN position N/A  SAT  UNSAT
: 3. Verify ALTERNATE SOURCE INPUT breaker (B800) OPEN POSITIVE CUE:
B800 hand le is in the DOWN position  At 2Y2224, verified B800 OPEN Observed B800 handle in the DOWN position N/A  SAT  UNSAT
: 4. Verify MANUAL BYPASS SWITCH (2HS9601) in
 
ALTERNATE SOURCE
 
POSITION  POSITIVE CUE:
MANUAL BYPASS SWITCH (2HS9601) in ALTERNATE
 
SOURCE POSITION At 2Y2224, observed MANUAL BYPASS SWITCH (2HS9601) in
 
ALTERNATE SOURCE
 
POSITION  N/A  SAT  UNSAT
 
ANO-2-JPM-NRC-2RS4A  PAGE 4 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 5. Verify Manual OUTPUT TRANSFER SWITCH (2HS
-9504) at top of panel in 2Y2224 to 2RS4 position.
POSITIVE CUE:
Manual OUTPUT TRANSFER SWITCH (2HS
-9504) at top of panel is in 2Y2224 to 2RS4 position. At 2Y2224, verified Manual OUTPUT TRANSFER SWITCH
 
(2HS-9504) at top of panel in 2Y2224 to 2RS4 position.
N/A  SAT  UNSAT
: 6. Check 2Y2224 To 2RS4 light on. POSITIVE CUE:
2Y2224 To 2RS4 light on At 2Y2224, observed 2Y2224 To 2RS4 light on N/A  SAT  UNSAT
: 7. Check 2D12 battery bank connected to 2D02 bus.
POSITIVE CUE:
The 2D12 NOT AVAILABLE alarm is not in.
Called the Control Room to verify the 2D12 NOT AVAILABLE alarm
 
is not in.
N/A  SAT  UNS AT  8. Check the in
-service battery charger (2D32A/2D32B) on float. POSITIVE CUE:
: 1. The float lamp for the in
-service battery charger is lit. OR The in-service battery charger DC voltage is ~130 VDC. 2. Battery charger has been on float for 72 hours.
Checked the float lamp illuminated for the in
-service battery charger.
OR Checked the in
-service battery charger DC voltage ~130 VDC.
AND  Contacted the Control room to verify that battery changer has
 
been on float for greater than 24
 
hours. N/A  SAT  UNSAT
 
ANO-2-JPM-NRC-2RS4A  PAGE 5 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 9. Close Battery INPUT breaker (B1)  POSITIVE CUE:
Battery Input breaker (B1) is in the UP position.
At 2Y2224, closed B1 by moving its handle in UP direction Observed B1 operating handle remained in the UP position N/A  SAT  UNSAT
: 10. Check 2Y2224 1 25 VDC INVERTER INPUT (V1) reading
~125 VDC  POSITIVE CUE:
2Y2224 125 VDC INVERTER INPUT (V1) reading ~125 VDC At 2Y2224 checked 2Y2224 125 VDC INVERTER INPUT (V1)
 
reading ~125 VDC N/A  SAT  UNSAT Instructor Note:
Procedure step 1.2.11 will be NA due to voltage being indicated in step 1.2.10.
: 11. Wait 60 seconds POSITIVE CUE:
60 seconds has elapsed At 2Y2224, verified 60 seconds elapsed    N/A  SAT  UNSAT (C) 12. Close 2Y2224 INVERTER OUTPUT breaker (B2)
POSITIVE CUE:
2Y2224 INVERTER OUTPUT break er (B2) handle is in the UP position.
At 2Y2224, closed 2Y2224 INVERTER OUTPUT breaker (B2) by raising its handle in UP
 
direction    N/A  SAT  UNSAT (C) 13. Close 2Y2224 ALTERNATE SOURCE INPUT breaker (B800)  POSITIVE CUE:
2Y2224 ALTERNATE SOURCE INPUT breaker (B800) handle is in the UP position At 2Y2224, closed 2Y2224 ALTERNATE SOURCE INPUT
 
breaker (B800) by raising its
 
handle in the UP direction N/A  SAT  UNSAT
 
ANO-2-JPM-NRC-2RS4A  PAGE 6 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 14. Check 2Y2224 120 VAC ALTERNATE SOURCE Volt
 
Meter (V3) reading ~120 VAC.
POSITIVE CUE: 2Y2224 120 VAC ALTERNATE SOURCE Volt Meter (V3) reads
 
~120 VAC. At 2Y2224, observed 2Y2224 120 VAC ALTERNATE SOURCE
 
Volt Meter (V3) reading ~120
 
VAC. N/A  SAT  UNSAT Instructor Note:
Procedure step 1.2.16 will be NA due to voltage being indicate d in step 1.2.15.
: 15. Verify 2Y2224 ALTERNATE SOURCE Supplying Load light
 
is on. POSITIVE CUE:
Amber 2Y2224 ALTERNATE SOURCE Supplying Load light
 
is on. At 2Y2224, verified amber 2Y2224 ALTERNATE SOURCE
 
Supplying Load light is on.
N/A  SAT  UNSAT 1 6. Check 2Y2224 120 VAC OUTPUT Volt Meter (V2)
 
reading ~120 VAC.
POSITIVE CUE:
2Y2224 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.
At 2Y2224, observed 2Y2224 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.
N/A  SAT  UNSAT
: 17. Check 2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.
POSITIVE CUE:
2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.
At 2Y2224, observed 2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.
N/A  SAT  UNSAT Instructor Note
: &#xa8; Examinee is now switching to anothe r inverter, 2Y24
&#xa8; Examinee will transfer this inverter to Alternate Source
 
ANO-2-JPM-NRC-2RS4A  PAGE 7 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 18. Check 2Y24 INVERTER IN SYNC light is on.
POSITIVE CUE:
The green 2Y24 INVERTER IN SYNC light is on.
AT 2Y24 observed the green 2Y24 INVERTER IN SYNC light
 
is on. N/A  SAT UNSAT Instructor Note:
Procedure step 1.3.2 will be NA due to Inverter In Syc lamp being lit in step 1.3.1.
: 19. Enter 24 hour administrative time clock per Supplement 4 of
 
Electrical System Operations
 
(2107.001) for operation with
 
2RS4 panel powered fr om alternate source.
POSITIVE CUE:
Acknowledge 24 hour administrative time clock per
 
Supplement 4 of Electrical
 
System Operations Operator overtly demonstrates the acknowledgement of the 24
 
hour administrative time clock
 
per Supplement 4 of Electrical
 
Sy stem Operations (2107.001) for operation with 2RS4 panel powered from alternate source.
N/A  SAT  UNSAT (C) 20. Depress 2Y24 ALTERNATE SOURCE TO LOAD pushbutton
 
(2PB-9402). POSITIVE CUE:
2Y24 ALTERNATE SOURCE TO LOAD pushbutton (2PB
-9402) is depressed.
At 2Y24, depressed 2Y24 ALTERNATE SOURCE TO LOAD
 
pushbutton (2PB
-9402). N/A  SAT  UNSAT
: 21. Check 2Y24 ALTERNATE SOURCE SUPPLYING LOAD
 
light comes ON.
POSITIVE CUE:
The amber 2Y24 ALTERNATE SOURCE SUPPLYING LOAD
 
light comes ON.
At 2Y24, observed t he amber 2Y24 ALTERNATE SOURCE SUPPLYING LOAD light comes
 
ON. N/A  SAT  UNSAT
 
ANO-2-JPM-NRC-2RS4A  PAGE 8 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 22. Check 2Y24 INVERTER SUPPLYING LOAD light is
 
OFF. POSITIVE CUE:
The green 2Y24 INVERTER SUPPLYING LOAD light is
 
OFF. At 2Y24, observed the green 2Y24 INVERTER SUPPLYING
 
LOAD light is OFF N/A  SAT  UNSAT
: 23. Place the 2Y24 MANUAL BYPASS SWITCH (2HS
-9801) in the ALTERNATE SOURCE position. POSITIVE CUE:
The 2Y24 MANUAL BYPASS SWITCH (2HS
-9801) is in the ALTERNATE SOURCE position.
At 2Y24, rotated the 2Y24 MANUAL BYPAS S SWITCH (2HS-9801) to the ALTERNATE SOURCE position.
N/A  SAT  UNSAT
: 24. Check 2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120
 
VAC. POSITIVE CUE:
2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.
At 2Y24, observed 2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.
N/A  SAT  UNSAT
: 25. Check 2Y24 OUTPUT FREQUENCY Meter (E1)
 
reading ~60 Hertz.
POSITIVE CUE:
2Y24 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.
At 2Y24, observed 2Y24 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.
N/A  SAT UNSAT ANO-2-JPM-NRC-2RS4A  PAGE 9 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 26. Verify the STATIC SWITCH TRANSFERRED alarm is IN
 
alarm. POSITIVE CUE:
The STATIC SWITCH TRANSFERRED alarm is IN
 
alarm on 2Y2224.
At 2Y2224, verify the STATIC SWITCH TRANSFERRED alarm
 
is IN alarm.
N/A  SAT  UNSAT (C) 27. At 2Y24, place man ual 2RS4 TRANSFER SWITCH (2HS
-9602) at top of panel in the 2Y2224 To 2RS4 position.
POSITIVE CUE:
Manual 2RS4 TRANSFER SWITCH (2HS
-9602) at top of panel is in the 2Y2224 To 2RS4 position. At 2Y24, rotated the Manual 2RS4 TRANSFER SWITCH
 
(2HS-9602) at top of panel to the 2Y2224 To 2RS4 position.
N/A  SAT  UNSAT
: 28. Check the 2Y2224 To 2RS4 light comes on.
POSITIVE CUE:
The 2Y2224 To 2RS4 light is on. At 2Y24, observed the 2Y2224 To 2RS4 light comes on.
N/A  SAT  UNSAT Instructor Note
: &#xa8; Examinee is now switching to another inverter, 2Y2224.
&#xa8; Examinee will take steps to transfer this inverter to NORMAL SOURCE.
: 29. Check 2Y2224 INVERTER IN SYNC light is on.
POSITIVE CUE:
The green 2Y2224 INVERTER IN SYNC light is on.
AT 2Y2224 observed the green 2Y2 224 INVERTER IN SYNC light is on.
N/A  SAT  UNSAT Instructor Note:
Procedure step 1.4.2 will be NA due to INVERTER IN SYNC lamp being lit in step 1.4.1.
 
ANO-2-JPM-NRC-2RS4A  PAGE 10 of 11  PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 30. Place the Inverter 2Y2224 MANUAL BYPASS SWITCH
 
(2HS-9601) in the NORMAL SOURCE position.
POSITIVE CUE:
The Inverter 2Y2224 MANUAL BYPASS SWITCH (2HS
-9601) in the NORMAL SOURCE position. At 2Y2224, rotated the Inverter 2Y2224 MANUAL BYPASS
 
SWITCH (2HS
-9601) in the NORMAL SOURCE position.
N/A  SAT  UNSAT Instructor Note:
The following step is the alternate success path step. The examinee shall not transfer the inverter to the INVERTER SUPPLYING LOAD with the LOW INVERTER VOLTAGE alarm present. The examinee will stop the evolution and contact the control room for guidance.
(C) 31. Check all alarms clear except the STATIC SWITCH TRANSFER (ST/SW) alarm.
NEGATIVE CUE:
The following alarms are in:
* LOW INVERTER VOLTAGE
* STATIC SWITCH TRANSFER (ST/SW)
WHEN the examinee notifies the control room, THEN give the
 
following cue:
"Stop and report to the control room for a brief."
Examinee notified the control room of the abnormal indication.
N/A  SAT  UNSAT END  STOP TIME:
 
ANO-2-JPM-NRC-2RS4A  PAGE 11 of 11  EXAMINEE'S COPY
 
JPM INITIAL TASK CONDITIONS
:  1. 2Y2224 is shut down.
: 2. 2RS4 is being supplied by Inverter 2Y24 Normal Source.
INITIATING CUE:
The SM/CRS directs, "Place 2Y2224 in service supplying 2RS4 and shutdown 2Y24 using OP 2107.003, Attachment J Section 1 and OP 2107.001 Supp. 4 Table 11
."
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 57 of 92 CHANGE: 018-03-0  A TTACHMENT J PAGE 1 OF 13 INVERTER 2Y24 OPERATION This Attachment is used to transfer 2RS4 power supply between 2Y24 and 2Y2224 with
 
instructions to startup and shutdown the inverters. When transferring 2RS4 power
 
both inverters MUST be on ALTERNATE SOURCE. GO TO the appropriate section for instructions on performing the task desired.
 
===1.0 SHIFTING===
2RS4 POWER FROM 2Y24 TO 2Y2224
 
===2.0 SHIFTING===
2RS4 POWER FROM 2Y2224 TO 2Y24
 
===3.0 SHIFTING===
2RS4 POWER FROM 2Y24 NORMAL SOURCE TO 2Y24 ALTERNATE SOURCE AND SHUTDOWN OF INVERTER, IF DESIRED
 
===4.0 SHIFTING===
2RS4 POWER FROM 2Y24 ALTERNATE SOURCE TO 2Y24 NORMAL SOURCE 5.0 STARTUP OF 2Y24 INVERTER SECTION WITH 2RS4 SUPPLIED FROM 2Y24 ALTERNATE SOURCE AND SHIFTING 2RS4 TO 2Y24 NORMAL SOURCE 6.0 2Y24 STARTUP WITH 2RS4 DE
-ENERGI ZED  CAUTION
* After startup of a de
-energized inverter, "STATIC SWITCH TRANSFERRED" is only expected RIS Unit alarm. DO NOT transfer load to this inverter unless all other RIS Unit alarms are clear.
* After startup of a de
-energized inverter, "INVERTER OUTP UT OVERVOLTAGE" alarm may briefly occur. This condition may exist for a few minutes to an hour depending on room temperature conditions. All load transfers SHALL
 
be halted until this condition clears.
(CR-ANO-2-2002-1138). 1.0  SHIFTING 2RS4 POWER FROM 2 Y24 TO 2Y2224 1.1  IF 2Y2224 is NOT shutdown, THEN perform the following to align to ALTERNATE SOURCE:  1.1.1  Check 2Y2224 INVERTER IN SYNC light is on.
1.1.2  IF INVERTER IN SYNC light is NOT on, THEN contact Electrical Maintenance for assistance.
 
====1.1.3 Depress====
2Y2224 ALT SOURCE TO LOAD pushbutton (2PB
-9504). 1.1.4  Check 2Y2224 ALT SOURCE SUPPLYING LOAD light on.
 
====1.1.5 Check====
2Y2224 INVERTER SUPPLYING LOAD light out.
 
====1.1.6 Verify====
2Y2224 MANUAL BYPASS SWITCH (2HS
-9601) in ALTERNATE SOURCE positi on. 1.1.7  Check 2Y2224 120 VAC OUTPUT voltage (V2) indicates
~ 120 volts. 1.1.8  Check 2Y2224 OUTPUT FREQUENCY (E1) is ~
60 Hz. 1.1.9  Verify OUTPUT TRANSFER SWITCH (2HS-9504) at top of panel placed in 2Y2224 TO 2RS4 position.
 
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 58 of 92 CHANGE: 018-03-0  1.1.10  Check 2Y2224 TO 2RS4 light comes on.
 
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 59 of 92 CHANGE: 018-03-0  ATTACHMENT J PAGE 2 OF 13 1.2  IF Swing Inverter 2Y2224 is shutdown, THEN start up 2Y2224 on ALTERNATE SOURCE as follows:
 
====1.2.1 Verify====
2Y2224 125 VDC INPUT breaker (B1) open.
 
====1.2.2 Verify====
2Y2224 120 VAC INVERTER OUTPUT breaker (B
: 2) open. 1.2.3  Verify 2Y2224 ALT SOURCE INPUT breaker (B800) open.
 
====1.2.4 Verify====
2Y2224 MANUAL BYPASS SWITCH (2HS
-9601) in ALTERNATE SOURCE position.
 
====1.2.5 Verify====
OUTPUT TRANSFER SWITCH (2HS
-9504) at top of panel in 2Y2224 TO 2RS4 position.
1.2.6  Ch eck 2Y2224 TO 2RS4 light on.
CAUTION Energizing off
-line inverter, while battery bank is disconnected from the DC bus or in-service battery charger is on equalize, will blow fuses on the on-line inverters.
 
====1.2.7 Check====
2D12 battery bank connected to 2D 02 bus. 1.2.8  Check in-service battery charger (2D32A/B) as follows:
* Check battery charger on float.
* Check battery charger has been on float > 24 hours.
 
====1.2.9 Close====
2Y2224 125 VDC INPUT breaker (B1).
1.2.10  Check 2Y2224 125 VDC INVERTER INPUT (V1) re ading ~ 125 volts. 1.2.11  IF no voltage indicated, THEN verify 2Y2224 DC supply feeder (2D0231) closed AND "Fuse Blown" light NOT lit.
1.2.12  Wait 60 seconds for inverter to stabilize.
1.2.13  Close 2Y2224 120 VAC INVERTER OUTPUT breaker (B2).
1.2.1 4  Close 2Y2224 ALTERNATE SOURCE INPUT breaker (B800).
1.2.15  Check 2Y2224 120 VAC ALT SOURCE (V3) reading ~
120 volts. 1.2.16  IF no voltage indicated, THEN verify 2Y2224 ALTERNATE SOURCE Supply (2B61
-N4) closed. 1.2.17  Verify 2Y2224 ALT SOURCE SUPPL YING LOAD light is on.
 
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 60 of 92 CHANGE: 018-03-0  1.2.18  Check 2Y2224 120 VAC OUTPUT (V2) indicates ~
120 volts.
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 61 of 92 CHANGE: 018-03-0  ATTACHMENT J PAGE 3 OF 13
 
1.2.19  Check 2Y2224 OUTPUT FREQUENCY (E1) is ~
60 Hz. 1.3  IF 2RS4 is supplied from 2Y24 NORMAL SOURCE, THEN transfer 2RS4 to 2Y24 ALTER NATE SOURCE AND THEN to 2Y2224 ALTERNATE SOURCE as follows:
 
====1.3.1 Check====
2Y24 INVERTER IN SYNC light is on.
1.3.2  IF INVERTER IN SYNC light is NOT on, THEN contact Electrical Maintenance for assistance.
1.3.3  IF in Mode 1
-4, THEN enter 24-hour adminis trative time clock per Supplement 4 of Electrical System Operations (2107.001) for operation with 2RS4 panel powered from ALTERNATE SOURCE. 1.3.4  Depress 2Y24 ALT SOURCE TO LOAD pushbutton (2PB
-9402). 1.3.5  Check 2Y24 ALT SOURCE SUPPLYING LOAD light co mes on. 1.3.6  Check 2Y24 INVERTER SUPPLYING LOAD light goes out.
 
====1.3.7 Place====
2Y24 MANUAL BYPASS SWITCH (2HS
-9801) in ALTERNATE SOURCE position.
 
====1.3.8 Check====
2Y24 120 VAC OUTPUT voltage indicates ~
120 volts. 1.3.9  Check 2Y24 OUTPUT FREQUENCY (E1) is
~ 60 Hz. 1.3.10  WHEN ONLY "STATIC SWITCH TRANSFERRED" is in alarm on 2Y2224, THEN continue performance of this section.
(CR-ANO-2-2002-1138)  1.3.11  At 2Y24, place 2RS4 TRANSFER SWITCH (2HS
-9602) at top of panel in the 2Y2224 TO 2RS4 position.
1.3.12  At 2Y24, check 2Y2224 TO 2RS4 light comes on.
 
PROC./WORK PLAN NO.
2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 62 of 92 CHANGE: 018-03-0  ATTACHMENT J PAGE 4 OF 13 1.4  IF desired to shift 2RS4 loads to 2Y2224 NORMAL SOURCE, THEN perform the following:
 
====1.4.1 Check====
2Y2224 INVERTER IN SYNC light is on.
1.4.2  IF INVERTER IN SYNC light is NO T on, THEN contact Electrical Maintenance for assistance.
 
====1.4.3 Place====
Inverter 2Y2224 MANUAL BYPASS SWITCH (2HS
-9601) in NORMAL SOURCE position.
 
====1.4.4 Check====
all alarms clear except ST/SW Transfer.
 
====1.4.5 Depress====
2Y2224 INVERTER TO LOAD pushbutton (2PB
-9502). 1.4.6  Check 2Y2224 INVERTER SUPPLYING LOAD light comes on.
 
====1.4.7 Check====
2Y2224 ALT SOURCE SUPPLYING LOAD light goes out.
 
====1.4.8 Reset====
2Y2224 local alarm panel.
 
====1.4.9 Check====
2RS4 INVERTER TROUBLE (2K01
-G11) is cleared.
1.4.10  Verify 2RS4 ope rable by performing the necessary portions of Supplement 4 of 2107.001.
1.4.11  IF applicable, THEN exit 24-hour administrative time clock per Supplement 4 of 2107.001 for operation with 2RS4 panel powered from ALTERNATE SOURCE. 1.5  IF desired to shutdo wn 2Y24, THEN perform the following:
1.5.1  Open 2Y24 ALT SOURCE INPUT breaker (B800).
1.5.2  Open 2Y24 120 VAC INVERTER OUTPUT breaker (B2).
1.5.3  Open 2Y24 125 VDC INPUT breaker (B1).
 
PROC./WORK PLAN NO.
2107.001 PROCEDURE/WORK PLAN TITLE: ELECTRICAL SYSTEM OP ERATIONS PAGE: 129 of 169 CHANGE: 047-05-0  SUPPLEMENT 4 PAGE 12 OF 17 TABLE 10, 2RS2 SUPPLY INVERTER 2Y22 O R 2Y2224 (Circle one)
TEST QUANTITY MEASURED VALUE ACCEPTABLE NORMAL RANGE IS DATA WITHIN ACCEPTABLE NORMAL RANGE? 125 VDC Input Breaker (B1)
(  ) if closed Closed YES      NO 120 VAC Inverter Output (B2)
(  ) if closed Closed YES      NO Manual Bypa ss  switch (  ) if in Normal Source Normal Source YES      NO Inverter  Supplying Load
(  ) if Light On Light On (1)
YES      NO 120 VAC Output V > 117V < 126V YES      NO Inverter output voltage E2RS2 OR E2RS2RS4 (SPDS)
V > 105V < 137.5V YES      NO Alt Source Status Z2Y22B OR Z2Y2224 (SPDS)
(  ) if in Normal Normal YES      NO TABLE 11, 2RS4 SUPPLY INVERTER 2Y24 OR 2Y2224 (Circle one)
TEST QUANTITY MEASURED VALUE ACCEPTABLE NORMAL RANGE IS DATA WITHIN ACCEPTABLE NORMAL RANGE? 125 VDC Inpu t Breaker (B1)
(  ) if closed Closed YES      NO 120 VAC Inverter Output (B2)
(  ) if closed Closed YES      NO Manual Bypass switch (  ) if in Normal Source Normal Source YES      NO Inverter  Supplying Load
(  ) if Light On Light On (1)
YES      NO 120 VAC Output V > 117V < 126V YES      NO Inverter output voltage E2RS4 OR E2RS2RS4 (SPDS)
V > 105V < 137.5V YES      NO Alt Source Status Z2Y24B OR Z2Y2224 (SPDS)
(  ) if in Normal Normal YES      NO (1) Alternate indications such as remote annunciator (2K01
- "2RSX INVERTER TROUBLE" NOT in alarm) OR local indication ("2YXX ALT SOURCE SUPPLYING LOAD" light out) may be used to verify Inverter supplying load.
(2) Voltage band defines RS Bus operability for steps 3.4.1/3.4.2 of this section (ULD-2-SYS-20, CR-ANO-2-2001-01134). (3) Voltage band defines DC Input voltage (ULD SYS-03).  (2) (2) (3) (3)
ANO-2-JPM-NRC-SFPSW  PAGE 1 OF 8  JOB PERFORMANCE MEASURE UNIT: 2  REV #: 001  DATE:    SYSTEM/DUTY AREA:
Spent Fuel Pool Cooling System TASK:  Add water to the Spent Fuel Pool (Alternate Success Path)
JTA#:  ANO2WCOSFPEMER1 KA VALUE  RO:  3.1  SRO:  3.5  KA
 
==REFERENCE:==
 
033 A2.03  APPROVED FOR ADMINIST RATION TO:
RO:  X  SRO:  X  TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X  BOTH:    SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:    POSITION EVALUATED:
RO:  SRO:    ACTUAL TESTING ENVIRO NMENT:  SIMULATOR:
PLANT SITE:
LAB:  TESTING METHOD:
SIMULATE:  PERFORM:    APPROXIMATE COMPLETION TIME IN MINUTES:
20 Minutes REFERENCE (S):
OP 2104.006 EXAMINEE'S NAME:
SSN:  EVALUATOR'S NAME:
THE EXAMINEE'S PERFORMANCE WAS EVALUAT ED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
Start Time Stop Time  Total Time SIGNED:  DATE:    SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.
 
ANO-2-JPM-RO-SFPSW  PAGE 2 OF  8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
The following conditions exist:
: 1. Plant is in DEFUELED and all cask loading operations are secured.
: 2. Power has been lost to both SFP cooling pumps and 2K11
-K5 "FUE L POOL TEMP HI" is in alarm.
: 3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
: 4. SFP purification is out of service for replacement of 2FP
-10, SFP purification pump discharge.
: 5. Fuel Pool low level alarm is in and SFP level is lowering.
TASK STANDARD:
Emergency Spent Fuel Pool Makeup from Loop 2 Service Water has been initiated.
TASK PERFORMANCE AIDS:
OP 2104.006 Section 10 and 14 SIMULATOR SETUP:
NONE ANO-2-JPM-RO-SFPSW  PAGE 3 OF  8 JOB PERFORMANCE MEASURE INITIATING CUE:
The SM/CRS di rects, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006,"
Section 10.0 beginning with step 10.5" CRITICAL ELEMENTS (C
):    2, 3, 4, 5, 6, 8, 9, 11, 13
 
START TI ME:
PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 1. Verified S pent Fuel Pool Purification Pump (2P66) secured. POSITIVE CUE:
Green light ON, red light OFF.
NEGATIVE CUE:
Red light ON, green light OFF.
Locally verified 2P66 handswitch (2HS-5411) in STOP and observed green light ON, red light OFF.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.
(C) 2. Verify RWT to Fuel Pool Isolation valve (2FP
-46) closed.
POSITIVE CUE:
2FP-32 stem inserted fully and valve is closed.
NEGATIVE CUE:
2FP-32 stem withd rawn fully and valve is open.
Verified 2FP
-46 Closed by observing stem fully inserted into the valve and rotating handwheel
 
counterclockwise.
N/A  SAT  UNSAT (C)  3. Verify Borated MU or RWT to 2P-66 (2FP-32) closed.
POSITIVE CUE:
2FP-32 stem is fu lly inserted.
NEGATIVE CUE:
2FP-32 stem withdrawn fully.
Verified 2FP
-32 CLOSED by observing valve stem fully inserted into the valve and rotating handwheel counterclockwise.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 354' RAB VCT valve gallery.
 
ANO-2-JPM-RO-SFPSW  PAGE 4 OF  8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 4. Close Makeup to Charging Pump Suction (2CVC
-83). POSITIVE CUE:
Resistance to operation indicated; valve position indicator aligned to
 
CLOSE. NEGATIVE CUE:
Valve position indicator in OPEN; or in an intermediate position.
Closed 2CVC
-83 by pulling o n right-hand side of chain (from the chain operator).
Observed valve closed position indication on valve reach rod
 
actuator. N/A  SAT  UNSAT (C) 5. Verify Manual Makeup to VCT (2CVC-68) closed.
POSITIVE CUE:
Resistance to operation indicated; valve po sition indicator aligned to CLOSE. NEGATIVE CUE:
Valve position indicator in OPEN; or in an intermediate position.
Attempted to rotate reach rod handwheel CW noting resistance
 
to motion.
Observed valve closed position indication on valve reach rod
 
actuat or. N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 354' RAB spent fuel pool valve gallery just off elevator
. Examiner's NOTE:
This is the ALTERNATE SUCCESS PATH CUE step. 2CVC
-66 will not open and therefore CVCS system cannot be used to makeup to the SPF. A prompt will be given from the control room to use Loop 2 service water as makeup source.
(C) 6. Open MU to SF Pool (2CVC
-66). CUE: Valve stem full
-in and valve will not move. Attempted to open 2CVC
-66 by rotating handwheel CCW.
N/A  SAT  UNSA T
ANO-2-JPM-RO-SFPSW  PAGE 5 OF  8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 7. Notify control room of inability to open 2CVC-66. CUE: Control room acknowledges that 2CVC-66 will not open and that section 14 of OP 2104.006, Fuel Pool Systems, should be used to
 
add Loop 2 service water to the
 
SFP starting with step 14.1.
Notifi ed the Control room of inability to open 2CVC
-66. N/A  SAT  UNSAT EXAMINER's NOTE:
Purification pump was previously identified as secured in initial conditions (Procedure step 14.1.1).
(C) 8. Close SW Header 2 Telltale Drain (2SW-1211). POSITIVE CUE
: 2SW-1211 has stem inserted into hand wheel.
Closed 2SW
-1211 by turning hand wheel Clockwise.
Observed valve stem fully inserted into the valve.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 335' RAB just off elevator. Valve is chain operated and is located about 20' in overhead in middle of North / South corridor.
(C) 9. Open SW Header 2 Emergency Feed Isolation valve (2SW
-67). POSITIVE CUE:
2SW-67 chain will not rotate any more and valve is fully open.
NEGATIVE CUE:
2SW-67 is closed.
Opened 2SW
-67 by turning chain Counterclockwise until chain stopped rotating.
N/A  SAT  UNSAT TRANSITION NOTE:
Go to elevation 354' RAB spent fuel pool valve gallery just off elevator
. EXAMINER'S NOTE:
When asked for Category E key, simulate giving examinee key from the control room for valve 2SW 56.
 
ANO-2-JPM-RO-SFPSW  PAGE 6 OF  8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
: 10. Ensure position of 2SW
-56 is logged in Category "E" Log.
POSITIVE CUE:
Valve position is logged in CAT 'E' log. Logged position of 2SW
-56 by:  Using a plant telephone, Gaitronics, OR radio; contacted Control Room and directed entry in Category "E" Log.      OR  Ensured Category "E" log entry made upon completion of evolution.
N/A  SAT  UNSAT (C) 11. Open SW Header 2 Emergency Feed Isolation valve (2SW
-56). POSITIVE CUE:
2SW-56 valve stem is fully extended and valve is open.
NEGATIVE CUE:
2SW-56 valve stem is inserted and valve is closed Unlocked locking device on 2SW-56 using category 'E' valve key. Opened 2SW
-56 by turning handwheel CCW.
Observed valve stem fully withdrawn out of the valve.
N/A  SAT UNSAT  12. Verify Operator in SFP to monitor level and is in communication with
 
Operator at SW Header 2
 
Emergency Feed Isolation to SF
 
Pool (2SW-62)  POSITIVE CUE:
Operator in SFP responds to radio communications.
Verified that an Operator was stationed t o monitor SFP level and is in communication with Operator at SW Header 2 Emergency Feed
 
Isolation to SF Pool (2SW
-62)    N/A  SAT  UNSAT EXAMINERS NOTE:
-  Final valve position is at discretion of examinee to ensure level is raised/maintained.
 
ANO-2-JPM-RO-SFPSW  PAGE 7 OF  8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)
(C) 13. T hrottles open SW Header 2 Emergency Feed Isolation valve to SF Pool (2SW
-62). POSITIVE CUE:
Operator stationed at SFP reports level rising slowly.
NEGATIVE CUE:
Operator reports NO change in SFP level.
Throttled open 2SW
-62 by turning handwheel CCW.
Obs erved valve stem withdrawn out of the valve commensurate with valves throttling.
N/A  SAT  UNSAT END  STOP TIME:
 
ANO-2-JPM-RO-SFPSW  PAGE 8 OF  8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:
: 1. Plant is in DEFUELED and all cask loading operations are secured.
: 2. Power has been lost to both SFP cooling pumps.
: 3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
: 4. SFP purification is out of service for replacement of 2FP
-10, SFP purification pump discharge.
: 5. Fuel Pool low l evel alarm is in and SFP level is lowering.
INITIATING CUE:
The SM/CRS directs, "Align for makeup water addition to the SFP system
 
from CVCS using OP 2104.006, Section 10.0 beginning with step 10.5"
 
PROC./WORK PLAN NO.
2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 10 of 101 CHA NGE:
* When SFP level >
401'7", water may spill over throu gh pipe chase to 335' elevation due to starting/stopping SFP Cooling/Purification pumps.
* SFP volume ~ 500 gal/inch.
* SFP/Tilt Pit volume ~ 600 gal/inch (Tilt Pit gate not sealed/not installed).
* SFP/CLP volume ~ 560 gal/inch (CLP gate not sealed/not installe d).
* SFP/Tilt Pit/CLP volume ~ 660 gal/inch (Tilt Pit AND CLP gates not sealed/not installed).
* SFP, Tilt Pit and Refueling Canal volume ~ 1650 gal/inch.
* Coordinate with Dry Fuel personnel when making up during Dry Fuel Operations.
{4.3.2}
* Steps marked with an
* are continuous action steps.
10.1 IF Cask Loading Operations are in progress, THEN notify DFS Management of intent to add to SFP.
10.2 Calculate amount of boric acid or water needed to achieve desired fuel pool level and concentration using appropri ate attachment or Boron 2 Program.
10.3 Verify Chemical Addition portion of CVCS available.
10.4 Verify VCT Makeup Valve (2CV
-4941-2) closed.
10.5 IF Purification NOT in service OR is aligned to RWT, THEN verify the following:
10.5.1 Fuel Pool Purificatio n Pump (2P
-66) off. 10.5.2 RWT to Fuel Pool Isol (2FP
-46) closed.
10.5.3 Borated MU or RWT to 2P
-66 (2FP-32) closed.
10.6 Verify the following valves closed:
* Manual Makeup to Charging Pump Suction (2CVC
-83)
* Manual Makeup to VCT (2CVC
-68) 10.7 Verify the fo llowing valves open:
* MU to SF Pool (2CVC
-66)
* Borated MU to Fuel Pool (2CVC
-67)
* Borated MU, RWT, SW to Fuel Pool (2FP
-31)
PROC./WORK PLAN NO.
2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 11 of 101 CHA NGE:    10.8 Station an Operator to monitor SFP level in communication with Control Room.
 
PROC./WORK PLAN NO.
2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 12 of 101 CHA NGE:    *10.9 Monitor Reactor Power during makeup to Fuel Po ol in case 2CV-4941-2, 2CVC-68, or 2CVC
-83 has seat leakage.
10.10 Add calculated amounts of boric acid and water from CVCS by using the Boric Acid MU System in MANUAL as follows:
10.10.1 IF water is to be added, THEN perform the following:
A. Verif y either RMW pump (2P
-109A OR 2P
-109B) running. B. Set RMW Flow controller (2FIC
-4927) to desired flow. C. IF NO Boric Acid to be added, THEN verify Boric Acid MU Flow Controller (2FIC-4926) in MANUAL with OUTPUT DEMAND < zero.
10.10.2 IF Boric Acid is to be added, THEN perform the following:
A. Select desired BAM Pump (2P
-39A OR 2P-39B) for start using BAM Pump Select Switch (2HS
-4911-2). B. Start desired BAM Pump (2P
-39A OR 2P-39B). C. Open associated Recirc (2CV
-4903-2 OR 2CV-4915-2). D. Set Boric Acid M U Flow Controller (2FIC
-4926) to desired flow rate.
E. IF NO water to be added, THEN verify RMW Flow Controller (2FIC
-4927) in  MANUAL with OUTPUT DEMAND < zero.
10.10.3 Reset Flow totalizers (2FQI
-4926 AND 2FQI-4927) to zero.
10.10.4 Place MU Mode Selecto r switch (2HS
-4928) to MANUAL.
10.10.5 Verify 2CV
-4926 AND 2CV-4927 respond properly.
10.11 WHEN the calculated amounts of boric acid and water have been added, THEN perform the following:
10.11.1 Reposition MU Mode Selector Switch (2HS
-4928) as desired. 10.11.2 Verify 2CV
-4927 closed.
10.11.3 Verify 2CV
-4926 closed.
10.11.4 Verify BAM Pumps secured.
10.11.5 Verify BAM Pump Recirc Valves closed.
10.11.6 Close Borated MU, RWT, SW to Fuel Pool (2FP
-31).
PROC./WORK PLAN NO.
2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 13 of 101 CHA NGE:    10.11.7 Close Borated MU to Fuel Pool (2CVC
-67). 10.1 1.8 Close MU to SF Pool (2CVC
-66). 10.11.9 Return 2FIC
-4927 AND 2FIC-4926 to desired settings.
10.12 Reposition the following as desired:
* 2CV-4941-2
* 2CVC-68
* 2CVC-83 10.13 IF makeup for other than normal evaporation, THEN request Chemistry to sample SFP.
10.14 Align Purification System as desired using appropriate section of this procedure.
 
PROC./WORK PLAN NO.
2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 17 of 101 CHANGE:    14.0 EMERGENCY FUEL POOL MAKEUP FROM SERVICE WATER 14.1 IF desired to use Loop 2 SW to makeup to Fuel Pool, THEN perform the following:
14.1.1 IF SFP is aligned for Pu rification, THEN secure Fuel Pool Purification Pump (2P
-66) to prevent rapid depletion of Fuel Pool Demineralizer (2T-5). 14.1.2 Close SW Hdr 2 Telltale Drain (2SW
-1211). 14.1.3 Open SW Hdr 2 Emerg Feed Isol to Fuel Pool (2SW
-67). 14.1.4 Perform the follow ing:  A. Record unlocking of SW Hdr 2 Emerg Feed Isol (2SW-56)  in Cat E log.
B. Unlock and open 2SW
-56. 14.1.5 Station an Operator to monitor SFP level in communication with Operator at SW Hdr 2 Emerg Feed Isol to SFP (2SW
-62). 14.1.6 Throttle 2SW
-62 as necessary to maintain Fuel Pool level. 14.1.7 WHEN Service Water makeup no longer required, THEN secure as follows:
A. Close 2SW-62. B. Close and lock 2SW
-56. C. Close 2SW-67. D. Open 2SW-1211. E. Independently verify 2SW
-56 locked closed.
 
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 1      SYSTEM/DUTY AREA
: Emergency & Abnormal Operations TASK: Perform local operation of proportional heaters JTA # : ANO2-RO-EOPAOP-OFFNORM-126  KA VALUE  RO: 4.1  SRO: 4.2  KA
 
==REFERENCE:==
 
068 AA1.07 APPROVED FOR ADMINISTRATION TO:
RO: X    SRO: X  TASK LOCATION:
INSIDE CR:
OUTSIDE CR:
X  BOTH:  SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):
PLANT SITE:
Simulate  SIMULATOR:
LAB:  POSITION EVALUATED: RO: SRO:
ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:
TESTING METHOD:  SIMULATE:
PERFORM:  APPROXIMATE COMPLETION TIME IN MINUTES:
15 minutes REFERENCE (S):
AOP 2203.014 Rev. 014 0, Alternate Shutdown EXAMINEE'S NAME:
SSN: 
  -  -        EVALUATOR'S NAME:
DATE:
THE EX AMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:
SATISFACTORY:
UNSATISFACTORY:
PERFORMANCE CHECKLIST COMMENTS:
 
Start Time:
Stop Time:
Total Time:
Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.
 
SIGNED:        DATE:
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 2 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:
The examiner shall review the "Briefing Checklist
- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.
JPM INITIAL TASK CONDITIONS:
The following conditions exist.
: 1. A fire has occurred in the Control Room rendering the Control Room uninhabitable.
: 2. RCS pressure is 1840 p sia. 3. Pressurizer Level is 44%
TASK STANDARD:
Proportional heater control has been established locally at 2C117 and 2C118 and the heaters have been energized.
TASK PERFORMANCE AIDS:
AOP 2203.014, Alternate Shutdown, Attachment G.
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 3    INITIATING CUE:
Th e SM directs, "Energize pressurizer proportional heaters locally and raise pressurizer pressure to 2250 psia using AOP 2203.014, Attachment G.
 
CRITICAL ELEMENTS (C):
3, 4, 5, 6, 7
 
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 4 
 
START TIME:
 
PERFORMANCE CHECKLIST STANDARDS  (Circle One)
TRANSITION NOTE:
Go to the lower south electrical penetration room.
: 1. Verify "PZR PROP HTR CONT SW" (2HS-4640B) position.
POSITIVE CUE:
2HS-4640B indicates OFF.
On panel 2C117, verified 2HS
-4640B in OFF.
OR  Placed 2HS
-4640B in OFF.
 
N/A    SAT UNSAT  2. Verify "PZR PROP HTR CONT SW" (2HS-4641B) position.
POSITIVE CUE:
2HS-4641B indicates OFF.
On panel 2C118, verified 2HS
-4641B in OFF.
OR  Placed 2HS
-4641B in OFF.
N/A    SAT    UNSAT (C) 3. Place "PZR PROP HTR SEL SW" (2HS-4640A) in E MERG. POSITIVE CUE:
2HS-4640A indicates EMERG. NEGATIVE CUE:
2HS-4640A indicates NORM.
On panel 2C117, verified key inserted in key switch.
Placed 2HS
-4640A in EMERG.
 
N/A    SAT    UNSAT
 
(C) 4. Place "PZR PROP HTR SEL SW" (2HS-4641A) in EMERG
. POSITIVE CUE:
2HS-4641A indicates EMERG. NEGATIVE CUE:
2HS-4641A indicates NORM.
On panel 2C118, verified key inserted in key switch.
Placed 2HS
-4641A in EMERG.
 
N/A    SAT    UNSAT TRANSITION NOTE:
Go to Load Center 2B5.
 
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 5 PERFORMANCE CHECKLIS T  STANDARDS  (Circle One)
Close breaker 2B523 "PRESSURIZER PROPORTIONAL HEATER 2SCR
-1". POSITIVE CUE:
Breaker 2B523 red flag showing. On load center 2B5, depressed breaker 2B523 "close" push button. OR  On load center 2B5, raised the mechanical clos e lever for breaker 2B523.
N/A    SAT    UNSAT Note To Examiner:
: 1. The following breaker (2B623) is simulated to be open and will not close electrically.
: 2. This will require using the mechanical close lever.
 
(C) 6. Close breaker 2B623 "PRESSURIZ ER PROPORTIONAL HEATER 2SCR
-2". POSITIVE CUE:
If the mechanical close lever is used, the Breaker 2B623 red flag showing. NEGATIVE CUE:
If the electrical pushbutton is used, the Breaker 2B623 green flag showing.   
 
On load center 2B6, raised the mechanica l close lever for breaker 2B623.
 
N/A    SAT    UNSAT TRANSITION NOTE:
Go to the lower south electrical penetration room.
 
(C) 7. Energize all proportional heaters. POSITIVE CUE:
2HS-4640 and 2HS 4641 are in "ON". NEGATIVE CUE:
2HS-4640 and/or 2HS 4641 are in "OFF".
On panel 2C117, placed "PZR
 
PROP HTR CONT SW" (2HS
-4640B) in ON.
On panel 2C118, placed "PZR PROP HTR CONT SW" (2HS
-4641B) in ON.
 
N/A    SAT    UNSAT END            STOP TIME:________________
 
JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 6 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS
: The following conditions exist.
??A fire has occurred in the Control Room rendering the Control Room uninhabitable.
??RCS pressure is 1840 psia.
??Pressurizer Level is 44%
INITIATING CUE:
The SM directs, "Energize pressurizer proportional heaters locally and raise pressurizer pressure to 2250 psia using AOP 2203.014, Attachment G.
 
Facility: ANO
-2  Scenario No.:  1 Op-Test No.:  2003
-1 Page 1  Examiners:
Operators:
Initial Conditions:
100% MOL, All ESF systems in standby. Green Train Maintenance Week. 'B' Vacuum pump tagged out for maintenance.
Turnover:
100%. 250 EFPD.  'B' Vacuum pump tagged out for maintenance. Green Train Maintenance Week. EOOS indicates 'Minimal Risk.'
Event No. Malf. No. Event Type* Event Description 1  XRCCHAPCNT I (CBOR)  Control Channel "A" Pressurizer Pressure fails HIGH.
2  XSPUPFAIL C (CBOR) Loss of Safety Parameter Display System (SPDS)
Update 3  XFW2TE0361 I (CBOT) Common MFP lube oil supply temperature transmitter, 2TE
-0361, fails LOW (fails 2TIC
-5283 closed). 4  RCP2P32BLOW RCP2P32BMID R (CBOR) N (ALL) RCP 2P32B Lower and Middle Seal failures; Requiring a plant shutdown.
5  RCP2P32BUPP C (CBOR) RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP.
6  RCSLOCATCB M (ALL) Loss of Coolant Accident after Reactor trip due to vapor seal l eakage. 7  HPI2P89AFAL C (CBOT) 'A' HPSI pump fails to auto start due to faulty ESF relay. 8  416_2A406  C (CBOT) 'B' HPSI pump fails to start due to breaker fault.
*  (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
 
Appendix D Operator Actions Form ES D2 Page 2 of 16 SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power and steady state.  'B'
 
vacuum pump is tagged out for maintenance.
The in-service Pressurizer (PZR) control channel pressure instrument will fail high.
Alarms on Pressurizer Control Channel 1 pressure HI and Pressure HI HI will come in. This will result in BOTH PZR spray valves opening, the backup heaters to deenergize, the proportional heaters to go to minimum fire and actual PZR pressure
 
to drop. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR may take both PZR spray valves to manual and close them. The CBOR may take the Backup heaters to ON to raise PZR pressure. 
 
The CBOR will verify that the other pressure control chan nel is reading correctly and select the channel 2 for control using 2HS
-4626. The CBOT will place SDBCS Master Controller in AUTO local and adjust setpoint to 1000 psia About two minutes into scenario, the SPDS computer will fail to update. The CBOR
 
wil l report that the SPDS is not updating. This will remain failed the rest of the scenario. Primarily the CBOR will be forced into using redundant indications since one of the SPDS CRT's is on 2C03 and the CBOR relies heavily on it for indications. 
 
The CBO T also will be forced to use redundant indications as one of the SPDS CRT is located on the upper part of 2C16. The CRS will notify maintenance and log the time SPDS is lost. This is a 1
-hour reportable event if SPDS cannot be restored (10CFR50.72).
Fiv e minutes into the scenario, 2TE0361 fails low. This will result in CCW isolation to the common MFP lube oil cooler. Temperature alarms will come in on supply temperature at 135&deg;F. The CRS will refer to ACA2203.012C that will direct
 
obtaining local lube oil temperatures from the AO. The CBOT will monitor MFP lube oil temperatures on 2TRS 0325 chart recorder located on 2C11. The CBOT will recognize that 2TIC
-5283, MFP Lube Oil Temp. Controller on 2C04 has zero output due to the temperature feed failing low. The CBOT will take manual control of 2TIC
-5283 to lower and control MFP lube oil temp using the PMS MFP screen and the AO to watch MFP lube oil temperature.
Approximately 15 minutes into the scenario, two seals on 'B' RCP will fail.
 
Annunciator 2K11
-G3, RCP Bleedoff flow HI/LO will alarm. The CBOT will verify using PMS and RCP chart recorder on 2C14 that the lower and middle seals have failed. The CRS will enter the RCP emergencies AOP, 2203.025 and direct the
 
board operator actions. The crew will perform a power reduction such that the plant will be off line in one hour. The CBOR will borate the RCS and reduce turbine load to maintain Tave
-Tref within 2&deg;F. The CBOT will make preparations to remove secondary plant equipment out of service as power is reduced.
 
Appendix D Operator Actions Form ES D2 Page 3 of 16 SCENARIO #1 NARRATIVE
 
When the lead examiner is ready, the third seal will fail on 'B' RCP. When the crew
 
recognizes the failure the CRS will direct a manual Reactor trip and securing of 'B'
 
RCP. The Crew will complete SPTA' s when the reactor is tripped.
On the Reactor trip, the vapor seal on 'B' RCP will fail resulting in a 400 gpm LOCA ramped over 5 minutes. The crew will manually actuate SIAS and CCAS when
 
pressure is observed to be trending towards the trip setpoint of 1 650 psia. The CBOR will secure one RCP in each loop when RCS pressure reaches 1400 psia.
When SIAS is manually actuated, the 'A' HPSI pump will fail to automatically start.
 
The CBOT will recognize the 'A' HPSI pump not starting (annunciator will alarm) an d manually start the pump (with direction from the CRS). Also when SIAS is manually actuated, the 'B' HPSI pump will fail due to a breaker fault (annunciator will alarm). 
 
The CBOT will place 'B' HPSI pump in PTL and start 'C' HPSI pump.
After SPTA's ar e complete, the CRS will diagnose a LOCA and enter the LOCA EOP 2202.003. The CRS will direct the CBOR to cooldown the RCS. The CBOR will cooldown the RCS using the SDBCS bypass valves to the condenser and plot
 
and record the cooldown using standard atta chments 1 and 8. When HPSI termination criteria is met, the crew will secure one HPSI pump and throttle the opposite loop HPSI injection MOV's to maintain PZR level. The scenario may be
 
terminated at the lead examiner's discretion.
 
Appendix D Operator Actions Form ES D2
 
Page 4 of 16 Simulator Instructions for Scenario 1 Reset to 100% power MOL IC.
Triggers T1, T3, T4, T5 set to false.
Conditional trigger T2 set to r eactor trip.
Place Green train maintenance week sign in simulator.
Place Minimal Risk sign in simulator.
Align 'C' HPSI to Green Train and in PTL.
PZR Pressure control hand
-switch 2HS
-4626 in Channel A.
'B' Vacuum pump tagged out. Handswitch on 2C01 in PTL. Overide for Green light (2HS
-0696-4) set to FALSE. Override for handswitch in PTL (2HS
-0696) set to TRUE. Override for Seal Water Pump Green light (2CI
-P31B) FALSE.
Event No. Malf. No. Value/ Ramp Time Event Description 1 XRCCHAPCNT Trigger=T1 2500 Control Channel "A" Pressurizer Pressure fails HIGH. 2 XSPUPFAIL Trigger = T1 Insert 2 min TD Loss of Safety Parameter Display System (SPDS)
Update  3 XFW2TE0361 Trigger = T3 0  Common MFP Lube Oil Supply Temperature Transmitter, 2TE
-0361, fails LOW (fai ls 2TIC-5283 closed). 4 RCP2P32BLOW RCP2P32BMID Trigger = T4 100 3 min TD RCP 2P32B Lower and Middle Seal failures:
Requiring a plant shutdown.
5 RCP2P32BUPP Trigger = T5 100 RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP. 6 RCSLOCATCB Trigger = T2 400 gpm 5 min Ramp Loss of Coolant Accident after Reactor trip due to vapor seal leakage.
7 HPI2P89AFAL True  'A' HPSI pump fails to auto start due to faulty ESF relay. 8 416_2A406  2HS-5079-2_w Locked OPEN True 'B' HPSI pump fails due to breaker fault.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event No.:  1                                Page  5 of 16 Event
 
== Description:==
Control Channel "A" Pressurizer Pressure fails HIGH..
Time Position Applic ant's Actions or Behavior CBOR Announce annunciator 2K10
-E6 Pressurizer Pressure Control Channel 1 Pressure HI / LO.
Report both Pressurizer spray valves open and actual pressurizer pressure dropping.
CRS Refer to PZR Systems Malfunctions AOP 2203.02 8 and direct board operators actions.
Refer to TS 3.2.8 if pressure not 2025 to 2275 psia.
CBOR Compare channels and determine Channel 1 failed low.
Control backup heaters manually to maintain pressure > 2100 psia.
Place PZR Pressure Channel Select swi tch (2HS-4626) to channel 2.
Verify PZR spray valves closed.
Restore backup heaters to automatic control.
CBOT Place SDBCS Master controller in AUTO local and adjust setpoint to 1000 psia.
Termination Criteria:  PZR Pressure Control selected to Channel 2 in auto control or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event No.:  2                                Page  6 of 16 Event
 
== Description:==
Loss of the Safety Parameter Display (SPDS) Update.
Time P osition Applicant's Actions or Behavior CBOR Announce the loss of the SPDS computer to the CRS
 
CRS Logs the failure of the SPDS.
CRS Direct the CBOR/CBOT to use the other means of monitoring plant parameters.
CBOR CBO T Monitors the plant and provides information from other panel indications.
CRS Inform SM:
&#xa8; To Contact maintenance (CSG), &#xa8; That it is a 1
-hour reportable occurrence if it cannot be restarted within 1 hour. (10CFR50.72(b) (1) (v) and ANO procedure 2105.014 , SPDS.
Termination criteria: SPDS is logged out of service, maintenance is contacted (CSG) and SM informed of loss of SPDS or at the examiner's discretion (NOTE: this condition will remain throughout the rest of the
 
scenario).
 
Appendix D Operator Actions Form ES D2
 
Op-Test No.:  1 Scenario No.:  3        Event No.:  3                                Page  7 of 16 Event
 
== Description:==
Common MFP Lube Oil Supply Temperature Transmitter, 2TE
-0361, fails LOW (fails 2TIC
-5283 closed).
Time Position Applicant's Actions or Be havior  CBOT Announce annunciators:
2K03-E8/E11 Turbine bearing Metal Temperature High.
2K03-D8/D11 Turbine Bearing Oil Temperature High.
CRS Implement Annunciator Corrective Action AOP 2203.012C
. NOTE:  When contacted by control room as AO, report t hat local MFP bearing temperatures to 'A' MFP (2TI2611A) and 'B' MFP (2TI2611B) are trending up are reading the value obtained from instructor's area qume (IEW CCT2E22).
CBOT Report that 2TE
-0374('A' MFP) and 2TE
-0371('B' MFP) are > 135&deg;F and trending up. Also Report that bearing metal temperatures are also trending up.
CBOT Report that MFP Lube Oil TEMP Controller (2TIC
-5283) has zero output. Take manual control of controller and control MFP lube oil temperature < 135&deg;F.
CBOT  Report that PMS point T0361 has failed low. (P&ID M
-2216 sh2, E7
& M-2234 sh 1, G
-2)  Termination Criteria: When MFP Lube Oil controller is in manual and controlling MFP lube oil temperature or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event N o.:  4                              Page  8 of 16 Event
 
== Description:==
RCP 2P32B Lower and Middle Seal failures requiring a plant shutdown.
Time Position Applicant's Actions or Behavior CBOR Announce alarm 2K11
-G3 RCP BLEEDOFF FLOW HI/LO.
Re port lower seal failure on "B" RCP.
CRS Refer to RCP Emergencies AOP 2203.025 and direct board operator actions.
CBOR CBOT Monitor RCP seals for further degradation.
Report middle seal failure on "B" RCP.
CRS Setup contingency to trip reactor and RCP if upper seal fails.
Refer to OP 2102.004 Power Operations and commence a plant shutdown. Notify NLOs, Management, Dispatcher, Chemist, and Nuclear Eng.
CBOR Commence boration ~ 20 gpm.
Maintain ASI
-0.20 to +0.20 with Group 6 or P CEAs.
CBOT Red uce main turbine load to maintain Tave within 2
&deg; F of Tref.
Termination criteria: Plant shutdown in progress or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event No. 5, 6 , 7 & 8                      Page 9 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CBOR Announce Upper Seal failure on "B" RCP (third seal).
Manually trip reactor.
Secure 'B' RCP and place associated spray valve in MANUAL and closed. CRS Implement Standard Pos t Trip Actions, 2202.001 Notify operators to monitor Exhibit 7 CBO Reactor Trip Checklist, track safety functions, and direct board operator actions.
CBOR Check reactivity control:
Reactor power decreasing.
All CEAs inserted.
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
Both 4160v and 6900 v non
-vital buses energized.
Both 4160v and 480v vital AC bus energized.
Both 125v vital DC bus energized.
CBOR Check inventory control:
PZR level 10 to 80%. Trend from setpoint.
RCS MTS > 30&deg;F Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.: 1      Scenario No.:  1      Event No. 5, 6 , 7 & 8                      Page  10 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Re actor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavio r 
 
CT    CBOR Check RCS pressure control:
RCS pressure 1800 to 2250 psia.
Trend from setpoint Verify SIAS when pressure less than 1650 psia.
Trip one RCP in each loop when pressure less than 1400 psia. (may not be done until LOCA procedure)
Place s pray valve for secured RCP in manual closed.
Secure ALL RCPs if NPSH requirements violated.
CBOR Check core heat removal by forced circulation:
RCP status Loop D T less than 10
&deg; F. RCS MTS 30
&deg; F or greater.
Component cooling water aligned to RCPs.
Servi ce water not aligned to CCW.
CBOT Restore SW to CCW using Exhibit 5.
CBOT or CBOR Check RCS Heat Removal:
Report SG levels.
MFW in RTO (Reactor Trip Override).
Report feedwater line intact.
Report SG pressures.
CBOR Report RCS Tc 540 to 555
&deg;F.
Appendix D Operator Actions Form ES D2 C ontinue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event No. 5, 6 , 7 & 8                    Page  11 of 16 Event
 
== Description:==
R CP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coo lant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:
Temperature les s than 140
&deg; F and trending up.
Pressure less than 16 psia and trending up.
CNTMT Spray Pumps secured.
Status of radiation alarms:
CAMS (2K10
-B6)  In alarm Area radiation (2K11
-B10) in alarm.
Process liquid (2K11
-C10)  Report trends on radia tion monitors increasing.
Status of SEC SYS RADIATION HI (2K11
-A10)  Report trends on secondary system radiation monitors stable.
CRS Notify SM to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Spec s and EALs.
Tech Specs 3.0.3, 3.6.3.1 and in Alert Emergency Class CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Diagnose Loss of Coolant Accident EOP 2202.003.
CRS Implement Loss of Coolant ORP, op en place keeping page, and direct board operators' actions.
CRS Perform crew brief and review floating steps.
CRS Contact chemistry to sample SG for activity Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1    Event No. 5, 6 , 7 & 8 Page 12 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto st art due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CBOR Verify SIAS and CCAS actuated on PPS inserts.
CBOT Verify CCW aligned to RCPs (Floating Step)
CT    CBOR Check RCS pressure greater than 1400 psia. (Floating Step)
* Secure one RCP in loop 2 (if not done in SPTA's).
* Secure ALL RCPs if MTS <30
&deg;F. CBOT Restore ESF/Non
-ESF systems:  (Floating step)
* Verify at least one SW pump running in each loop.
* Verify DG SW outlet valves open.
* Verify SW suction aligned to Lake.
* Check 4160v Non
-vital buses energized from offsite power.
* Check 4160v Vital buses energized from offsite power.
* Start SW pumps as needed to maintain header pressure.
* Restore SW to ACW per Exhibit 5.
* Maintain SW header gr eater than 85 psig.
Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1      Event No. 5, 6 , 7 & 8                      Page 13 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CT CBOT Verify HPSI f low to RCS:
Report A HPSI  pump failure to auto start and manually start.
Report B HPSI Pump breaker trip. Manually start 'C' HPSI pump (Only one HPSI pump is required to be started).
CBOT Verify all CNTMT Cooling Fans running in emergency mode.
CBOT Verify SG levels greater than 22.2%.  (Floating Step)
CBOT Align Feedwater:
* Check EFW pump 2P7B running.
* Secure EFW pump 2P7A.
* Verify AFW pump 2P75 secured.
* Secure running MFW pump and close ALL FW blocks.
CBOT Verify CCW surge tank constant and CCW ra diation monitor trend stable. CBOR Check LOCA is limited to containment.
* Containment sump level going up.
* Containment temperature, humidity and pressure are going up.
* Auxiliary Building radiation levels steady.
* Auxiliary building sump is less than 53%.
* W aste tanks 2T20 A/B levels are steady.
Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1      Event No. 5, 6 , 7 & 8                      Page  14 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor t rip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CBO R Check CNTMT Isolation parameters.  (Floating Step)
CNTMT pressure exceeds 18.3 psia.
CNTMT RADIATION HI alarm 2K10
-A6 in alarm. Actuate CIAS and commence Attachment 5.
Verify ONE Penetration Room Ventilation Fan Running.
CBOR Check CNTMT pressure tren d not exceeded 23.3 psia. (Floating Step)
* Verify CSAS actuated on PPS inserts.
* Stop ALL RCPs, place spray valves in manual closed.
* Verify spray pumps running with greater than 1875 gpm each.
CBOT Terminate CNTMT Spray if conditions met.
CBOT Start bo th Hydrogen Analyzers per 2104.044.
CBOT Verify All available miscellaneous CNTMT ventilation running:
* CNTMT Bldg. Recirc fans (2VSF
-31A-D)
* Reactor Cavity fans (2VSF
-34A&B)
* Three CEDM Shroud Cooling fans (2VSF
-35s)  Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1      Event No. 5, 6 , 7 & 8                      Page  15 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip d ue to vapor seal leakage;  'A' HPSI pump fails to auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CBOT Check ALL AC and vital DC buses energized. (Floating Step)
CBOR Check IA pressure greater than 65 psig. (Floating Step)
CRS Check LOCA not isolated and proceed to Section 3 CBOR Perform controlled cooldown to 275
&deg;F.  (Float Step)
* Reset low PZR pressure and low SG pressure setpoints.
* Record and plot cooldown on Attachm ents 1 and 8.
Initiate cooldown using SDBCS bypass valves.
CBOT Check Condensate pump in service.
CBOT Maintain SG levels 45 to 90%.
Check CST level greater than 82%
CBOR Restore PZR level. (Floating Step)
Maintain 29% to 80%
CBOR Verify Natura l Circulation if RCPs secured:
* Loop D T less than 50
&deg; F.
* Thot and Tcold constant or lowering.
* RCS MTS 30
&deg; F or greater.
* D T between Thot and average CETs less than 10
&deg; F. Continue to next page
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1      Event No. 5, 6 , 7 & 8                      Page  16 of 16 Event
 
== Description:==
 
RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP
;  Loss of Coolant Accident after Reactor trip due to vapor seal leakage;  'A' HPSI pump fails t o auto start due to faulty ESF relay
;  'B' HPSI pump fails due to breaker fault.
Time Position Applicant's Actions or Behavior CRS Check that RCP restart criteria is NOT met.
CBOR Check RCS void free:
* PZR level stable using aux spray.
* RVLMS LVL 01 in dicates WET.
* Upper head thermocouples indicate subcooled.
CBOR Maintain RCS P
-T limits and RCP NPSH per Attachment 1.
Check uncontrolled RCS cooldown below 500
&deg; F Tcold has not occurred. CT CBOT CBOR Override HPSI when termination criteria met:  (Floa ting Step)
* RCS MTS 30
&deg; F or greater.
* PZR level greater than 29% and controlled.
* RVLMS LVL 03 or higher indicates WET.
* At least one SG available
- Level 10 to 90% with FW available OR level being restored with FW flow greater than 485 gpm.
Throttle HPSI flo w OR place HPSI pump in PTL as needed to control RCS pressure, inventory, and heat removal.
Termination criteria: Cooldown in progress with HPSI throttled or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Facility: ANO
-2                      Scenario No.:  2 (New)                          Op
-Test No.:  2003
-1 Page 1 of 13 Examiners:
Operators:
Initial Conditions:
70% and decreasing. Down Power commenced from 100% due to Rod Drop (CE A # 46). Azimuthal Tilt in Alarm and continuing power decrease.
Turnover:
Continue power decrease to 50% due to Azimuthal Tilt Alarm. Azimuthal Tilt has not cleared with the Power Reduction. CEA 46 dropped to bottom ~ 80 minutes ago and
 
has been re
-aligned with other CEA's in Group 6. Entered AOP 2203.003, CEA Malfunctions. Green Train Maintenance week. EOOS indicates 'Minimal Risk.'
Event No. Malf. No. Event Type* Event Description 1 CUED XSG2LT11311 I (CBOT)  Steam Generator "B" Safety Channe l Level Fails LOW. 2 T=0 POWER REDUCTION N (ALL) R (CBOR) Continue Power REDUCTION 3 T+10 From T1 XCVLDNHXOU I (CBOR)  Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW 4 T=0 CEA48STUCK Value = 80%
C(CBOR) Degraded Rod Motion for CEA 48 o n Controlling CEA Bank. This requires individual CEA adjustment to align the CEA with the CEA bank.
5 CUED EHLEAK (NEW) M(ALL) Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in
 
Manual/Automatic Reactor Trip. 6 RX TRIP MS1002 (Set to 0#)
M (ALL) Main Steam Safety Valve OPENS and Fails to CLOSE on "A" Steam Generator resulting in an ESD outside
 
Containment 7 EFAS  ESF1025 2CV10382_A C (CBOT) 'B' EFW isolation valves to 'A' SG fail to close, one automati cally and one with valve failure. This results in continued EFW Feed to Affected Steam Generator.
*  (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
 
Appendix D Operator Actions Form ES D2 Page 2 of 13 SCENARIO #2 NARRATIVE Simulator session begins with the plant at 70
% power and a power reduction in progress. Annunciator 2K10
-B2, TECH SPEC AZ TILT EXCEEDED and 2K10
-C2, CPC AZ TILT EXCEEDED are in alarm. Direction from Reactor Engineering has been given to continue reducing power to less than 50% in the next 30 minute s (40 minutes is the Tech Spec required time). The crew will enter OP 2102.004, Power Operations procedure, step 11.16, Power Reduction. The CBOR will start a power
 
reduction by RCS boration and lowering turbine load on the turbine load
 
potentiometer to maintain Tave
-Tref within 2&deg;F.
During the down power,Axial Shape Index (ASI) will become more negative; to
 
maintain ASI within .01 of Equilibrium Shape Index (ESI), Group 6 CEA's will need to
 
be inserted. As Group 6 CEAs are inserted, CEA 48 will lag be hind the other four CEA's in the group. Annunciators 2K04
-J5 CEAC #1 DEVIATION and 2K04
-J6, CEAC#2 Deviation (5") may alarm. PMS CEA Annunciator 2K10
-D1, CEA Minor Deviation (3") or 2K10
-C1, CEA Major Deviation (6") may also alarm. Manual Individual CED MCS operation will be needed to align CEA 48 with the rest of the group. When Reactivity manipulation completed and on lead examiner's cue, 2LT
-1131-1, safety channel for 'B' Steam Generator (SG) Level, will fail low. This will trip one of the four PPS trip channels for low SG level trip. Alarms for RPS Channel Trip/Pre
-trip and Channel 'A' Operator Insert (2C03) trip and pre
-trip lights will be lit. The CRS will refer to the ACA 2203.012D and Tech Specs 3.3.1.1, 3.3.2.1 and 3.3.3.5 for guidance. The CBOT will place Channel 'A' PPS in bypass for Point 8, LOW SG B Lvl, Point 10, HI SG B Lvl, and Point 20, SG B
?P for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the Tech Spec LCO.
Approximately 10 minutes after SG Level transmitter fails low, the Letdown Heat
 
Exchanger temperature transmitter, 2T IC-4815, fails low. This will cause the temperature controller to close and actual Letdown temperature to go up. With no operator action, the Letdown Radiation Monitor will be isolated, the Letdown
 
Demineralizer will be bypassed and the VCT temperature w ill rise. Annunciator 2K11-C1, Letdown HX 2E29 Outlet Temp Hi will alarm. CRS will refer to ACA for 2K11-C1 and direct actions. CBOR will evaluate 2HIC
-4815 and report that demand out of HIC is zero and temperature indicated is zero. CBOR or CBOT will look at PMS computer point T4805 and report that letdown temperature is above alarm set point. CBOR will place 2HIC
-4815 in manual and control CCW flow from the Letdown Heat Exchanger to maintain letdown temperature less than 140&deg;F. CRS will contact the WCO and ask flow on 2FIS
-5261, CCW flow out of Letdown Heat Exchanger. If letdown temperature exceeded 145&deg;F, letdown flow through the letdown radiation monitor must be manually restored.
 
Appendix D Operator Actions Form ES D2 Page 3 of 13 SCENARIO #2 NARRATIVE (Continued)
When cued by the lead examiner, an EH leak will start down stream of isolation valve 2EH-1A (on EH Pump Skid) on the common header. EH pressure will degrade to
~1300psig over the next 3 minutes. Annunciator 2K02
-A9, LOW EH Pressure, will alarm and the standby EH pump wil l automatically start. EH pressure will rise and then lower again as the leak worsens. Annunciator 2K02
-C10, EH Tank Low Level will alarm about 5 minutes after the start of the malfunction. The Main Turbine Generator will automatically trip at 1100 psig EH pressure. The Main Feed Pumps will automatically trip at 400 psig EH pressure. The crew will secure the EH pumps and the CRS will enter SPTA's.
Post reactor trip the Main Steam Safety Valve (2PSV
-1002) on 'A' SG will fail open resulting in an Excess Steam Demand (ESD) outside containment. Also, post EFAS, Emergency Feed Actuation Signal, 2CV
-1038-2, 'B' EFW Pump to 'A' SG will mechanically fail to close and 2CV
-1025-1, 'B' EFW Pump to 'A' SG will fail to close due to a stuck relay. This will result in severe overcooling of the RCS, if not corrected. The CBOT will override 2CV
-1025-1 and close.
 
Appendix D Operator Actions Form ES D2 Page 4 of 13 Simulator Instructions f or Scenario 2 Reset simulator to MOL 70% power IC normal system lineup.
Group 6 is inserted for ASI control.
Markup OP 2102.004, Power Operations up to step 11.16 for power reduction.
Place Green train maintenance week sign in simulator.
2K10-B2, Tech Spe c AZ Tilt Exceeded alarm in.
2K10-C2, CPC AZ Tilt Exceeded alarm in.
Triggers T1, T3, and T4 are set to False.
Conditional Trigger T2 is set to Reactor trip.
Conditional Trigger T5 is set to EFAS
-1. Event No. Malf. No. Value/ Ramp Time Event Description 1  XSG2LT11311 Trigger T1 0  Steam Generator "B" Safety Channel Level Fails LOW. 2  POWER REDUCTION  Continue Power REDUCTION 3  XCVLDNHXOU Trigger T3 50&deg;F  Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW 4  CEA48STUCK 80% Degraded Rod Motion for CEA 48 on Controlling CEA Bank. This requires individual CEA adjustment to align the CEA with the CEA bank.
5  EHLEAK Trigger T4 TRUE Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in
 
Man ual/Automatic Reactor Trip.
6  MS1002 Trigger T2 0 Ramp = 20 min. Main Steam Safety Valve OPENS and Fails to CLOSE on "A" Steam Generator resulting in an ESD
 
outside Containment 7  ESF1025  2CV10382_A 2HS-1038-2_R Trigger T5 TRUE  1.0 FALSE TD 20 sec.
'B' EFW isolation valves to 'A' SG fail to close. 2CV
-1025-1 fails to automatically CLOSE. 2CV
-1038-2 fails to CLOSE due to valve failure. This results in continued EFW Feed to AFFECTED Steam
 
Generator.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  2        Even t No.:  1                                Page  5 of 15 Event
 
== Description:==
 
Steam Generator "B" Safety Channel Level Fails LOW.
Time Position Applicant's Actions or Behavior CBOR Announce annunciators:
2K04-A4, CH A RPS/ESF/PRETRIP/TRIP 
 
2K04-B3, PPS Channel TRIP 2K12-K7, DEFAS Trouble CRS Implement Annunciator Corrective Action AOP 2203.012D.
CBOR Report B SG level low pretrip/t rip on 'A' PPS insert.
CBOT Compare all four channels and report 2LI
-1131-1 indicates zero.
CRS Inform SM to refer to Tech Spec 3.3.1.1 and 3.3.2.1 and  TRM 3.3.1.1. CBOT Place the following points in bypass on PPS Channel A:
LOW SG B Lvl (Point 8
) HI SG B Lvl (Point 10  )
SG B D P (Point 20)
CBOR Verify annunciator 2K04
-C3, PPS CHANNEL BYPASSED alarms.
Verify correct channels in bypass.
CRS Contact Maintenance/Work Week Manager.
Termination criteria: Affected points are placed in bypass or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  2        Event No.:  2                                Page  6 of 13 Event
 
== Description:==
Continue Power REDUCTION Time Position Applicant's Actions or Behavior ALL Crew will c onduct brief for power decrease.
CRS Implement normal operating procedure 2102.004, Power Operations, Section 11.0. (Step11.16)
Direct CBOR to borate to lower RCS temperature and adjust turbine load using load set potentiometer.
CBOR Commence RCS bor ation using OP 2104.003, Chemical Addition, Exhibit 3, Normal Boration At Power.
Verify Boric Acid Makeup Controller in Auto at desired flow rate.
Verify selected Boric Acid Pump in Normal
-After-Stop. Verify Mode Selector Switch (2HS
-4928) in BORATE.
Verif y 2CV-4830, Charging Pump Suction from Boric Acid, opens.
Verify selected Boric Acid Pump running.
Open associated Boric Acid Pump Recirc valve.
Depress red push button on Boric Acid Makeup Batch Controller, 2FIQS-4926 and verify it is set for proper quant ity. Verify 2FIC
-4926 indicates proper flow rate.
Monitor Tave and ASI.
Obtain PEER check.
CBOR Adjust turbine load to maintain reference temperature and RCS average temperature within two degrees.
Obtain PEER check.
CBOR Maintain ASI within 0.05 of po wer dependant ESI by withdrawing CEA's. Obtain PEER check and CRS permission to withdraw CEA's.
Termination criteria: Reactivity manipulation observed or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  2            Event No.:
3                          Page  7 of 11 Event
 
== Description:==
 
Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW.
Time Position Applicant's Actions or Behavior CBOR Announce Annunciator 2K12
-C1, Letdown HX 2E29 Outlet Temp HI Verify temperature 2TIS
-4815 is reading zero.
CRS Refer to ACA for 2K12
-C1 and direct Board Operator actions.
CBOR or CBOT Verify Computer point T4805 and 2C09 TIS
-4805 are reading greater than 140&deg;F.
CBOR Verify normal letdown flow.
NOTE: When contacted a s WCO, Report CCW flow rate based on approximate demand of 2TIC 4815. (Until manual control is initiated the flow rate is zero, the maximum flow rate is 1200 gpm.)
CRS Contact WCO to verify CCW flow through Letdown Heat Exchanger using 2FIS
-5261. CBOT Report CCW Loop II temperature from 2C14.
CBOR Report that 2TIC
-4815 is not controlling CCW flow in Automatic and take manual control of 2TIC
-4815 and raise CCW flow through the Letdown Heat Exchanger to maintain Letdown temperature less than 140&deg;F. CB OR If Letdown temperature went above 145&deg;F, then verify:
* That the Letdown To Ion Exchanger valve, 2CV
-4803, is in bypass
* That the Letdown To Radmonitor valve, 2CV
-4804, is closed.
CBOR When Letdown temperature drops below 140&deg;F, then verify:
* That the Let down To Ion Exchanger valve, 2CV
-4803, is NOT in bypass
* Take the Letdown to Radmonitor valve, 2CV
-4804, closed then open.
CRS Contact Maintenance / Work Week Manager.
Termination criteria:  Letdown Heat Exchanger temperature controller, 2TIC
-4815 is in manual and controlling Letdown temperature less than 140&deg;F.
 
Appendix D Operator Actions Form ES D2
 
Op-Test No.:  1      Scenario No.:  2        Event No.:  4                                Page  8 of 13 Event
 
== Description:==
Degraded Rod Motion for CEA 48 on Controlling CEA Bank
. Time Position Applicant's Actions or Behavior CBOR Announce CEA 48 position indication deviating from rest of bank:
* CEAC 1 or 2 indication
* Announce Annunciator 2K04
-J5, CEAC #1 Deviation and 2K04-J6, CEAC#2 Deviation alarms. Report 5" deviation.
* An nounce PMS CEA Annunciator 2K10
-D1, CEA Minor Deviation. Report 3" deviation.
* Announce Annunciator 2K10
-C1, CEA Major Deviation alarm. Report 6" deviation.
CRS Direct Manual Individual CEDMCS operation to align CEA 48 with the rest of the group.
C BOR Align CEA 48 with rest of group by Manual Individual operation of CEDMCS and insert CEA 48 until it is aligned with the other four
 
CEA's in Group 6.
Obtain PEER Check.
NOTE: This evolution may occur more than once during the scenario. It is dependant on the magnitude of power reduction.
Termination Criteria: Event may be terminated when CEA 48 is aligned with the rest of the CEA's in Group 6 or at the discretion of the lead examiner.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  2        Event No.:  5 Page  9 of 13 Event
 
== Description:==
Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in Manual/Automatic Reactor Trip.
Time Position Applicant's Actions or Behavior CBOT Report Annunciators 2K02
-A9, EH Header Press LO and 2K02-B9, EH Pump 2P14A/B Auto Start are in alarm and report that Standby EH Pump 2P14B automatically started.
CRS Refer to ACA for 2K02
-A9 and direct actions.
CBOT Report EH pressure is less t han 1300 psig and lowering.
NOTE: When contacted by CRS, report that EH fluid is spraying into EH pit area from a break on the common EH discharge header down stream of isolation
 
valve 2EH-1A and is a large leak.
CRS Direct AO to investigate EH system.
CBOT Report Annunciator 2K02
-C10, EH Tank 2T38 Level Hi/LO is in alarm. CRS Refer to ACA for Annunciator 2K02
-C10, EH Tank 2T38 Level Hi/LO and direct actions.
CBOT Monitor EH pressure and report that pressure is approaching Main Turbine Generator (M TG) trip set point and recommend manually tripping the plant.
CBOT Report that the MTG is tripped.
CRS Direct CBOR to manual trip the reactor.
CBOR Manually trip the reactor.
CBOT Place both EH pumps in PTL.
Manually trip the MFP's or report that they have tripped on low EH pressure.
Termination Criteria: Event may be terminated when the reactor is tripped.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  2        Event No.: 6 and 7                          Page  10 of 13 Event
 
== Description:==
On reactor trip one MSSV on 'A' SG, 2PSV
-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV
-1038-2 and 2CV-1025-1 will not close. Implement SPTA's and diagnose event.
Time Position Applicant's Actions or Behavior CREW A nnounce reactor trip.
CRS Implement 2202.001, Standard Post Trip Actions, track safety functions, and direct board operator actions.
CRS Direct crew to use Exhibit 7, CBO Reactor Trip Checklist, track safety functions, and that the CRS has control of a nnunciator horn during moment of silence.
CRS Directs crew to take control of annunciator horns and implement SPTA's.
CBOR  Check reactivity control:
Report reactor power lowering.
Report all CEA's are inserted.
CBOT Check maintenance of vital aux iliaries: Report main turbine tripped.
Report generator output and exciter breakers open.
Report both 4160vac and 6900vac non
-vital buses energized form S/U #3. Report both 4160v and 480v vital AC bus energized from S/U #3.
Report both 125v vital DC bus en ergized. CBOR Check inventory control:
Report PZR level 10 to 80%.
Report PZR level NOT trending to setpoint.
Report RCS MTS greater than 30 &deg;F Event 6&7 Continued.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  1        Event No.:  6 & 7 Page  11 of 13 Event
 
== Description:==
On reactor trip one MSSV on 'A' SG, 2PSV
-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV
-1038-2 and 2CV-1025-1 will not close.
Implement SPTA's and diagnose and m itigate event.
Time Position Applicant's Actions or Behavior CBOR Check RCS pressure control:
Report RCS pressure 1800 to 2250 psia. May be lower than 1800 due to the RCS cooldown.
CBOR Check core heat removal by forced circulation:
Report RCP's are running. Report CCW is aligned to RCP's.
Report SW is aligned to CCW.
CBOT Check RCS Heat Removal:
Report SG levels are lowering.
Report all condensate pumps are secured.
Report both MFW pumps are secured.
Manually actuate EFAS, if not already actuated
. Report that a SG safety valve is open and depressurizing the SG.
Manually actuate MSIS or announce that MSIS has been automatically actuated.
CRS can direct the CBOT to setup to maintain post SG lowdown RCS temperature using upstream ADV on 'B' SG.
C BOR Report RCS Tc 540 to 555
&deg;F and slowly lowering.
CT CBOT Close 2CV-1025-1 by overriding EFAS actuation or secure 2P7B, Motor Driven EFWP to secure feeding the AFFECTED SG.
Event 6&7 Continued.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1      Scenario No.:  2        Event N o.:  6 & 7                          Page  12 of 13 Event
 
== Description:==
On reactor trip, one MSSV on 'A' SG, 2PSV
-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV
-1038-2 and 2CV-1025-1 will not close.
Impl ement SPTA's and diagnose event.
Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:
Report temperature less than 140
&deg; F. Report pressure less than 16 psia.
Report containment spray pumps secured.
Report status of radiation alar ms:      CAMS (2K10
-B6) not in alarm Area radiation (2K11
-B10) not in alarm Process liquid (2K11
-C10) not in alarm Report stable trends on radiation monitors.
Report SEC SYS RADIATION HI (2K11
-A10) not in alarm.
Report stable trends on secondary system radiation monitors.
CRS Notify SE to report to control room.
Announce reactor trip on plant page.
Notify SM to refer to Tech Specs and EALs. 
(3.7.1.2 EFW valve failure  and NUE
- 3.1, Uncontrolled depressurization of secondary that results in MSIS actuation)
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Notify crew of status of Safety functions.
Diagnose EXCESS STEAM DEMAND event on 'A' SG.
Conduct crew brief.
Event 6 & 7 Continued.
 
Appendix D Operator Actions Form ES D2
 
Op-Test No.:  1      Scenario No.:  2        Event No.:  6 & 7                            Page  13 of 13 Event
 
== Description:==
On reactor trip, one MSSV on 'A' SG, 2PSV
-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to '
A' SG, 2CV
-1038-2 and 2CV-1025-1 will not close.
Implement SPTA's and diagnose event.
Time Position Applicant's Actions or Behavior CRS Implement EXCESS STEAM DEMAND Event EOP 2202.006.
Direct board operators in performing the below actions.
CBOR Ver ify one RCP in each loop if RCS pressure drops less than 1400 psia and associated spray valve in manual and closed.
CT CBOT Maintain Post SG Blowdown RCS temperature and pressure less than 200&deg;F margin to saturation by steaming the 'B' SG using the Upstre am Atmospheric Dump Valve.
CT CBOR Maintain Post SG Blowdown RCS temperature and pressure less than 200&deg;F margin to saturation by controlling RCS pressure using Normal Spray or Auxiliary Spray.
CBOR CBOT Maintain PZR level by overriding HPSI.
Event Termination:  RCS temperature is maintained using Upstream ADV on 'B' SG and RCS pressure is maintained using Normal or Auxiliary Spray or at the discretion of the lead examiner.
 
Appendix D Operator Actions Form ES D2 Facility: ANO
-2                        Scenario No.:  3                                    Op
-Test No.:  2003
-1 Page 1 of 12 Examiners:
Operators:
Initial Conditions:
100% MOL; Thunderstorm Watch for Pope and Conway counties.
Tu rnover:: National Weather service has issued a Thunderstorm Watch for Pope and Conway Counties until 8:00 pm today. AOP 2203.008, Natural Emergencies, Section 3, Tornado, steps 1 and 2 have been completed. Call 890
-4987 for weather updates.
Event No. Mal f. No. Event Type* Event Description 1 500BRK5106 500BRK5110 N (ALL)  R (CBOR) Mabelvale 500KV line failure. Site must reduce load to 1250MW total net generation. Unit One will
 
reduce turbine load to 350MW. Unit 2 will reduce
 
turbine load to 900 MW in 15 minutes.
2 CUED XRCCHAPLVL I (CBOR) 'A' Pressurizer Level Control Channel fails LOW.
3 10 Min after event 2 CVC2P36BFAL C (CBOR) 'B' CCP breaker trip.
4 CUED RCSPZSTMLK RPSRXAUTO RPSRXMAN RPSDSSAUTO
 
RPSDSSMAN M (ALL)  PZR Steam Space leak.
RPS/DSS fail to manually and automatically trip.
Open feeder breakers to MG sets.
5 TRIP CEA52STUCK C (CBOR) Stuck CEA # 52 on Reactor trip.
6 EFAS MFWPMPATRP 2CV-0332 EFW2P7BESF C (CBOT) 'A' MFP trip.
'A' EFW pump over speed trip on startup.
'B' EFW pump fail s to auto start.
7 CUED 416_2A306  C (CBOT) 'A' HPSI trip after verification.
 
Appendix D Operator Actions Form ES D2
  *  (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
 
Appendix D Operator Actions Form ES D2 Page 2 of 12 SCENARIO #3 NARRATIVE When crew takes the watch, the Systems Dispatcher will call the Control Room and report that the 500 KV line to Mabelvale has failed and the ANO site output must be reduced to less than 1250 MW within 15 minutes. Unit 2 must reduce load to 900
 
MW gross output within 15 minutes. The CRS will enter Attachment 'H' of O P 2102.004, Power Operations, and direct the CBOR to borate and reduce turbine load to maintain Tave
-Tref within 2&deg;F.
After the CBOR has completed the required reactivity manipulation, the in
-service Pressurizer (PZR) Control Channel Level instrument wil l fail low.
Alarms on Control Channel 1 Level LO and Level LO LO will come in. This will result in Letdown going to minimum flow, the two backup CCP's will automatically start, all PZR heaters will
 
de-energize and actual PZR level will go up. AOP 2203.0 18, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the Letdown Flow Controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR Low Level Cutoff switch to the unaffected channel.
When the auto and manual signals are matched, the CBOR will place the Letdown
 
Flow Controller to automatic. The CRS will determine that TS 3.3.3.5 and 3.3.3.6
 
a re applicable.
Approximately 10 minutes after the PZR Level Control Channel fails low, 'B' CCP
 
breaker will trip. The CRS will enter the Loss Of Charging AOP. The crew will
 
determine that the CCP breaker tripped and start a backup CCP. Letdown may
 
isol ate on high Regen Heat Exchanger temperature, depending on the promptness of starting the Backup CCP. If letdown isolated, then, letdown will be restored using 2104.002, CVCS.
When Charging and Letdown have been restored, a PZR Steam Space leak in
 
excess of PZR heaters capacity to maintain pressure will begin. PZR pressure will drop rapidly and the crew will manually trip the reactor. Both the RPS and DSS manual and auto pushbuttons will fail to actuate a reactor trip. The CRS will direct
 
the CBOT to o pen the feeder breakers to the MG sets, 2B712 and 2B812. CRS will identify 3.0.3 applicability due to the failure of all manual trip pushbuttons. When the reactor is tripped, one CEA will fail to insert requiring the CBOR to perform Exhibit 1, Emergency Boration. The CRS will enter Standard Post Trip Actions and determine safety function status and diagnose a LOCA. During SPTA's the crew will verify SIAS, CCAS actuations. The Crew will secure ALL RCP's when Margin to
 
Saturation conditions are reached.
When RCS Heat removal safety function is evaluated, EFW will be manually actuated due to the trip of 'A' MFP. Upon EFAS Appendix D Operator Actions Form ES D2 actuation 'A' EFW pump will overspeed trip and 'B' EFW pump will fail to auto start.
The CBOT will manually start 'B' EFW pump.
Page 3 of 12 SCENARIO #3 NARRATIVE (continued)
 
After SIAS has been verified to be operating correctly, 'A' HPSI pump will trip. The
 
CBOT will place the handswitch for 'A' HPSI in PTL and manually start 'B' HPSI
 
pump. The crew will complete the entry sectio n for LOCA procedure and determine that the LOCA is an unisolated event and the CRS will implement Section 3 of the LOCA procedure. The crew will start an RCS cooldown to SDC.
 
Appendix D Operator Actions Form ES D2 Simulator Instructions for Scenario 3 Page 4 of 12 Reset simulator to MOL 1 00% power IC.
Align swing pumps (HPSI and SW) to the Red train, except for Charging.
Markup AOP 2203.008, Natural Emergencies Section 3, Tornado steps 1 & 2.
Ensure that AACG is secured and annunciators clear.
'B' CCP is selected as lead pump.
Place MINIMA L RISK and Green Train Maintenance Week signs on 2C100.
T1, T3, T4, T5, T7 set to false.
T2 set to RXTRP; T6 set to EFAS 1.
Event No. Malf. No. Value/ Ramp Time Event Description 1 500BKR5106 500BKR5110 Trigger = T1 TRUE  Mabelvale distribution line fail ure. 2 XRCCHAPLVL Trigger = T3 0 'A' Pressurizer Level Control Channel fails LOW.
3 CVC2P36BFAL Trigger = T4 TRUE 'B' CCP breaker trip.
4 RCSPZSTMLK Trigger = T5 RPSRXAUTO RPSRXMAN RPSDSSAUTO
 
RPSDSSMAN TRUE 50 Ramp = 5 min. PZR Steam Space Leak RPS/DSS fail to manually and automatically trip. Open feeder breakers to MG sets.
5 CEA52STUCK 0 Stuck CEA 52 on Reactor trip.
6  MFWPMPATRP Trigger T2 2CV-0332 EFW2P7BESF Trigger T6 TRUE  0 TRUE 'A' MFP trip.
  'A' EFW pump over speed trip on startup
. 'B' EFW pump fails to auto start.
7 416_2A306 LCK-OP 'A' HPSI pump trips after verification and entry into LOCA EOP.
Appendix D Operator Actions Form ES D2 Trigger = T7 OP LOCA EOP. Op-Test No.:  1 Scenario No.:  3          Event No.:  1                  Page 6 of 15 2    Event
 
== Description:==
Mabelvale distribution line failure.
Time Position Applicant's Actions or Behavior Simulator operator's cue:  When directed by lead examiner; call the CRS as the System Dis patcher with the following direction:
"The 500KV line to Mabelvale has been damaged and ANO's net generation must be reduced to 1250KW within the next 15 minutes. Unit One will reduce load to 350 MW and Unit Two will
 
reduce load to 900 MW gross output."
ALL Crew will conduct brief for RAPID power reduction to net Unit 2 Generation of 900 MW.
CRS Implement normal operating procedure 2102.004, Power Operations Section 11.0, Power Reduction and refer to Attachment 'H' for rapid
 
power reduction.
CBOR Com mence RCS Boration using OP 2104.003, Chemical Addition, Exhibit 3, Normal Boration At Power.
Verify Boric Acid Makeup Controller in Auto at desired flow rate.
Verify selected Boric Acid Pump in Normal
-After-Stop. Verify Mode Selector Switch (2HS
-4928) in BORATE. Verify 2CV
-4830, Charging Pump Suction from Boric Acid, opens.
Verify selected Boric Acid Pump running.
Open associated Boric Acid Pump Recirc valve.
Depress red push button on Boric Acid Makeup Batch Controller, 2FIQS-4926 and verify it is set for proper quantity.
Verify 2FIC
-4926 indicates proper flow rate.
Monitor Tave and ASI.
Obtain PEER checks.
CBOR Adjust turbine load to maintain reference temperature and RCS average temperature within two degrees.
Obtain PEER checks.
CBOR Maintain ASI wi thin 0.05 of power dependant ESI by inserting CEA's.
Obtain PEER checks and CRS permission to withdraw CEA's.
Termination criteria: ~150 MW reduction and Reactivity manipulation observed or at Appendix D Operator Actions Form ES D2 examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scen ario No.:  3          Event No.:  2                  Page 8 of 15 2    Event
 
== Description:==
'A' Pressurizer Level Control Channel fails LOW.
CBOR Announce alarms 2K10
-G6 CNTRL C H 1 LEVEL LO.
2K10
-F6 CNTRL CH 1 LEVEL LO LO.
Report 2LI
-4627-2 and 2LR-4625 indicate normal.
Report backup Charging Pumps started. 
 
CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.
CBOR Determine PZR Level Channel A failed.
Place Letdown Flow Controller (2HIC
-4817) in MANUAL.
Place PZR Level Channel Select switch (2HS
-4628) to Channel B.
Place PZR Low Low Level Cutoff select switch (2HS
-4642) to Channel B. Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.
The CBOR will take the Letdown Flow Controller to AUTO when AUTO and MANUAL signals match.
CRS Inform SM to refer to TS 3.3.3.6 Post Accident Instrumentation.
Terminatio n criteria: Unaffected PZR Level Channel selected and Letdown in automatic or at examiner's discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  3                  Page 9 of 15 2    Event
 
== Description:==
2P36B, 'B' CCP breaker trip.
Time Position Applicant's Actions or Behavior CBOR Announce annunciator 2K12
-B3 CHARGING HEADER FLOW LO Verify that Charging flow indicates zero.
CRS Implement Loss of C harging AOP 2203.036 and direct board operator actions. CBOR Verify suction and discharge flow path.
Verify Charging Header Isolation valve 2CV
-4840-2 OPEN. Verify that 'B' CCP Breaker is tripped (RED and GREEN Lights out)
CBOR Start Backup CCP.
Verify proper operation of CCP (Flow, Pressure and Temperature)
CRS Contact WCO to locally check 'B' CCP for gas binding.
Simulator Operator Cue:
When contacted to check for gas binding, report that 'B' CCP venting complete and no gas was observed.
CBOR Res tores Letdown System to operation using OP 2104.002, Chemical and Volume Control, Section 9.2 Restoring Letdown After Temporary Isolation (if isolated on high Regenerative HX Outlet Temperature
 
previously).
Termination criteria: CVCS restored to operation , or at examiners discretion.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  4                        Page 10 of 15 2          Event
 
== Description:==
 
Pressuri zer Steam Space Leak and failure of RPS and DSS to Automatically or Manually actuate.
Time Position Applicant's Actions or Behavior CBOR Announce the following:
* PZR pressure dropping rapidly.
* ALL PZR heaters are energized.
* Containment temperature and pressure are rising.
CRS Verify that leak is from the PZR and not a Main Steam Line Break by comparing Tave, Steam/Feed Flows, PZR Pressure and PZR Level.
Direct CBO's to manually trip the reactor.
CBOR Attempt Manual Reactor Trip pushbuttons on 2C03 , Attempt Manual DSS pushbutton on 2C03, Attempt Manual Reactor trip pushbuttons on 2C14. C CBOT Open Breakers 2B712 and 2B812 and reclose after 10 seconds.
CRS Direct board operators to verify Safety Functions using Exhibit 7.
CRS Identify 3.0.3 applicability.
Termination criteria: Reactor tripped or at discretion of Lead Examiner.
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  4, 5, 6 and 7        Page 11 of 15 2    Event
 
== Description:==
Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.
Time Position Applicant's Actions or Behavior CRS Implement SPTA's and direct contingency actions.
CBOR Check reactivity control:
Reactor power decreasing.
Identify CEA 52 stuck out.
Emergency Boration in progress (SIAS will actuate/ CBOR will verify 40 gpm Charging Flow and BAM pumps started and Emergency
 
Borate valve is open)
CBOT Check maintenance of vital auxiliaries:
Main turbine tripped.
Generator output and exciter breakers open.
All 4160v and 6900 v Non
-Vital busses energized.
ALL 4160v and 480v vital AC bus energized.
All 125v vital DC bus energized.
CBOR Check inventory control:
PZR level 16 to 80%.
Trend from setpoint.
Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.
C CBOR Check RCS pressure control:
RCS pressure 1800 to 2300 psia.
Trend from setpoint Secure Two RCP's when RCS pres sure is less than 1400 psia or ALL RCP's when MTS is lost.
Place spray valve for secured RCPs in manual closed.
Verify SIAS when pressure less than 1650 psia.
Termination criteria:  RCP's secured, RCS Cooldown in progress, EFW pump started or at lead exa miner's discretion. (continued on next page)
 
Appendix D Operator Actions Form ES D2
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  4, 5, 6 and 7        Page 13 of 15 2    Event
 
== Description:==
Pre ssurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.
Time Position Applicant's Actions or Behavior CBOR Check core heat removal by forced circulation:
Two RCP 's running (if all are secured no further actions are taken)
Loop D T less than 10
&deg; F. RCS MTS 30
&deg; F or greater.
Service Water Pump suction aligned to Lake.
Component Cooling Water aligned to RCPs.
CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)
Check SIAS act uated. Maintain SW pressure greater than 85 psig.
(If all RCPs are secured, above actions are not taken until LOCA procedure)
CBOT Check RCS Heat Removal:
Report SG levels and method of feed.
Manually actuate EFW.
Announce 'A' EFW pump overspeed trip.
Manually start 'B' EFW pump.
Report feedwater line intact.
Report SG pressures.
CBOR RCS Tcold 540 to 555
&deg; F. Termination criteria:  RCP's secured, RCS Cooldown in progress, EFW pump started or at lead examiner's discretion. (continued)
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  4, 5, 6 and 7        Page 14 of 15 2    Event
 
== Description:==
Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & '
B' EFW pump failures, 'A' HPSI pump failure.
Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:
Temperature trending up.
Pressure trending up.
Status of radiation alarms:
CAMS (2K10
-B6) in alarm Area radiation (2K11
-B1 0) in alarm Process liquid (2K11
-C10)      Secondary Sys Radiation Hi (2K11
-A10) NOT in alarm.
CBOR Check CCAS, and SIAS actuated on PPS inserts.
Verify one Emergency Penetration Room Vent fan running.
CNTMT coolers in Emergency Mode.
CRS Notify S M to perform the following:
SE report to control room.
Announce reactor trip on plant page.
Refer to Tech Specs and EALs.
CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.
Diagnose Loss of Coolant Accident.
CRS Implement Loss of Coolant Accident procedure and open place keeping page. Direct board operators in performing the following
 
actions. ALL Perform crew brief and review floating steps.
Termination criteria:  RCP's secured, RCS Cooldown in progre ss, EFW pump started or at lead examiner's discretion. (continued)
 
Appendix D Operator Actions Form ES D2 Op-Test No.:  1              Scenario No.:  3          Event No.:  4, 5, 6 and 7        Page 15 of 15 2    E vent
 
== Description:==
Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.
Time Position Applicant's Actions or Behavior CRS Direct actions in LOCA procedure.
CBOT Restore CCW to RCP's (Att.21), SW to CCW (ATT.5) and SW to ACW (ATT. 5)
CBOR Verify HPSI and LPSI flow adequate.
CBOT Verify Containment Cooling is operating in Emergency Mode.
CBOT Verify one Penetration Room Exhaust Fan running.
CBOT Start Hydrogen Analyzers.
CBOR Start R CS cooldown.
Termination criteria:  RCP's secured, RCS Cooldown in progress, EFW pump started or at lead examiner's discretion.}}

Revision as of 14:01, 18 December 2018

Arkansas Nuclear One - July 2003 - Draft Ro/Sro Operating Examination
ML032540403
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/27/2003
From: Gody A T
Operations Branch IV
To: Anderson C G
Entergy Operations
References
-RFPFR, 50-368/03-301 50-368/03-301
Download: ML032540403 (146)


Text

JPM- ANO-2-JPM-RO-NRC-A3 JOB PERFORMANCE MEASURE UNIT: 2 REV #: DATE: 14 July 2003 SYSTEM/DUTY AREA: A.3 Radiation Control TASK: Utilization of Radiation Work Package to determine radiation equipment requirements for a job as well as ALARA concerns JTA#: KA VALUE RO:

2.9 SRO: 3.3 KA

REFERENCE:

2.3.10 APPROVED FOR ADMINISTRATION TO: RO:

X SRO: X TASK LOCATION: INSIDE CR: OUTSIDE CR:

X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE): PLANT SITE: SIMULATOR: Perform Perform LAB:

POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE: PERFORM:

APPROXIMATE COMPLETION TIME IN MINUTES: 15 minutes REFERENCE (S): EXAMINEE'S NAME:

SSN: -

- EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY: UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time: Stop Time: Total Time:

SIGNED__________________________________ DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE This JPM is to be conducted in conjunction with JPM B.2.b ANO-2-JPM-NRC-SFPSW Add water from Loop II SW to the Spent Fuel Pool.

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

Inform the examinee that the JPM shall begin as soon as the RCA control point is reached. Provide the RWP to the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. Plant is DEFUELED and all cask loading operations are secured.
2. Power has been lost to both SFP cooling pumps and 2K11-K5 "FUEL POOL TEMP HI" is in alarm.
3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
4. SFP purification is out of service for replacement of 2FP-10, SFP purification pump discharge.
5. Fuel Pool low level alarm is in and SFP level is lowering.

The SM/CRS directs, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006," Section 10.0 beginning with step 10.5" TASK STANDARD: 2.3.10 Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.

TASK PERFORMANCE AIDS: RWP, Dosimeter, protective clothing as necessary SIMULATOR INITIAL CONDITIONS:

JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006," Section 10.0 beginning with step 10.5" Hand the examinee the RWP and survey for this JPM when he is ready to enter the RCA CRITICAL ELEMENTS (C): 1, 2 PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. (C) Review RWP.

Identify required dosimetry from the survey map.

POSITIVE CUE:

Dosimeter obtained Examinee reviews the RWP and survey map to determine requirements. Identifies that the required dosimetry based on the provided survey is only a TLD.

N/A SAT UNSAT N/A SAT UNSAT

2. (C) Obtain Electronic Alarming Dosimeter (EAD) from the rack outside the CAA entrance and activate it at the access turnstile using appropriate Radiation Work Permit number, and enters the CAA when access is granted.

Determine the requirements for dosimetry, clothing, and respirators.

POSITIVE CUE:

Examinee will obtain an EAD and insert the EAD into the activation slot, scan the bar code on his TLD, and follow the instructions on the screen. Entering RWP number and answering the questions on the computer fields of the access terminal. Once all fields have been entered appropriately, access is granted.

Used RWP and survey provided to determine that protective clothing is required to be worn in this area.

N/A SAT UNSAT N/A SAT UNSAT

3. Dons personal safety equipment as required inside the CAA Hardhat, safety glasses, and earplugs worn where required in the CAA. N/A SAT UNSAT 4. (C) While in the CAA the examinee observes and adheres to all applicable postings and entry requirements. While in the CAA the examinee observes and adheres to all applicable postings and entry requirements.

N/A SAT UNSAT

5. Determines radiological status of area around valves to be operated to refill SFP. Determines or knows that the area around valves to be operated to refill SFP is a contamination area.

N/A SAT UNSAT

6. (C) Determines requirements for entry into the contaminated area around the SFP. NO additional dosimetry, single PCs, and no pre-job brief.

N/A SAT UNSAT 7. (C) When exiting the CAA the examinee enters the control point area and enters a PCM-1 monitor. Examinee clears the PCM-1 monitor and exits.

N/A SAT UNSAT 8. (C) If hand carried materials were taken into the CAA, they will be cleared through the tool contamination monitor (TCM) Examinee places hand carried items in the TCM for counting N/A SAT UNSAT

9. After clearing the PCM-1 monitor, the examinee exits through the Portal Monitor Examinee clears the Portal Monitor N/A SAT UNSAT
10. Examinee deactivates EAD at final exit of session Examinee deactivates his EAD and returns it to the Health Physics rack.

Terminating cue: Egress from CAA completed.

END RWP ANO Page 1 of 3 Status: Active RADIOLOGICAL WORK PERMIT Rev 0 Unit C RWP 2003-0005 SECTION I RWP DESCRIPTION START DATE: 01-Jan-2003 END DATE: 31-Dec-2003 RWP TYPE: General DESCRIPTION:

Tours and Inspections SYSTEM COMPONENT BLDG LOCATION NA NA A1 Non LHRA's NA NA A2 Non LHRA'sl NA NA OSCA Non LHRA's JOB CONTACTS. Various ALARA CODE....C0008011 JOB CODE......ROS- ALARA CAT.....Level II SECTION II TASK LIST ESTIMATED TASK STATUS TASK DESCRIPTION PR-HR PER-REM 1 Active Non Locked High Radiation Areas 116709. 0.617 TOTALS l116709. 0.617 SECTION III RWP REVIEWS AND APPROVAL Originator FULTZ MW 19-Dec-2002 Development RASMUSSON DC 19-Dec-2002 ALARA Eval RASMUSSON DC 19-dec-2002 HP Supv. RASMUSSON DC 19-Dec-2002 Terminated ____________ ___________ Completed ____________ ___________ Withdrawn ____________ ___________

Fri Jun 6 07:30:50 2003 working RWP 2003-0005 RWP ANO Page 2 of 3 SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2003-0005 TASK TASK DESCRIPTION ( Task# 1 )

1) Non Locked High Radiation Areas RADIOLOGICAL CONDITIONS ( Task# 1 ) Component/Location (mrem/Hr) Gen Max Dpm/100cm2 Yr/DANI# A1,A2 OSCA 1 1 200 80 <1K <1K Monthly pkg Monthly pkg Dosimetry : Whole body TLD required, and Alarming Dosimeter.

Fri Jun 6 07:30:50 2003 working RWP 2003-0005 RWP ANO Page 3 of 3 SECTION IV PROTECTIVE REQUIREMENTS BY TASK Rev 0 RWP 2003-0005 TASK TASK DESCRIPTION (Task# 1) ------------------------- SPECIAL INSTRUCTIONS ------------------------ ALARA Actions:

1) Unless otherwise directed by RP supervision, Electronic Alarming Dosimeter (EAD) set points will be 5 mrem dose and 40 mrem/hr dose rate.
2) Utilize low dose areas whenever possible to minimize exposure.

Monitoring:

1) Notify the zone coverage RP or the on duty shift RP of areas to be entered and work to be performed.
2) Area posting/survey maps should be reviewed to ensure awareness of radiological conditions in your work area. This information can be obtain from one or more of the following: A.) RWP - Radiological Conditions Section. B.) Area Posting - Locale posting in the field. C.) Status Board - At CA-2, Unit-1 elevation 404', Unit-2 elevations 354', 335' and 317' general areas. D.) Surveys Maps - Posted outside cubicles. (Unit-1 only, 386' elevation and below). E.) RWP File - Contact RP if file is desired. F.) RP Personnel - Contact RP @ CA-1 (#5166), or use radios (on channel 2), located at CA-2 386' dress out area, 354' and 335' elevations near the elevators.
3) Periodically check Electronic Alarming Dosimeter (EAD). This check should be more frequent in areas where your ability to hear the alarm is diminished. If any EAD alarm is received secure work, exit area, and notify RP.
4) Initial/intermittent RP coverage is required for entry into High Radiation Areas unless the individual is "Category 3 Advanced Radworker" qualified and has the appropriate radiation survey meter at all times during the entry. NOTE: An EAD is not an appropriate survey meter.
5) Prior to entering a "Radioactive Materials Area" outside Controlled Access, contact RP to ensure all personnel, equipment, and material is evaluated for appropriate monitoring upon exit.

Work Controls:

1) Ensure the proper surveys are performed prior to removing any items from the RCA. Respiratory:

l1) Based on historical and current data Airborne Activity is <30% DAC. Respiratory protection is not required unless otherwise posted.

Anti-C's:

1) Use Anti-C's appropriate for the area to be entered.

Fri Jun 6 07:30:50 2003 working RWP 2003-0005

8 FOR TRA I NING PURPOSES ONLY SM EAR DATA (D PM/100cm 2) SURVEY DATA 1- 2000 2- 3000 3- 800 4- 1000 5- 200 6- 400 L.A.S. Da ta (cpm/L A S) 1. 20 2. 30 3. 20 4. 20 5. 40 6. 35 Un it: 2 B u ild in g: RAB Elev ation: 404 R oom: 2151 R x Pw r: 100 T e m p l a t e: 2A 2-24 Fr e q ue nc y: m o nt hl y S u rv ey D a t e: 07-01-2003 S u rv ey T i m e: 21: 10: 00 Statu s: Co m p lete R W P: 1 T a s k 1 D A N#: 5-1-7 Su rve y e d B y: K e i t h A. M u rra y Badg e: 956 R e vi ew ed B y: J a m e s D. L oop er No tes: Peer C h eck by BEK/837 Alpha Da ta (D PM/100cm 2) Inst r u m e nt s Use d In s t ru m e n t: R A M-ION-R A M-049 C a l D u e: 08-31-2003 S r cC k D u e: 07-04-2003 D/C & B k g N/A N/A In s t ru m e n t: R M-C HP-C R-106 C a l D u e: 07-30-2003 SrcC k Du e:N/A D/C & Bk g 10 100 L.A.S. Alpha (cpm/L A S) A l l Radi at i on val ues are i n m r em/hour unl es s ot herw i s e not ed S m ear res u l t s: < 1000 dpm

/100c m 2 or < 100 CCP M/L A S unl es s ot herw i s e not ed O S m ear l o c a t i on (100c m 2) Large A r ea S m ear (LA S) l o c a t i on ANO-2-JPM-NRC-CVCS2 PAGE 1 OF 5 JOB PERFORMANCE MEASURE

UNIT: 2 REV #: 003 DATE: SYSTEM/DUTY AREA:

Chemical and Volume Control System TASK: Perform Emergency Boration (Alternate Success Path)

JTA#: ANO2-RO-EOPAOP-OFFNORM-193 (Perform Emergency Boration)

KA VALUE RO: 3.9 SRO: 3.7 KA REFEREN CE: 004 A4.07 APPROVED FOR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB: POSITION EVALUATED:

RO: SRO: ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

7 Minutes REFERENCE (S):

OP 2203.032, OP 2103.015 EXAMINEE'S NAME:

SSN: EVALUATOR'S NAME: THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS

JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A

QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-CVCS2 PAGE 2 OF 5 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "B riefing Checklist

- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Mode 3, A Shutdown Margin is calculated following a reactor trip.

TASK STANDARD:

Greater than or equal to 40 g allons per minute boric acid solution being injected into the RCS using BAM Pumps via Emergency Borate Valve (2CV

-4916-2). This is an alternate success path JPM.

TASK PERFORMANCE AIDS:

AOP 2203.032 Steps 2 through 6. Copy of RHOBAL Shutdown margin , OP 2103.015 Worksheet 4, showing SDM not met.

SIMULATOR SETUP:

A Mode 3 IC will be set up for this JPM. Use CASE file JPM01.

The elements of this file are:

Trigger 5 = 2CV

-4873-1a = 75%. 2CV

-4873-1a (VCT Outlet) malfunction set to 75%; Then overrides 2HS

-4873-2 are set to false and 2HS

-4873-3 set to false to turn lights off.

This case file will simulate the VCT Outlet valve tripping its output breaker due to a motor fault as it tries to shut.

ANO-2-JPM-NRC-CVCS2 PAGE 3 OF 5 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform actions as required." CRITICAL ELEMENTS (C): 1, 5, 6 PERFORMANCE CHECKLIST STANDARD (Circle One)

(C) 1. Review SDM calculation and recognize SDM is not met for

current condition

s. Recognize that SDM is not met and that emergency boration is

required. N/A SAT UNSAT EXAMINERS NOTE:

Examinee may review the instruction section of OP 2103.015 and then ask what method of emergency boration the CRS/SM recommends.

EXAMINERS CUE

When asked which method of Emergency boration is recommended, give the following CUE:

"Borate using the BAM Tank Gravity Feed valves per AOP 2203.032 starting with step 2."

2. Verify at least one Charging Pump (CCP) running with flow greater

than 40 GP M. POSITIVE CUE:

Red light(s) ON.

Flow is greater than 40 gpm.

On Panel 2C09, verified CCP(s) running. Observed red light ON; green light OFF above at least one of the

following handswitch(es):

2HS-4832-1, "A" CCP 2HS-4852-1, "C" CCP (red) 2HS-485 3-2, "C" CCP (green) 2HS-4842-2, "B" CCP Observed flow greater than 40

gpm on Charging Header Flow

(2FIS-4863). N/A SAT UNSAT

3. Align Boric Acid Supply To CCP Suction. POSITIVE CUE:

Red light(s) ON.

NEGATIVE CUE:

Green light(s) ON.

On Panel 2C0 9, opened BAMT Gravity Feed Valves 2CV

-4920-1 and/or 2CV

-4921-1 Observed red light ON and green

light OFF above handswitch(es):

In the following step the VCT Outle t Valve will NOT close requiring an alternate success path.

ANO-2-JPM-NRC-CVCS2 PAGE 4 OF 5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

4. Close Volume Control Tank (VCT)

Outlet Valve (2CV

-4873-1). POSITIVE CUE:

Green light OFF.

Red light OFF.

NEGATIVE CUE:

Red light ON.

On Panel 2C09, observed that 2CV-4873-1 did NOT go clos ed. Observed green light OFF; red

light OFF above VCT Outlet Valve

handswitch (2HS

-4873-1). N/A SAT UNSAT (C) 5. Start at least ONE BAM Pump.

POSITIVE CUE:

Red light ON.

NEGATIVE CUE:

Green light ON.

On Panel 2C09, start 2P39A and/or 2P39B. Obser ved RED light ON above the BAM pump started, 2HS

-4919-2 (2P39A) or 2HS

-4910-2 (2P39B).

N/A SAT UNSAT (C) 6. Open Emergency Borate From BAM Pumps Valve (2CV

-4916-2). POSITIVE CUE:

Red light ON.

NEGATIVE CUE:

Green light ON.

On Panel 2C09, opened 2C V-4916-2. Observed red light ON; green light OFF above Emergency Borate

Valve, 2CV

-4916-2. N/A SAT UNSAT

7. Verify Boric Acid Makeup Flow Control Valve (2CV

-4926) closed.

POSITIVE CUE:

Green light ON.

NEGATIVE CUE:

Red light ON.

On Panel 2C09, ver ified 2CV-4926 closed.

Observed green light ON; red light

OFF above Boric Acid Makeup

Flow Controller (2FIC

-4926). N/A SAT UNSAT

8. Check Reactor Makeup Water Flow Control Valve (2CV

-4927) or VCT Makeup Isol valve (2CV

-4941) closed. POSITIVE CUE:

G reen light ON.

NEGATIVE CUE:

Red light ON.

On Panel 2C09, verified 2CV

-4927 or 2CV

-4941 closed.

Observed green light ON; red light

OFF above Reactor Makeup

Water Flow Controller

(2FIC-4927) or above 2CV

-4941 handswitch.

N/A SAT UNSAT

9. Check Charg ing Header Flow (2FIS-4863) greater than 40 gpm.

POSITIVE CUE:

Flow is: 44 gpm (1 CCP) 88 gpm (2 CCP) 132 gpm (3 CCP)

On Panel 2C09 (upright portion), observed flow greater than 40

gpm on Charging Header Flow

indicator (2FIS

-4863). N/A SAT UNSAT

ANO-2-JPM-NRC-CVCS2 PAGE 5 OF 5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARD (Circle One)

EN D ANO-2-JPM-NRC-CVCS2 PAGE 6 OF 5 JOB PERFORMANCE MEASURE EXAMINEE COPY JPM INITIAL TASK CONDITIONS:

Mode 3. A Shutdown Margin is calculated following a reactor trip.

INITIATING CUE:

The SM/CRS directs, "Review SDM calculation, OP 2103.015 worksheet 4 and perform

actions as required."

INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE 2203.032 EMERGENCY BORATION 04/30/02 2 of 14 NOTE Step s with (*) are continuous action steps.

1. Refer to 1903.010, Emergency Action Level Classification.
2. Verify at least ONE Charging pump running with flow greater than 40 gpm. 2. Perform the following:

A. IF in Mode 1 or 2, THEN perform the foll owing: 1) Trip Reactor.

2) GO TO 2202.001, Standard Post Trip Actions.

B. IF in Mode 3, 4, 5, or 6, THEN perform the following:

1) Verify TCBs open.
2) GO TO Step 8.

INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE 2203.032 EMERGENCY BORATION 04/30/02 3 of 14 3. Align Charging pump suction to at least ONE of the following sources:

A. Gravity Feed:

1) Open at least ONE BAM Tank Gravity Feed valve:
1) Start at least ONE BAM pump.
2) Open Emergency Borate From BAM Pumps valve (2CV

-4916-2). 3) Verify Boric Acid Makeup Flow Control va lve (2CV-4926) closed.

C. RWT to Charging pumps:

1) Open Charging Pump Suction Source From RWT valve (2CV-4950-2). 4. Close VCT Outlet valve (2CV

-4873-1). 4. IF VCT Outlet valve does NOT close, THEN perform the following:

A. Start at least ONE BA M pump. B. Open Emergency Borate From BAM Pumps valve (2CV

-4916-2). C. Verify Boric Acid Makeup Flow Control valve (2CV

-4926) closed.

5. Check Reactor Makeup Water Flow Control valve (2CV

-4927) closed.

5. IF 2CV-4927 NOT closed, THEN close VCT Make Up Isolation valve (2CV-4941-2).

INSTRUCTIONS CONTINGENCY ACTIONS PROC NO TITLE REV DATE PAGE 2203.032 EMERGENCY BORATION 04/30/02 4 of 14 6. Check Charging Header Flow indicator (2FIS-4863) greater than 40 gpm. 6. GO TO Step

2. 7. GO TO Step 15.
8. Check RCS pressure less than 1265 psia. 8. IF RCS pressure greater than 1265 psia, THEN reduce RCS pressure as follows:

A. Reset Low PZR Press Setpoints during pressure reduction.

B. Commence RCS pressure reduction to less than 1265 psia as follows:

1) IF RCPs running, THEN use Normal PZR spray.
2) IF ALL RCPs stopped, THEN open PZR High Poin t Vent To Quench Tank valves:

D. Maintain RCS MTS greater than 30°F.

9. Align ONE HPSI Train as follows:

A. Verify RWT level greater than 7.5%.

B. Verify associated RWT Outlet valve open:

PROC./WORK PLAN NO.

2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 2 of 21 CHANGE: 035-04-0 1.0 PURPOSE To provide a methodology for the calculation of critical configuration estimation and shutdown margin.

2.0 SCOPE

Procedure includes calculation methodology for determining critical Boron concentration, critical CEA position, shutdown margin (Modes 1, 2, 3, 4, 5 and 6), and Boron concentration required to maintain shutdown margin (Modes 3, 4, 5 and 6). The cycle specific data, curves and tables, needed to perform the calculations at any specified time during the cycle have been relocated to a Cycle specific Engineering Report (Plant Data Book).

Procedure satisfies Unit 2 Technical Specification surveillances 4.1.1.1.1.a, b, d & e and 4.1.1.2.a & b and ensures compliance with Limiting Condition for Operation 3.9.1.

3.0 DESCRIPTION

This procedure contains instructions and worksheets to perform reactivity balance calculations. Using the worksheets and cycle specific data provide d in the current cycle's Plant Data Book, operators can calculate estimated critical configurations, shutdown margin, and needed Boron additions and

subtractions at power and during cool downs and heatups. Additional

information to assist the operators dur ing operation in Mode 1 is included.

4.0 REFERENCES

4.1 References

Used In Procedure Preparation

  • Plant Heat up (2102.002)
  • Power Operation (2102.004)
  • Plant Cool down (2102.010)
  • Reactor Startup (2102.01
6)
  • Soluble Poison Concentration Control (2103.004)
  • CEDM Control System Operation (2105.009)
  • Reactivity Anomaly Check Surveillance (2302.002)
  • RHOBAL Updates for the Current Cycle of ANO

-2

  • ANO-2 Physics Data Book for the Current Cycle
  • Core Operating Limits R eport for the Current Cycle
  • Reload Analysis Report for the Current Cycle
  • CR-2-88-0355 items 3 and 5, Conservatism in SDM Calculations

PROC./WORK PLAN NO.

2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 3 of 21 CHANGE: 035-04-0 4.2 References Used In Conjunction With This Procedure

  • RHOBAL Updates for the Current Cycle of ANO

-2

  • ANO-2 Physics Da ta Book for the Current Cycle
  • 1000.104, Condition Reporting and Corrective Actions
  • 2102.002, Plant Heat up
  • 2102.016, Reactor Startup
  • 2302.002, Reactivity Anomaly Check Surveillance
  • 2103.004, Soluble Poison Concentration Control
  • ANO-2 Plant Data Book for th e Current Cycle 4.3 NRC Commitments
  • Step 5.7 and the projected block that can be checked on the worksheets of this procedure satisfy a commitment stated in

0CANO78012, Response to Inspection Report 80

-10, Shutdown Margin Worksheet require specific notifi cation to signify projected value, dated 7 80 (Commitment P11265).

5.0 LIMITS

AND PRECAUTIONS 5.1 CEA worth figures A5A, A5B, A5C, B3, and Tables A5 and B3 of the Plant Data Book assume Groups and Banks other than those specified

are fully withdrawn.

Positions and associated worths for Groups 5 (figure/table A5), 6 and P are specified on the figures and tables.

5.2 The CEA group positions shall be maintained above the transient insertion limits of Technical Specification 3.1.3.6 during operation

in mo des 1 and 2. This ensures the shutdown margin required by Technical Specification 3.1.1.1 is maintained.

If the above requirement is not met, initiate and continue boration at >40 gpm of 2500 ppm boric acid solution or equivalent until the required shutdo wn margin is restored.

5.3 In modes 1, 2, 3, 4, and 5, a shutdown margin of

-5.5%D k/k (-6.0%D k/k when <60 EFPD) or more negative shall be maintained at all times. If a calculation indicates that the appropriate margin is not in effect, measures should be initiated immediately to restore the margin by boration. These shutdown margin requirements include a 0.5%

D k/k margin to allow for error in the curves and operating data enclosed in this procedure. An additional 0.5%

D k/k conservatism is added to the shutd own margin requirements above until after startup tests have shown good agreement with predictions. This extra conservatism may be removed following completion of startup physics tests for a cycle.

PROC./WORK PLAN NO.

2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 4 of 21 CHANGE: 035-04-0 5.4 While shutdown (in modes 3, 4, and 5) CEA Shutdown G roups A and B should be fully withdrawn at all times if possible. If it is not possible to have Shutdown Groups A and B withdrawn, at least one

boron dilution monitor and alarm should be operable. (Reference Cycle

11 Reload Analysis Report, Section 7.1.1.1

) 5.5 While at refueling shutdown (<l40

°F with the vessel head unbolted or removed), the boron concentration shall be maintained at all times to ensure that Keff

<0.95. To accomplish this, and account for uncertainty, Keff is required to be

<0.941 when <6 0 EFPD or Keff

<0.945 when

>60 EFPD. Also verify that the RCS (and refueling canal boron) concentration is greater than or equal to 2500 ppm. The more restrictive of these conditions must be met and is referred to as the

refueling boron concentration in Wo rksheets 5 and 6. If the more restrictive of the above conditions is not in effect (i.e. the refueling boron concentration), measures shall be initiated

immediately to restore the boron concentration to the required value.

5.6 Use the conservative data suppli ed in Table B4 (CEA worth less the worth of the worst stuck rod pair) for an inoperable CEA. For the purposes of shutdown margin calculations a CEA is considered

inoperable only when it is untrippable and not fully inserted.

5.7 If shutdown margin workshe ets are employed to project shutdown margin for other modes (such as during heat ups or cool downs), the "PROJECTED" block should be checked at the top of the worksheet to

preclude confusing such projected values with actual values.

Typically Worksheet 5 i s to be used for such projected shutdown margin. (Commitment P11265) 5.8 A computer program, RHOBAL, exists to perform the calculations of all Worksheets in this procedure. Contact Reactor Engineering if

assistance is needed in performing these worksheets. 5.9 Figures C1 through C5 of the Plant Data Book include additional boron to account for Sm buildup to the equilibrium Sm value at the

beginning of a cycle.

5.10 When using Worksheets 4, 5, 6 and 8, and a CEA has been declared inoperable per TS, it is onl y necessary to assume that it is inoperable under the scope of these worksheets if it is untrippable and not fully inserted

. 6.0 SETPOINTS None PROC./WORK PLAN NO.

2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 5 of 21 CHANGE: 035-04-0 7.0 INSTRUCTIONS

7.1 General

7.1.1 The equation used for calculating a reactivity balance is:

r (net) = r (fuel) + r (boron) +

r (CEAs) +

r (temp) + r (power) + r (xenon) +

r (Net Sm) where it is understood that the values for r above are added algebraically (i.e. poisons are negative values).

7.1.2 When r (samarium) is called for in this procedure, the net samari um worth as defined by RHOBAL is the samarium worth which should be used.

7.1.3 The xenon reactivity worth is obtained from the RHOBAL computer program, which is accessible on the personal

computers in the control room.

7.1.4 The samarium reactivity worth can be obtained from the RHOBAL computer program, which is accessible on the personal computers in the control room.

7.1.5 When running a Rhobal power history, power must be stable for a minimum of 72 hrs and burn up must be >30 EFPD prior

to using the Equili brium Concentrations initialization option. Otherwise, for > 30 EFPD, the power history must begin from the last time equilibrium conditions existed and

the transient must be modeled in the program. For < 30

EFPD, the BOC conditions initialization option m ust be used and the entire power history from BOC must be modeled. As an alternative, the input concentrations option may be used

and the concentrations from a previous power history

starting from the above conditions would be the input.

7.1.6 Shutdown

m argin is the instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming all control element

assemblies are fully inserted except for the single

assembly of highest reactivity worth whi ch is assumed to be fully withdrawn.

7.1.7 Keff is defined as 100/(100

-r) where r is a negative reactivity value when shutdown, in units of %

D k/k. 7.1.8 When using values from figures or tables, either interpolate values between curves or data points, ca lculate the values if equations are provided, or use RHOBAL to determine the values.

7.1.9 Where

worksheets call for a value from a figure, the table used to calculate the figure can be used to provide a more

accurate value.

PROC./WORK PLAN NO.

2103.015 PROCEDURE/WORK PLAN TITLE: REACTIVITY BALANCE C ALCULATION PAGE: 6 of 21 CHANGE: 035-04-0 7.1.10 Select the appropriate works heet from Step 7.2 or obtain the equivalent output from RHOBAL. Follow the instructions as given on the worksheet. Contact Reactor Engineering for

assistance with reactivity problems which the Operations

staff cannot expeditiously resolve.

A NO-2-JPM-NRC-ELECXT PAGE 1 OF 6 JOB PERFORMANCE MEASURE

UNIT: 2 REV #: 000 DATE: SYSTEM/DUTY AREA:

A. C. Electrical Distribution TASK: Perform Synchronized Cross Connect of 480 VAC load

-centers 2B1 and 2B2 JTA#: ANO2-RO-480VAC-NORM-15 KA VALUE RO: 3.3 SRO: 3.1 KA

REFERENCE:

062 A4.01 A PPROVED FOR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB: POSITION EVALUATED:

RO: SRO: AC TUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE (S):

OP 2107.001 EXAMINEE'S NAME:

SSN: EVALUATOR'S NAME:

THE EXAMINEE'S PER FORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS J PM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

A NO-2-JPM-NRC-ELECXT PAGE 2 OF 6 JOB PERFORMANCE MEASURE

ANO-2-JPM-RO-ELECXT PAGE 3 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Wal kthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

Non-Vital 4160VAC busses energized. 2B1 and 2B2 are energized.

TASK STANDARD:

Cross connect 480VAC non

-vital busses 2B1 and 2B2 with 2B1 suppl ying and 2B2 feeder breaker open. Maintain 2B1 amperage less than 130 amps.

TASK PERFORMANCE AIDS:

OP 2107.001 Section 12.0.

SIMULATOR SETUP:

Any power level or mode.

All Non-Vital 4160VAC and 480VAC Busses energized.

Summed 2B1 and 2B2 bus currents are greater than 130 amps (REMOTE malfunctions 480CURR2B1 And 480CURR2B2).

ANO-2-JPM-RO-ELECXT PAGE 4 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Cross Connect 2B1 and 2B2 and open 2B2 feeder breaker from 2A2 using OP

2107.001 section 12.0." CRITICAL ELEMENTS (C):

2, 3, 4, 6, 8

PERFORMANCE CHECKLIST STANDARDS (Circle One)

Examiner's note:

If the initial plant conditions are in Mode 3, 4 or 5, then the first step is N/A.

1. Check that Operations Manager approval obtained.

EXAMINER'S CUE:

"The Operations Manager has given pe rmission to perform Cross Connect of 2B1 and 2B2." Ask if Operations Manager has given approval to cross connect

2B1 and 2B2 at power.

N/A SAT UNSAT Examiner's note:

The following two steps may be completed after cross

-connecting the busses. The reso lution on the meters is low at the low end.

(C) 2. Determine combined load of 2B1 an 2B2.

On Panel 2C10, summed the current reading of 2B1 and 2B2.

Observed that the summed load

is greater than 130 amps.

N/A SAT UNSAT

ANO-2-JPM-RO-ELECXT PAGE 5 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 3. Reduce loads on 2B1 an d 2B2 so that combined loading is less than 130 amps when cross

connected.

EXAMINERS CUE:

"AO has been directed to secure non

-essential loads on 2B1 and 2B2 to reduce loading on 2B1 and 2B2 to less than

130 amps."

EXAMINERS NOTE:

Direct operator in simulat or instructor's station to reduce loading on 2B1 and 2B2 so

that loading is less than 130 amps (use REMOTE malfunctions 480CURR2B1

and 480CURR2B2).

Direct the AO or inform CRS of need to reduce non

-essential loads on 2B1 and 2B2 so that combined loading i s less than 130 amps.

N/A SAT UNSAT (C) 4. Synchroscope switch inserted in 2B1/2B2 cross

-tie slot and placed in ON.

On Panel 2C10, Placed Synchroscope switch into

2B1/2B2 cross

-tie slot and rotated clockwise to the ON position. N/A SAT UNSAT

5. Observed that the Synchroscope is at the 12

o'clock position.

On Panel 2C10, Observed that the Synchroscope is at the 12

o'clock position with the

Synchroscope switch in the ON

position. N/A SAT UNSAT (C) 6. Close the 2B1/2B2 Cross Tie breaker. O n panel 2C10, rotate the Cross Tie handswitch for 2B1/2B2 clockwise.

Observed that the Green light

turns OFF and the Red light turns

ON above the Cross Tie

handswitch.

N/A SAT UNSAT

7. Verify that the amperage indicated on 2B1 is less than

130 amp s. On panel 2C10, observe that the current is less than 130 amps on

2B1. N/A SAT UNSAT

ANO-2-JPM-RO-ELECXT PAGE 6 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 8. Open normal supply breaker on 2B2. AND Open Transformer feeder

breaker from 2A2 to 2B2.

On Panel 2C10, rotate the normal feeder supply breaker on 2B2

cou nter clockwise to the open position. Observed that the RED light went OFF and the GREEN light went

ON. On Panel 2C10, rotate the

transformer feeder breaker on

2A2 to 2B2 counter clockwise to

the open position.

Observed that the RED light went OFF and th e GREEN light went ON. N/A SAT UNSAT

9. Turn sync switch to OFF.

On Panel 2C10, turn sync switch counter clockwise to the OFF

position. N/A SAT UNSAT

9. Notified AO to monitor 2B1 transformer during cross

connected operation and

maintain temp erature less than 220°C. EXAMINER'S CUE

"AO has been notified to monitor 2B1 transformer and

notify the control room if

temperature exceeds 220°C

during cross connected

operations."

Notify AO to monitor 2B1 transformer during cross

connected operation a nd maintain temperature less than 220°C. N/A SAT UNSAT END ANO-2-JPM-RO-ELECXT PAGE 7 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:

Non-Vital 4160VAC busses are energized. 2B1 and 2B2 are energized.

INITIATING CUE:

The SM/CRS directs, "Cross Connect 2B1 and 2B2 and ope n 2B2 feeder breaker from 2A2 using OP 2107.001 section 12.0."

PROC./WORK PLAN NO.

PROCEDURE/WORK PLAN TITLE:

PAGE: 23 of 169 2107.001 ELECTRICAL SYS TEM OPERATIONS CHANGE: 12. CROSS CONNECTING 480V NON

-ESF BUSES CAUTION

  • Time dependent over current relays exist on all 480V Load Center feeder breakers. They are set at 1600 amps (equates to 185 amps on 4160V AC side). Bus load should not exceed 173 amps (including 7% tolerance).
  • Transformer continuous amperage rating at 4160V is 139 amps. Continuous operation >

139 amps will eventually degrade transformer.

(130 amp limit based on 7% instrument error) 12.1. IF in Modes 1 OR 2, AND cross connecting for non

-emergency conditions, THEN obtain Operations Manager concurrence.

12.2. IF BOTH buses energized, AND combined load >

130 amps, THEN adjust load as necessary to achieve <

130 amps combined load.

12.3. IF cross connecting to energize a de-energized bus, THEN strip all loads from de

-energized Load Center.

12.4. Place Synchroscope switch for appropriate Cross Tie breaker to ON.

12.5. IF cross connecting energized buses, THEN check synchroscope at 12 o'clock position.

12.6. Close selected Cross Tie break er. 12.7. IF desired to separate 480V bus from 4160V AC bus, THEN open the following breakers:

12.7.1. Normal Supply breaker on 480V bus.

12.7.2. Transformer Feeder breaker on 2A1 OR 2A2.

12.8. Verify < 130 amps on supplying transformer.

12.9. Turn Sync switch to OFF.

12.10. IF EITHER Load cente r has been stripped, THEN energize loads as directed by S/M.

12.11. Monitor supplying transformer to ensure temperature remains <

220°C while buses are cross

-connected.

12.12. Maintain <

130 amps on supplying transformer while buses are cross-connected.

ANO-2-JPM-NRC-SIT01 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE: SYSTEM/DUTY AREA:

Safety Injection System TASK: Perform a high pressure fill of a SIT (SIT "A") (Alternate Success Path)

JTA#: ANO2-RO-ECCS-NORM-2 (Perform filling SIT's (RCS pressure >1500psia))

KA VALUE RO: 3.3 SRO: 3.7 KA

REFERENCE:

006 A2.03 APPROVED FOR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB: POSITION EVALUATED:

RO: SRO: ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

10 Minutes REFERENCE (S):

OP 2104.001 EXAMINEE'S NAME:

SSN: EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS

JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGN ED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A

QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-RO-SIT01 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall r eview the "Briefing Checklist

- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

HPSI Pump (2P89A) is running on minimum recirculation and "A" SIT (2T2A) header from "A" train has been flus hed TASK STANDARD:

Safety Injection Tank (2T2A) level has been raised ~ 0.3% and fill is secured.

This is an ALTERNATE SUCCESS PATH JPM.

TASK PERFORMANCE AIDS:

OP 2104.001 Section 8.0.

SIMULATOR SETUP:

Setup override to de

-energize the red and green lights for 2CV

-5015-1 when the handswitch is taken to the open position and have the valve open 1%. Safety Injection Tank (2T2A) pressure is <608 psig. Safety Injection Tank (2T2A) level ~ 82.5%.

HPSI Pump (2P89A) is running on minimu m recirculation.

RCS Pressure is > 1500 psia.

Run CASE file JPM04. It will do the following:

Set T4=sitfill (triggered when 2HS5015

-1 red light energized).

T4 Set 2CV5015_a = 0.1 T4 Set 2HS

-5015-1_G = FALSE (green light off)

T4 Set 2HS

-5015-2_R = FALSE (red light off)

ANO-2-JPM-RO-SIT01 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Raise Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with

step 8.3." CRITICAL ELEMENTS (C):

1, 2, 4, 5, 6

PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 1. Open SIT (2T2A) Drain Valve (2SV-5001-1). POSITIVE CUE:

Red light ON.

NEGATIVE CUE:

Green light ON.

On Panel 2C17, placed handswitch for 2SV

-5001-1 to OPEN. Observed red light ON above

handswitch.

N/A SAT UNSAT (C) 2. Open SIT (2T2A) Check Valve Bypass (2SV-5004). POSITIVE CUE:

Red light ON.

NEGATIVE CUE:

Green light ON.

On Panel 2C33, placed handswitch for 2SV

-5004 to OPEN. Observed red light ON above

handswitch.

N/A SAT UNSAT

3. Monitor SIT level and pressure during fill.

While filling SIT A , monitored level to ensure level maintained

< 87.9%. While filling SIT A, monitored SIT

pressure closely to ensure

pressure maintained < 624 psig.

N/A SAT UNSAT

ANO-2-JPM-RO-SIT01 PAGE 4 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Throttle open HPSI Header 1 Injection to RCP A Discharge

(2CV-5015-1). POSITIVE CUE: Both lights ON.

NEGATIVE CUE:

Only green light ON.

On Panel 2C17, throttled 2CV-5015-1 OPEN by placing handswitch to OPEN momentarily as required to establish an SIT fill

rate. Observed red and green lights

ON above handswitch.

Observed SIT (2T2A) control board level instrument(s):

2LIS-5008 (2C17) 2LI-5010 (2C17) 2LIS-5009 (2C16)

OR Observed SIT (2T2A) level on

PMS, or SPDS computer

point/trend display.

N/A SAT UNSAT (C) 5. Attempts to close HPSI Header 1 Injection to RCP A Discha rge valve prior to exceeding 87.9%.

NEGATIVE CUE:

Red light ON.

On Panel 2C17, placed handswitch for 2CV

-5015-1 to CLOSE. Recognized that 2CV

-5015-1 would NOT close and both red and green lights are

deenergized.

N/A SAT UNSAT

ANO-2-JPM-RO-SIT01 PAGE 5 OF 6 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 6. Stop the level i ncrease in 2T2A SIT. POSITIVE CUE:

2P-89A is secured OR Closed SIT A Drain Valve (2SV-5001-1). POSITIVE CUE:

2SV-5001-1 green light is ON red light is OFF.

OR Closed SIT A Check Valve Bypass (2SV

-5004). POSITIVE CUE:

2SV-5004 green light is ON red lig ht is OFF.

On panel 2C17, placed handswitch for A HPSI Pump

(2P-89A) in stop Observed 2P89A stopped.

OR On Panel 2C17 placed handswitch for SIT A Drain Valve

(2SV-5001-1) to CLOSED.

Observed green light ON above

handswitch.

OR On Panel 2C33, placed han dswitch for SIT A Check Valve Bypass (2SV

-5004) to CLOSED. Observed green light ON above

handswitch.

N/A SAT UNSAT

7. Inform CRS of failure of 2CV-5015-1 to close.

POSITIVE CUE:

Acknowledge communication as CRS. Direct Examinee to

secure from fill ing A SIT.

Informed CRS that 2CV

-5015-1 failed to close.

N/A SAT UNSAT

8. Close SIT (2T2A) Drain Valve.

(if not closed previously.)

POSITIVE CUE:

Green light ON.

On Panel 2C17, placed handswitch for SIT A Drain Valve

(2SV-5001-1) to CLOSE.

Observe d green light ON above handswitch.

N/A SAT UNSAT

9. Close SIT (2T2A) Check Valve Bypass. (if not closed previously.)

POSITIVE CUE:

Green light ON.

On Panel 2C33, placed handswitch for SIT A Check

Valve Bypass (2SV

-5004) to CLOSE. Observed green lig ht ON above handswitch.

N/A SAT UNSAT END ANO-2-JPM-RO-SIT01 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:

HPSI pump (2P89A) is running on minimum recirculation and "A" SIT (2T2A) header from "A" train has been flushed.

INITIATING CUE:

The SM/CRS directs, "Rai se Safety Injection Tank (2T2A) level 0.3% using OP 2104.001, beginning with step 8.3

."

PROC./WORK PLAN NO.

2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 12 of 89 CHANGE: 8.0 FILLING SITS (RCS PRESSURE

³ 1500 PSIA 8.1 IF leakage is indicated past associated 2SI

-15 check valve THEN GO TO Injection Header Flush and SIT Fill, Attachmen t C of this procedure to fill SIT(s).

8.2 Place

HPSI pump (2P

-89A/B/C) in service on minimum recirculation mode using applicable section of HPSI System Operation (2104.039).

NOTE

  • Steps marked with an
  • are continuous action steps.
  • SIT pressure will rap idly drop 2

-5 psi when opening drain valve if SIT drain header has been depressurized.

  • 8.3 WHEN closing HPSI valves, THEN maintain handswitch in close position for ~

2 seconds after red light out.

  • 8.4 Closely monitor SIT parameters as SIT pressure will rise rapidly during fill operations.

8.5 IF filling A SIT, THEN perform the following:

8.5.1 Verify

open:

  • SIT A Drain valve (2SV

-5001-1)

-5004) 8.5.2 Throttle open selected HPSI Pump Injection MOV:

  • HPSI Header 2 Injection to RCP A Discharge (2CV-5016-2) 8.5.3 WHEN desired level reached, THEN close the following:

A. HPSI valve opened in previous step B. 2SV-5001-1 C. 2SV-5004 PROC./WORK PLAN NO.

2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 13 of 89 CHANGE: 8.6 IF f illing B SIT, THEN perform the following:

8.6.1 Verify

open:

  • SIT B Drain valve (2SV

-5021-1)

-5024) 8.6.2 Throttle open selected HPSI Pump Injection MOV:

  • HP SI Header 2 Injection to RCP B Discharge (2CV-5036-2) 8.6.3 WHEN desired level reached, THEN close the following:

A. HPSI valve opened in previous step B. 2SV-5021-1 C. 2SV-5024 8.7 IF filling C SIT, THEN perform the following:

8.7.1 Ve rify open:

  • SIT C Drain valve (2SV

-5041-2)

-5044) 8.7.2 Throttle open selected HPSI Pump Injection MOV:

  • HPSI Header 2 Injection to RCP C Discharge (2CV-5056-2) 8.7.3 WHEN desired level reached, THEN close the following:

A. HPSI valve opened in previous step B. 2SV-5041-2 C. 2SV-5044 PROC./WORK PLAN NO.

2104.001 PROCEDURE/WORK PLAN TITLE: SAFETY INJECTION TAN K OPERATIONS PAGE: 14 of 89 CHANGE: 8.8 IF filling D SIT, THEN perform the following:

8.8.1 Verify

open:

  • SIT D Drain valve (2SV

-5061-2)

  • SIT D Chec k Valve Bypass (2SV

-5064) 8.8.2 Throttle open selected HPSI Pump Injection MOV:

  • HPSI Header 2 Injection to RCP D Discharge (2CV-5076-2) 8.8.3 WHEN desired level reached, THEN close the foll owing: A. HPSI valve opened in previous step B. 2SV-5061-2 C. 2SV-5064 8.9 WHEN all SIT filling operations are complete, THEN secure HPSI pump using HPSI System Operation (2104.039).

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 6 DATE: 14 July 2003 SYSTEM/DUTY AREA:

Abnormal/Emergency Operations TASK: Secure Containment Spray (during recovery actions for SIAS)

JTA#: 2 0265140101 KA VALUE RO:

3.2 SRO:

3.7 KA

REFERENCE:

026 020 A2.03 APPROVED FOR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

X OUTSIDE CR:

BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB: POSITION EVALUATED:

RO: SRO: ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE:

PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

15 minutes REFERENCE (S):

E OP 2202.003 EXAMINEE'S NAME:

SSN:

- - EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED__________________________________ DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE

PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRE NT WITH THAT REVISION.

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Walkthrough" portion of OP 1064.023 with the examinee.

JPM INITIAL TASK CONDITIONS:

Post LOCA conditions exist. CSS termination criteria are satisfied.

EOP 2202.003 is completed through step 18.A.

TASK STANDARD:

CSAS is reset and CSAS actuated components are secured

.

TASK PERFORMANCE AIDS:

EOP 2202.003 Section 1

- ENTRY Step 18

SIMULATOR SETUP:

SIAS with containment spray actuated. Containment Temperature. < 140 ° F, Pressure < 22.5 psia, AND ALL CNTMT cooling fans running in emergency mode.

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Reset CSAS and secure Containment Spray beginning with OP 2202.003 Section 1

- ENTRY step 18.B." CRITICAL ELEMENTS (C):

1, 2, 3 PERFORMANCE CHE CKLIST STANDARDS (Circle One)

EXAMINERS NOTE:

The following step may be simulated for each of the other three trip paths.

(C) 1. Reset CSAS.

POSITIVE CUE:

All trip paths reset.

Pretrip/trip indicators are reset.

NEGATIVE CUE:

One/all trip paths NOT re set. On panel 2C23B, obtained key and placed it in trip path to be reset.

Placed trip path to UNLK.

Depressed CSAS pushbutton for trip path.

Depressed CSAS lockout reset pushbutton.

Reset pretrip/trip indicators after all CSAS trip paths are reset.

O R On PPS inserts, reset pretrip/trip indicators after all CSAS trip paths are reset.

N/A SAT UNSAT (C) 2. Stop Containment Spray Pumps.

POSITIVE CUE:

Green lights ON.

NEGATIVE CUE:

Red light(s) ON.

On panels 2C16/17, Placed handswitches for C ontainment Spray Pumps (2P35A and 2P35B) in STOP. Observed green lights ON above handswitches.

N/A SAT UNSAT (C) 3. Close Containment Spray Header Isolation Valves.

POSITIVE CUE:

Green lights ON.

NEGATIVE CUE:

Red light(s) ON.

On panels 2C16/17, placed handswitches for Containment Spray Header Isolation valves (2CV-5612-1 and 2CV-5613-2) in CLOSE. Observed green lights ON above

handswitches.

N/A SAT UNSAT END JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 4 OF 8 JOB PERFORMANC E MEASURE QUESTION 1:

Reference:

026 000 K1.01 4.2/4.2 The "B" LPSI pump is running supplying shutdown cooling. Cntmt Spray Header Iso Valve (2CV

-5612-1) is OPEN for testing. The CRS directs shifting shutdown cooling to the "A" LPSI pump through the "B" shutdown cooling heat exchanger. How will containment spray system components respond?

ANSWER:

Reference:

OP 2104.005 Rev. 33 PC

-3 With no CSAS actuation, 2CV

-5612-1 will close.

COMMENTS:

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 5 OF 8 JOB PERFORMANCE MEASURE QUESTION 2:

Reference:

026 000 K4.02 3.1/3.6 While performing the 2P136A monthly test, the operator fails to close 2BS

-11A. What affect will this have on completion of the monthly test?

ANSWER:

Reference:

OP 2104.005 Rev. 33 PC

-3 NaOH Tank Outlet Valve (2CV

-5657-1) will not open (from the control room) due to valve interlocks unless 2BS

-11A is closed.

COMMENTS:

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 6 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY QUESTION 1:

The "B" LPSI pump is running supplying shutdown cooling. Cntmt Spray Header Iso Valve (2CV

-5612-1) is OPEN for testing. The CRS directs shifting shutdown cooling to the "A" LPSI pump through the "B" shutdown cooling heat exchanger. How will containment s pray system components respond?

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 7 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY QUESTION 2:

While performing the 2P136A monthly test, the operator fails to close 2BS

-11A. What affect will this have on completion of the monthly test?

JPM- ANO-2-JPM-RO-EOP01 (AA62002J

-008-A0006) PAGE 8 OF 8 JOB PERFORMANCE MEASURE JPM INITIAL TASK CONDITIONS:

Post LOCA conditions exist. CSS termination criteria are satisfied. EOP 2202.003 is

completed through s tep 18.A.

INITIATING CUE:

The SS/CRS directs, "Reset CSAS and secure Containment Spray beginning with OP

2202.003 Section 1

- ENTRY step 18.B."

JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 1 OF 5 JOB PERFORMANCE MEASURE SYSTEM/DUTY AREA:

Abnormal/Emergency Operations TASK: Restore SDC Flow following an instrument failure

- inadvertent Auto

-Closure Initiation (ACI)

JTA#: Respond to Loss of SDC, ANO2 RO EOPAOP OFF NORM 20355190401

KA VALUE RO:

3.5 SRO:

3.7 KA

REFERENCE:

005 A2.02 APPROVED FOR ADMINISTRATION TO: RO:

X SRO:

X TASK LOCATION: INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB:__________

POSITION EVALUATED: RO: __________ SRO: ___________

ACTUAL TESTING ENVIRONM ENT: SIMULATOR:

PLANT SITE:

LAB: ______

TESTING METHOD: SIMULATE:

PERFORM: ____________

APPROXIMATE COMPLETION TIME IN MINUTES:

15 minutes

REFERENCE (S):

EOP 2203.029

EXAMINEE'S NAME:

SSN: _________________

EVALUATOR'S NAME: _

_____________________________________ DATE _________________

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETER MINED TO BE:

SATISFACTORY:

UNSATISFACTORY: _____________

PERFORMANCE CHECKLIST COMMENTS:

Start Time

Stop Time

Total Time SIGNED__________________________________

DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS B EEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 2 OF 5 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Walkthrough" po rtion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

AOP 2203.029 has been entered due to 2PI

-4623-2 failing "High". SDC pump secured, fuse for 2PS-4623-2 removed, and Loss of SDC AOP, 2203.029, completed up t o step 13.C TASK STANDARD:

SDC restored per Loss of SDC AOP, 2203.029.

TASK PERFORMANCE AIDS:

Loss of SDC AOP, 2203.029

SIMULATOR SETUP

Mode 5, SDC aligned for the "A" LPSI Pump through the "A" SDC Heat Exchanger.

2P-60 A & B secured, All LPSI Injection MOVs are OPEN, and 2CV

-5086-2 is CLOSED.

ACI actuation clear due to de

-energizing 2PS

-4623-2 by fuse removal.

JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 3 OF 5 JOB PERFORMANCE MEASURE INITIATING CUE:

Th e SM/CRS directs, "The fuse has been removed for 2PI

-4623-2, Restore Shutdown Cooling Flow I.A.W. AOP 2203.029 beginning with step 13.C." CRITICAL ELEMENTS (C): 2, 5, 6, 8, 9

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify SDC RCS isola tion valves open.

POSITIVE CUE:

Red lights ON; green lights OFF.

On panels 2C16 and 2C17, checked indications for:

- 2CV-5038-1 - 2CV-5084-1 - 2CV-5086-2 Observed 2CV

-5086-2 closed by green light ON, red light OFF above

handswitch.

N/A SAT UNSA T (C) 2. Determine that 2CV

-5086-2 is shut due to the Auto

-Closure Initiation (ACI) and Open 2CV-5086-2. POSITIVE CUE:

Red light ON; green light OFF On panel 2C16, placed handswitch for 2CV

-5086-2 to "OPEN". Observed red light ON

green light OFF above handswitch.

N/A SAT UNSAT

4. Check SDC pump running.

On 2C17, determined That no SDC pumps are running.

Observed 2C

-16 and 2C-17 that 2P-60 A & B were secured. Observed green light ON; red

light OFF above handswitches.

N/A SAT UNSAT

JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 4 OF 5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 5. Close ALL LPSI Injection MOVs. POSITIVE CUE:

Green lights ON; red lights OFF. On 2C16 & 17, placed handswitches for Safety

Injection MOVs to "CLOSE".

2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Observed green light ON; red

li ght OFF above Handswitch for all valves.

N/A SAT UNSAT (C) 6. B. Open ONE LPSI Injection MOV 10%.

On 2C-16 or 17, throttled open 1 LPSI Injection MOV 10%.

2CV-5017-1 2CV-5037-1 2CV-5057-2 2CV-5077-2 Operated 1 LPSI Injection MOV Handswitch until po sition indicator shows ~ 10%.

Observed green and red light

ON and position indicator at

10% above handswitch.

N/A SAT UNSAT

7. Verify RCS level adequate; refer to Attachment A, RCS Level.

Referred to Attachment "A" and verified RCS Level

adequate for SDC Pump restart. N/A SAT UNSAT NOTE: If 2CV-5091 is not in Automatic, the candidate may have to transverse from 2C

-16 & 17 back to 2C

-04 multiple times to control flow. 2CV

-5091 should be monitored to ensure that it has control of flow when plac ed in automatic.

(C) 8. D. Start SDC pump; refer to 2104.004, Shutdown

Cooling System.

On 2C17 placed handswitch for 2P-60A to "START".

Observed red light ON; green

light OFF above handswitch.

N/A SAT UNSAT

JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 5 OF 5 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 9. Raise SDC flow to greater than 24 00 gpm by opening LPSI Injection MOVs.

On 2C-16 & 17 placed hand

-switches for Safety Injection MOVs to "OPEN) as necessary

to achieve > 2400 gpm flow.

2FIC-5091 indicates > 2400 gpm. N/A SAT UNSAT

10. Control RCS cool down rate within TS limits; r efer to 2202.010, Standard Attachments, Attachment

8, RCS Cool down Table.

On 2C04 adjusted 2HIC

-5093, SDC Temperature Controller as necessary.

N/A SAT UNSAT END JPM- ANO-2-JPM-RO-EOP02 REV. 0 PAGE 6 OF 5 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:

Loss of Shutdown Cooling AOP, 22 03.029, has been entered due to 2PS-4623-2 failing "High". The resulting ACI caused 2CV

-5086-2 to close. The "A" SDC pump was secured and AOP completed up to step 13.C.

INITIATING CUE:

The SM/CRS directs, "The fuse has been removed for 2PI

-4623-2, Resto re Shutdown Cooling Flow I.A.W. AOP 2203.029 beginning with step 13.C."

JPM- ANO-2-JPM-RO-EFW JOB PERFORMANCE MEASURE UNIT: 2 REV #: 7 DATE: 14 July 2003 SYSTEM/DUTY AREA:

Heat removal from core, EFW system TASK: Local/manual start of Turbine driven EFW pump JTA#: 20015130101 KA VALUE RO: 3.5 SR O: 3.9 KA

REFERENCE:

001 A4.10 APPROVED FOR ADMINISTRATION TO: RO:

X SRO: X TASK LOCATION: INSIDE CR:

X OUTSIDE CR:

BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform Perform LAB:

POSITION EV ALUATED: RO: SRO: ACTUAL TESTING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD: SIMULATE:

PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

20 minutes REFERENCE (S):

Procedure 2106.006 EMERGENCY FEEDWATER SYSTEM OPERATIONS EXAMI NEE'S NAME:

SSN:

-

- .

EVALUATOR'S NAME:

.

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time:

Stop Time:

Total Time:

.

SIGNED__________________________________

DAT E: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE

PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

JOB PERFORMANCE MEASURE Initial Conditions:

The plant has suffered a los s of all feed water. It is necessary to perform a local start of the EFW pump to restore feed water flow to the Steam generators.

JOB PERFORMANCE MEASURE INITIATING CUE:

The SS/CRS directs, "Perform a local manual startup of 2P

-7A EFW pump using Procedure 2106.006. Attachments A and C of Procedure 2106.006 have been completed" CRITICAL ELEMENTS (C):

1e,1f, 5, 6, 10, 12

7.1 Align

system using Attachment A and Attachment C of this procedure.

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify 2P-7A al igned using Section 7.0 of this procedure Performs checks IAW section 7.0 (steps a through I)
a. Verify Condensate Suction valve 2CV-0795-2 open Condensate Suction valve 2CV-0795-2 open N/A SAT UNSAT
b. Verify EFW Discharge valve 2CV

-1037-1 open EFW Discharge valve 2CV

-1037-1 open N/A SAT UNSAT

c. Verify Service Water Suction valve 2CV-0711-2 closed Service Water Suction valve 2CV-0711-2 closed N/A SAT UNSAT
d. Verify EFW Discharge valve 2CV

-1026-2 closed EFW Discharge valve 2CV

-1026-2 clo sed N/A SAT UNSAT

e. (C) Verify 2P-7A Speed controller (2HIC-0336-2) set at 100%.

2P-7A Speed controller (2HIC

-0336-2) set at 100%.

N/A SAT UNSAT

f. (C) Verify EFW pump (2P

-7A AND 2P-7B) bearing oil levels within 1/4 inch of line on Oil Level indic ating plate.

EFW pump (2P

-7A AND 2P-7B) bearing oil levels within 1/4 inch of line on Oil Level

indicating plate.

N/A SAT UNSAT

g. Check EFW pump Turbine (2K

-3) inboard bearing oil level between low and high marks on 2LI

-0315. EFW pump Turbine (2K

-3) i nboard bearing oil level between low and high marks on 2LI-0315. N/A SAT UNSAT

h. Check 2P-7B motor oil

> 1/4 full in bulls-eye sight glass. (pump is operable with any oil in sightglass).

2P-7B motor oil

> 1/4 full in bulls-eye sight glass.

N/A SAT UNSAT i. IF oil is needed for 2K

-3 or 2P-7B motor, THEN submit MAI Examinee states that MAI is not needed.

N/A SAT UNSAT This completes the system alignment

2. Notify Chemistry to perform the following:
  • Take required EFW samples. (CR-ANO-2-1999-0324)
  • Sample Main Steam as needed to accommodate effluent release calculations. (CR

-ANO-2-1999-0324 Chemistry notified.

N/A SAT UNSAT

3. 3 IF plant power < 10%, AND use of SU/BD DI Cond Return Header as suction source

desired, AND FW Htr 2E7A Cond Inlet Temp (T0606) is

< 140°F, THEN verify open EFW Suction (2EFW-0706). Checks plant power and contacts control to determine

if use of SU/BD DI Cond

Return Header as suction source desired.

Cue: Use of use of SU/BD DI

Cond Return Header as

suction source is not desired.

N/A SAT UNSAT

4. IF in Mode 1, 2 or 3, THEN enter Tech Spec 3.7.1.2.

N/A SAT UNSAT

5. (C) Close 2P-7A Trip Throttle valve.

2P-7A Trip Throttle valve closed N/A SAT UNSAT

6. (C) Open Steam Supply valve (2CV

-0340-2). Steam Supply valve (2CV

-0340-2) opened.

N/A SAT UNSAT

7. Record time 2CV

-0340-2 opened in Control Room log.

Time 2CV-0340-2 opened recorded in Control Room log N/A SAT UNSAT

8. Check Turbine Bearing Cooling Water Supply valve (2SV

-0317-2) opens Turbine Bearing Cool ing Water Supply valve (2SV

-0317-2) checked open.

N/A SAT UNSAT

9. Slowly open 2P

-7A Trip Throttle valve to obtain desired RPM or discharge pressure.

2P-7A Trip Throttle valve opened. Desired RPM or discharge pressure obtained.

N/A SAT UNSAT CAUTION 2P-7A will trip on over speed between 4420 and 4520 RPM.

Examiner: Venting of the control oil system is desired, examinee should perform the following:

10. (C) Adjust 2P-7A Speed controller (2HIC-0336-2) to 50%.

2P-7A Speed controller (2HIC

-0336-2) adjus ted to 50%.

N/A SAT UNSAT

11. Throttle closed 2P

-7A Trip Throttle valve until governor valve is fully extended (full open) 2P-7A Trip Throttle valve throttled closed until governor valve is fully extended (full open) N/A SAT UNSAT

12. (C) Slowly open Trip Throttle valve until governor valve fully retracts Trip Throttle valve opened slowly until governor valve is

fully retracted N/A SAT UNSAT

13. Repeat above steps as desired to fully vent control oil system Repeat above as necessary until syste m properly vented.

N/A SAT UNSAT

14. WHEN venting operations are complete, THEN return 2HIC

-0336-2 to 100% while maintaining desired RPM or discharge pressure

using Trip Throttle valve.

2HIC-0336-2 returned to 100%

with desired RPM or discharge pressure maintained using Trip Throttle valve.

N/A SAT UNSAT

15. JPM completed

TS 3.7.1.2 EMERGENCY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 Two emergency feed water pumps and associated flow paths shall be OPERABLE with:

a. One motor driven pump capable of being powered from an OPERABLE emergency bus, and
b. One turbine driven pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3 ACTION: With one emergency feed water pump inoperable, resto re the inoperable pump to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.1.2 Each emergency feed water pump shall be demonstrated OPERABLE:

a. At least once per 31 days by:
1. Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.
b. In accordance with the Inservice Testing Program by:
1. Verifying the developed head of each EFW pump at the flow test point is greater than or equal to the required developed head.

This surveillance requirement is not required to be performed for the turbine driven EFW pump until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after exceeding 700 psia in the steam generators.

c. At least once per 18 months by:
1. Verifying that each automatic valve in the flow path actuates to its correct position on MSIS or EFAS test signals.
2. Verifying that the motor driven pump starts automatically upon receipt of an EFAS test signal.
3. Verifying tha t the turbine driven pump steam supply MOV opens automatically upon receipt of an EFAS test signal.
d. By verifying proper alignment of the required EFW flow paths by verifying flow from the condensate storage tank to each steam generator. This SR is requi red to be verified prior to entering MODE 2 whenever plant has been in MODES 4, 5, 6, or defueled for

> 30 days.

JPM- ANO-2-JPM-RO-RCP02 PAGE 1 OF 6 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 4 DATE:

. SYSTEM/DUTY AREA:

Abnormal/Emergency Operations

TASK: Restore component cooling water to reactor coolant pumps (Alternate Success Path)

JTA#: 20085180401

KA VALUE RO:

3.3 SRO:

3.1 KA

REFERENCE:

008 A4.01

APPROVED FO R ADMINISTRATION TO: RO:

X SRO:

X

TASK LOCATION: INSIDE CR:

X OUTSIDE CR:

BOTH:

SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

SIMULATOR:

Perform LAB:

.

POSITION EVALUATED: RO:

SRO:

.

ACTUAL TESTING ENVIRONMENT: SIMULATOR:

PLANT SITE:

LAB:

.

TESTING METHOD: SIMULATE:

PERFORM:

.

APPROXIMATE COMPLETION TIME IN MINUTES:

15 minutes

REFERENCE(S):

EOP 2202.010

EXAMINEE'S NAME:

SSN: -

-

.

EVALUATOR'S NAME:

.

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM

AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

.

PERFORMANCE CHECKLIST COMMENTS:

.

.

Start Time

Stop Time Total Time

SIGNED__________________________________

DATE: _____________________

SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED

INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT R EVISION.

JPM- ANO-2-JPM-RO-RCP02 PAGE 2 OF 6 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

2A1, 2A2, are re

-energized from SU#2 following a degraded power situation.

2202.010 ATT. 29 steps up to 1.n have been completed. Power to CCW pumps has been restored.

TASK STANDARD:

Controlled bled off isolated to VCT and CBO relief valve isolated.

TASK PERFORMANCE AIDS:

EOP 2202.010 Attachment 21

SIMULATOR INITIAL CONDITIONS

Set up CCW valves per EOP 2202.010 Attachment 29 "STARTUP XFM# 2

USAGE" perform actions through step 1.n. Close RCP CCW RETURN valve, 2CV

-5255-1, 2CV-5254-2 and 2CV-5236-1. NO SIAS actuation.

Run case file JPM07 This will do the following:

Set T4 = ccwrcp (this will trigger T4 when 2CV 5255 red light is energi zed).

When 2CV 5255

-1 is taken to open position, it will trip the breaker

T4=2HS-5255-1_R false (override)

T4=2HS-525 5-1_G false (override)

T4=2CV5255

-1_a = 0.0% (component malfunction)

JPM- ANO-2-JPM-RO-RCP02 PAGE 3 OF 6 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS directs, "Restore CCW to the RCP's using EOP 2202.010 Attachment 21."

CRITICAL ELEMENTS (C):

3, 4, 5 , 6, 7, 11, 12

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify RCP bleedoff to VCT valves

open.

POSITIVE CUE:

For 2CV-4846-1 red light ON and For 2CV-4847-2 red light ON.

On panel 2C16 verified 2CV

-4847-2 red light on; control sw itch in OPEN.

On panel 2C17, verified 2CV

-4846-1 red light on; control switch in OPEN.

N/A SAT UNSAT

2. Verify RCP Bleedoff Relief Isolation to Quench Tank open.

POSITIVE CUE:

For 2CV-4856 red light ON On panel 2C09, verified 2CV

-4856 red light on; keyswitch in LOCKED OPEN. N/A SAT UNSAT (C) 3. Determine RCP Seal temperature

and status of Loop II CCW pump.

POSITIVE CUE:

RCP seal temperatures are > 180°F

and one CCW pump is running on

Loop II. On panel 2C14 or on PMS computer, determined RCP seal temperatures.

On 2C14, observed running

indication for one Loop II CCW

pump and Loop II flow.

N/A SAT UNSAT (C) 4. Verify RCP CCW Return valve

(2CV-5255-1) CLOSED.

POSITIVE CUE:

Green light ON.

On panel 2C17, verified 2CV

-5255-1 closed.

Obser ved green light ON; red light OFF above handswitch.

N/A SAT UNSAT (C) 5. Open RCP CCW Supply valve

(2CV-5236-1).

POSITIVE CUE:

Red light ON.

On panel 2C17, placed handswitch

for 2CV-5236-1 in "OPEN".

Observed green light OFF; red light

ON. N/A SAT UNSAT (C) 6. Open RCP CCW Return valve

(2CV-5254-2).

POSITIVE CUE:

Red light ON.

On panel 2C16, placed handswitch

for 2CV-5254-2 in "OPEN".

Observed green light OFF; red light

ON. N/A SAT UNSAT

JPM- ANO-2-JPM-RO-RCP02 PAGE 4 OF 6 JOB PERFORMANCE MEASURE EXAMINER'S NOTE:

When 2CV-5255-1 is taken to OPEN, the breaker will trip and cannot be reset. The valve will be stuck closed.

(C) 7. Modulate RCP CCW Return valve (2CV-5255-1) OPEN.

POSITIVE CUES:

Red and green lights OFF.

If WCO sent to the valve; 2CV-5255-1 cannot be opened.

If AO sent to the breaker, 2B53

-G4; the breaker for 2CV

-5255-1 cannot be reset. On panel 2C17, took handswitch for

2CV-5255-1 to "OPEN" for one (1) second then released.

Observed red and green lights OFF.

EXAMINEE may ask to dispatch a NLO to the valve and or breaker.

N/A SAT UNSAT EXAMINER'S NOTE:

The examinee may elect to monitor RCP seal cooldown before making the decision that CCW cannot be restored. This

monitoring of RCP seal cooldown may take 10 minutes to validate that 2CV

-5255-1 did not open.

The examinee should go to step 4 of Attachment 21.

8. Verify ALL RCP's secured.

POSITIVE CUE:

Green light ON and Red light OFF

for 2P32 A, B, C, D.

On panel 2C04, observed 2P32A, B, C, and D RCP handswitches in

STOP or PTL.

Observed handswitch is green flagged; gr een light ON and red light OFF.

N/A SAT UNSAT

9. Close 2CV-5254-2.

POSITIVE CUE:

Green light ON.

On panel 2C16, placed handswitch

for 2CV-5254-2 to "CLOSE"

Observed green light ON; red light

OFF. N/A SAT UNSAT

10. Close 2CV-5236-1.

POSITI VE CUE: Green light ON.

On panel 2C17, placed handswitch

for 2CV-5236-1 to "CLOSE"

Observed green light ON; red light

OFF. N/A SAT UNSAT

JPM- ANO-2-JPM-RO-RCP02 PAGE 5 OF 6 JOB PERFORMANCE MEASURE (C) 11. Close RCP bleedoff to VCT valves.

POSITIVE CUE:

For 2CV-4846-1 green light ON and For 2CV-4847-2 gree n light ON.

On panel 2C17, placed handswitch

for 2CV-4846-1 to "CLOSE."

On panel 2C16, placed handswitch for 2CV-4847-2 to "CLOSE."

For each valve, observed green light

ON; red light OFF.

N/A SAT UNSAT (C) 12. Close RCP bleedoff relief isolation

t o quench tank valve (2CV

-4856).

POSITIVE CUE:

Green light ON.

On panel 2C09, placed handswitch

for 2CV-4856 to "CLOSE"

Observed green light ON; red light

OFF. N/A SAT UNSAT END JPM- ANO-2-JPM-RO-RCP02 PAGE 6 OF 6 JOB PERFORMANCE MEASURE EXAMINEE'S COPY

JPM INITIAL TASK CONDITIONS:

2A1, 2A2, are re

-energized from SU#2 following a degraded power situation.

2202.010 ATT. 29 steps up to 1.n have been completed.

Power to CCW pumps has been restored.

INITIATING CUE:

The SM/CRS directs, "Restore CCW to the RCP's using EOP 2202.010 Attachment 21."

ANO-2-JPM-NRC-2RS4A PAGE 1 of 11 2 REV #: 000 DATE: SYSTEM/DUTY AREA:

AC Electrical Distribution TASK: Perform A Startup Of 2Y2224, Swing Inverter For 2RS4 (Alternate Success Path)

JTA#: ANO2AO120ACNORM5 KA VALUE RO: 3.4 SRO: 3.9 KA

REFERENCE:

062 A2.01 APPROVED F OR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB: POSITION EVALUATED:

RO: SRO: ACTUAL TES TING ENVIRONMENT:

SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE (S):

2107.003 and 2107.001 supplement 4.

EXAMINEE'S NAME:

SSN: EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE I NDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-NRC-2RS4A PAGE 2 of 11

THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checkli st - System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. Unit is in Mode 1.
2. 2Y2224 is shut down.
3. 2RS4 is being supplied by Inverter 2Y24 Normal Source. TASK STANDARD:
1. 2Y2224 Alternate Source is supplying 120VAC Vital Bus 2RS4 in accordance with OP 2107.003, Attachment J, Section 1.
2. Procedure was halted when examinee was prompted of the Low Inverter Voltage Alarm.
3. Examinee did not place 2Y2224 on normal source with low inverter voltage.

TASK PERFORMANCE AIDS:

2107.003 Attachment J, Section 1 2107.001 Supplement 4, Table 11 SIMULATOR SETUP:

NONE ANO-2-JPM-NRC-2RS4A PAGE 3 of 11 INITIATING CUE:

The SM/CRS directs you to, "

Place 2Y2224 in service with the inverter supplying 2RS4 and shutdown 2Y24 using 2107.003, Attachment J Section 1 and 2107.001 Supp. 4 Table 11

." CRITICAL ELEMENTS (C):

9, 12, 13, 20, 27, 30, 31 START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verify Battery INPUT breaker (B1) OPEN POSITIVE CUE:

B1 handle is in the DOWN position At 2Y2224, verified B1 OPEN Observed B1 handle in the DOWN position N/A SAT UNSAT

2. Ver ify INVERTER OUTPUT BREAKER (B2) OPEN POSITIVE CUE:

B2 handle is in the DOWN position At 2Y2224, verified B2 OPEN.

Observing B2 handle in the DOWN position N/A SAT UNSAT

3. Verify ALTERNATE SOURCE INPUT breaker (B800) OPEN POSITIVE CUE:

B800 hand le is in the DOWN position At 2Y2224, verified B800 OPEN Observed B800 handle in the DOWN position N/A SAT UNSAT

4. Verify MANUAL BYPASS SWITCH (2HS9601) in

ALTERNATE SOURCE

POSITION POSITIVE CUE:

MANUAL BYPASS SWITCH (2HS9601) in ALTERNATE

SOURCE POSITION At 2Y2224, observed MANUAL BYPASS SWITCH (2HS9601) in

ALTERNATE SOURCE

POSITION N/A SAT UNSAT

ANO-2-JPM-NRC-2RS4A PAGE 4 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

5. Verify Manual OUTPUT TRANSFER SWITCH (2HS

-9504) at top of panel in 2Y2224 to 2RS4 position.

POSITIVE CUE:

Manual OUTPUT TRANSFER SWITCH (2HS

-9504) at top of panel is in 2Y2224 to 2RS4 position. At 2Y2224, verified Manual OUTPUT TRANSFER SWITCH

(2HS-9504) at top of panel in 2Y2224 to 2RS4 position.

N/A SAT UNSAT

6. Check 2Y2224 To 2RS4 light on. POSITIVE CUE:

2Y2224 To 2RS4 light on At 2Y2224, observed 2Y2224 To 2RS4 light on N/A SAT UNSAT

7. Check 2D12 battery bank connected to 2D02 bus.

POSITIVE CUE:

The 2D12 NOT AVAILABLE alarm is not in.

Called the Control Room to verify the 2D12 NOT AVAILABLE alarm

is not in.

N/A SAT UNS AT 8. Check the in

-service battery charger (2D32A/2D32B) on float. POSITIVE CUE:

1. The float lamp for the in

-service battery charger is lit. OR The in-service battery charger DC voltage is ~130 VDC. 2. Battery charger has been on float for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Checked the float lamp illuminated for the in

-service battery charger.

OR Checked the in

-service battery charger DC voltage ~130 VDC.

AND Contacted the Control room to verify that battery changer has

been on float for greater than 24

hours. N/A SAT UNSAT

ANO-2-JPM-NRC-2RS4A PAGE 5 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 9. Close Battery INPUT breaker (B1) POSITIVE CUE:

Battery Input breaker (B1) is in the UP position.

At 2Y2224, closed B1 by moving its handle in UP direction Observed B1 operating handle remained in the UP position N/A SAT UNSAT

10. Check 2Y2224 1 25 VDC INVERTER INPUT (V1) reading

~125 VDC POSITIVE CUE:

2Y2224 125 VDC INVERTER INPUT (V1) reading ~125 VDC At 2Y2224 checked 2Y2224 125 VDC INVERTER INPUT (V1)

reading ~125 VDC N/A SAT UNSAT Instructor Note:

Procedure step 1.2.11 will be NA due to voltage being indicated in step 1.2.10.

11. Wait 60 seconds POSITIVE CUE:

60 seconds has elapsed At 2Y2224, verified 60 seconds elapsed N/A SAT UNSAT (C) 12. Close 2Y2224 INVERTER OUTPUT breaker (B2)

POSITIVE CUE:

2Y2224 INVERTER OUTPUT break er (B2) handle is in the UP position.

At 2Y2224, closed 2Y2224 INVERTER OUTPUT breaker (B2) by raising its handle in UP

direction N/A SAT UNSAT (C) 13. Close 2Y2224 ALTERNATE SOURCE INPUT breaker (B800) POSITIVE CUE:

2Y2224 ALTERNATE SOURCE INPUT breaker (B800) handle is in the UP position At 2Y2224, closed 2Y2224 ALTERNATE SOURCE INPUT

breaker (B800) by raising its

handle in the UP direction N/A SAT UNSAT

ANO-2-JPM-NRC-2RS4A PAGE 6 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

14. Check 2Y2224 120 VAC ALTERNATE SOURCE Volt

Meter (V3) reading ~120 VAC.

POSITIVE CUE: 2Y2224 120 VAC ALTERNATE SOURCE Volt Meter (V3) reads

~120 VAC. At 2Y2224, observed 2Y2224 120 VAC ALTERNATE SOURCE

Volt Meter (V3) reading ~120

VAC. N/A SAT UNSAT Instructor Note:

Procedure step 1.2.16 will be NA due to voltage being indicate d in step 1.2.15.

15. Verify 2Y2224 ALTERNATE SOURCE Supplying Load light

is on. POSITIVE CUE:

Amber 2Y2224 ALTERNATE SOURCE Supplying Load light

is on. At 2Y2224, verified amber 2Y2224 ALTERNATE SOURCE

Supplying Load light is on.

N/A SAT UNSAT 1 6. Check 2Y2224 120 VAC OUTPUT Volt Meter (V2)

reading ~120 VAC.

POSITIVE CUE:

2Y2224 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.

At 2Y2224, observed 2Y2224 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.

N/A SAT UNSAT

17. Check 2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.

POSITIVE CUE:

2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.

At 2Y2224, observed 2Y2224 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.

N/A SAT UNSAT Instructor Note

¨ Examinee is now switching to anothe r inverter, 2Y24

¨ Examinee will transfer this inverter to Alternate Source

ANO-2-JPM-NRC-2RS4A PAGE 7 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

18. Check 2Y24 INVERTER IN SYNC light is on.

POSITIVE CUE:

The green 2Y24 INVERTER IN SYNC light is on.

AT 2Y24 observed the green 2Y24 INVERTER IN SYNC light

is on. N/A SAT UNSAT Instructor Note:

Procedure step 1.3.2 will be NA due to Inverter In Syc lamp being lit in step 1.3.1.

19. Enter 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> administrative time clock per Supplement 4 of

Electrical System Operations

(2107.001) for operation with

2RS4 panel powered fr om alternate source.

POSITIVE CUE:

Acknowledge 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> administrative time clock per

Supplement 4 of Electrical

System Operations Operator overtly demonstrates the acknowledgement of the 24

hour administrative time clock

per Supplement 4 of Electrical

Sy stem Operations (2107.001) for operation with 2RS4 panel powered from alternate source.

N/A SAT UNSAT (C) 20. Depress 2Y24 ALTERNATE SOURCE TO LOAD pushbutton

(2PB-9402). POSITIVE CUE:

2Y24 ALTERNATE SOURCE TO LOAD pushbutton (2PB

-9402) is depressed.

At 2Y24, depressed 2Y24 ALTERNATE SOURCE TO LOAD

pushbutton (2PB

-9402). N/A SAT UNSAT

21. Check 2Y24 ALTERNATE SOURCE SUPPLYING LOAD

light comes ON.

POSITIVE CUE:

The amber 2Y24 ALTERNATE SOURCE SUPPLYING LOAD

light comes ON.

At 2Y24, observed t he amber 2Y24 ALTERNATE SOURCE SUPPLYING LOAD light comes

ON. N/A SAT UNSAT

ANO-2-JPM-NRC-2RS4A PAGE 8 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

22. Check 2Y24 INVERTER SUPPLYING LOAD light is

OFF. POSITIVE CUE:

The green 2Y24 INVERTER SUPPLYING LOAD light is

OFF. At 2Y24, observed the green 2Y24 INVERTER SUPPLYING

LOAD light is OFF N/A SAT UNSAT

23. Place the 2Y24 MANUAL BYPASS SWITCH (2HS

-9801) in the ALTERNATE SOURCE position. POSITIVE CUE:

The 2Y24 MANUAL BYPASS SWITCH (2HS

-9801) is in the ALTERNATE SOURCE position.

At 2Y24, rotated the 2Y24 MANUAL BYPAS S SWITCH (2HS-9801) to the ALTERNATE SOURCE position.

N/A SAT UNSAT

24. Check 2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120

VAC. POSITIVE CUE:

2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.

At 2Y24, observed 2Y24 120 VAC OUTPUT Volt Meter (V2) reading ~120 VAC.

N/A SAT UNSAT

25. Check 2Y24 OUTPUT FREQUENCY Meter (E1)

reading ~60 Hertz.

POSITIVE CUE:

2Y24 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.

At 2Y24, observed 2Y24 OUTPUT FREQUENCY Meter (E1) reading ~60 Hertz.

N/A SAT UNSAT ANO-2-JPM-NRC-2RS4A PAGE 9 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

26. Verify the STATIC SWITCH TRANSFERRED alarm is IN

alarm. POSITIVE CUE:

The STATIC SWITCH TRANSFERRED alarm is IN

alarm on 2Y2224.

At 2Y2224, verify the STATIC SWITCH TRANSFERRED alarm

is IN alarm.

N/A SAT UNSAT (C) 27. At 2Y24, place man ual 2RS4 TRANSFER SWITCH (2HS

-9602) at top of panel in the 2Y2224 To 2RS4 position.

POSITIVE CUE:

Manual 2RS4 TRANSFER SWITCH (2HS

-9602) at top of panel is in the 2Y2224 To 2RS4 position. At 2Y24, rotated the Manual 2RS4 TRANSFER SWITCH

(2HS-9602) at top of panel to the 2Y2224 To 2RS4 position.

N/A SAT UNSAT

28. Check the 2Y2224 To 2RS4 light comes on.

POSITIVE CUE:

The 2Y2224 To 2RS4 light is on. At 2Y24, observed the 2Y2224 To 2RS4 light comes on.

N/A SAT UNSAT Instructor Note

¨ Examinee is now switching to another inverter, 2Y2224.

¨ Examinee will take steps to transfer this inverter to NORMAL SOURCE.

29. Check 2Y2224 INVERTER IN SYNC light is on.

POSITIVE CUE:

The green 2Y2224 INVERTER IN SYNC light is on.

AT 2Y2224 observed the green 2Y2 224 INVERTER IN SYNC light is on.

N/A SAT UNSAT Instructor Note:

Procedure step 1.4.2 will be NA due to INVERTER IN SYNC lamp being lit in step 1.4.1.

ANO-2-JPM-NRC-2RS4A PAGE 10 of 11 PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 30. Place the Inverter 2Y2224 MANUAL BYPASS SWITCH

(2HS-9601) in the NORMAL SOURCE position.

POSITIVE CUE:

The Inverter 2Y2224 MANUAL BYPASS SWITCH (2HS

-9601) in the NORMAL SOURCE position. At 2Y2224, rotated the Inverter 2Y2224 MANUAL BYPASS

SWITCH (2HS

-9601) in the NORMAL SOURCE position.

N/A SAT UNSAT Instructor Note:

The following step is the alternate success path step. The examinee shall not transfer the inverter to the INVERTER SUPPLYING LOAD with the LOW INVERTER VOLTAGE alarm present. The examinee will stop the evolution and contact the control room for guidance.

(C) 31. Check all alarms clear except the STATIC SWITCH TRANSFER (ST/SW) alarm.

NEGATIVE CUE:

The following alarms are in:

  • LOW INVERTER VOLTAGE
  • STATIC SWITCH TRANSFER (ST/SW)

WHEN the examinee notifies the control room, THEN give the

following cue:

"Stop and report to the control room for a brief."

Examinee notified the control room of the abnormal indication.

N/A SAT UNSAT END STOP TIME:

ANO-2-JPM-NRC-2RS4A PAGE 11 of 11 EXAMINEE'S COPY

JPM INITIAL TASK CONDITIONS

1. 2Y2224 is shut down.
2. 2RS4 is being supplied by Inverter 2Y24 Normal Source.

INITIATING CUE:

The SM/CRS directs, "Place 2Y2224 in service supplying 2RS4 and shutdown 2Y24 using OP 2107.003, Attachment J Section 1 and OP 2107.001 Supp. 4 Table 11

."

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 57 of 92 CHANGE: 018-03-0 A TTACHMENT J PAGE 1 OF 13 INVERTER 2Y24 OPERATION This Attachment is used to transfer 2RS4 power supply between 2Y24 and 2Y2224 with

instructions to startup and shutdown the inverters. When transferring 2RS4 power

both inverters MUST be on ALTERNATE SOURCE. GO TO the appropriate section for instructions on performing the task desired.

1.0 SHIFTING

2RS4 POWER FROM 2Y24 TO 2Y2224

2.0 SHIFTING

2RS4 POWER FROM 2Y2224 TO 2Y24

3.0 SHIFTING

2RS4 POWER FROM 2Y24 NORMAL SOURCE TO 2Y24 ALTERNATE SOURCE AND SHUTDOWN OF INVERTER, IF DESIRED

4.0 SHIFTING

2RS4 POWER FROM 2Y24 ALTERNATE SOURCE TO 2Y24 NORMAL SOURCE 5.0 STARTUP OF 2Y24 INVERTER SECTION WITH 2RS4 SUPPLIED FROM 2Y24 ALTERNATE SOURCE AND SHIFTING 2RS4 TO 2Y24 NORMAL SOURCE 6.0 2Y24 STARTUP WITH 2RS4 DE

-ENERGI ZED CAUTION

  • After startup of a de

-energized inverter, "STATIC SWITCH TRANSFERRED" is only expected RIS Unit alarm. DO NOT transfer load to this inverter unless all other RIS Unit alarms are clear.

  • After startup of a de

-energized inverter, "INVERTER OUTP UT OVERVOLTAGE" alarm may briefly occur. This condition may exist for a few minutes to an hour depending on room temperature conditions. All load transfers SHALL

be halted until this condition clears.

(CR-ANO-2-2002-1138). 1.0 SHIFTING 2RS4 POWER FROM 2 Y24 TO 2Y2224 1.1 IF 2Y2224 is NOT shutdown, THEN perform the following to align to ALTERNATE SOURCE: 1.1.1 Check 2Y2224 INVERTER IN SYNC light is on.

1.1.2 IF INVERTER IN SYNC light is NOT on, THEN contact Electrical Maintenance for assistance.

1.1.3 Depress

2Y2224 ALT SOURCE TO LOAD pushbutton (2PB

-9504). 1.1.4 Check 2Y2224 ALT SOURCE SUPPLYING LOAD light on.

1.1.5 Check

2Y2224 INVERTER SUPPLYING LOAD light out.

1.1.6 Verify

2Y2224 MANUAL BYPASS SWITCH (2HS

-9601) in ALTERNATE SOURCE positi on. 1.1.7 Check 2Y2224 120 VAC OUTPUT voltage (V2) indicates

~ 120 volts. 1.1.8 Check 2Y2224 OUTPUT FREQUENCY (E1) is ~

60 Hz. 1.1.9 Verify OUTPUT TRANSFER SWITCH (2HS-9504) at top of panel placed in 2Y2224 TO 2RS4 position.

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 58 of 92 CHANGE: 018-03-0 1.1.10 Check 2Y2224 TO 2RS4 light comes on.

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 59 of 92 CHANGE: 018-03-0 ATTACHMENT J PAGE 2 OF 13 1.2 IF Swing Inverter 2Y2224 is shutdown, THEN start up 2Y2224 on ALTERNATE SOURCE as follows:

1.2.1 Verify

2Y2224 125 VDC INPUT breaker (B1) open.

1.2.2 Verify

2Y2224 120 VAC INVERTER OUTPUT breaker (B

2) open. 1.2.3 Verify 2Y2224 ALT SOURCE INPUT breaker (B800) open.

1.2.4 Verify

2Y2224 MANUAL BYPASS SWITCH (2HS

-9601) in ALTERNATE SOURCE position.

1.2.5 Verify

OUTPUT TRANSFER SWITCH (2HS

-9504) at top of panel in 2Y2224 TO 2RS4 position.

1.2.6 Ch eck 2Y2224 TO 2RS4 light on.

CAUTION Energizing off

-line inverter, while battery bank is disconnected from the DC bus or in-service battery charger is on equalize, will blow fuses on the on-line inverters.

1.2.7 Check

2D12 battery bank connected to 2D 02 bus. 1.2.8 Check in-service battery charger (2D32A/B) as follows:

  • Check battery charger on float.
  • Check battery charger has been on float > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

1.2.9 Close

2Y2224 125 VDC INPUT breaker (B1).

1.2.10 Check 2Y2224 125 VDC INVERTER INPUT (V1) re ading ~ 125 volts. 1.2.11 IF no voltage indicated, THEN verify 2Y2224 DC supply feeder (2D0231) closed AND "Fuse Blown" light NOT lit.

1.2.12 Wait 60 seconds for inverter to stabilize.

1.2.13 Close 2Y2224 120 VAC INVERTER OUTPUT breaker (B2).

1.2.1 4 Close 2Y2224 ALTERNATE SOURCE INPUT breaker (B800).

1.2.15 Check 2Y2224 120 VAC ALT SOURCE (V3) reading ~

120 volts. 1.2.16 IF no voltage indicated, THEN verify 2Y2224 ALTERNATE SOURCE Supply (2B61

-N4) closed. 1.2.17 Verify 2Y2224 ALT SOURCE SUPPL YING LOAD light is on.

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 60 of 92 CHANGE: 018-03-0 1.2.18 Check 2Y2224 120 VAC OUTPUT (V2) indicates ~

120 volts.

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 61 of 92 CHANGE: 018-03-0 ATTACHMENT J PAGE 3 OF 13

1.2.19 Check 2Y2224 OUTPUT FREQUENCY (E1) is ~

60 Hz. 1.3 IF 2RS4 is supplied from 2Y24 NORMAL SOURCE, THEN transfer 2RS4 to 2Y24 ALTER NATE SOURCE AND THEN to 2Y2224 ALTERNATE SOURCE as follows:

1.3.1 Check

2Y24 INVERTER IN SYNC light is on.

1.3.2 IF INVERTER IN SYNC light is NOT on, THEN contact Electrical Maintenance for assistance.

1.3.3 IF in Mode 1

-4, THEN enter 24-hour adminis trative time clock per Supplement 4 of Electrical System Operations (2107.001) for operation with 2RS4 panel powered from ALTERNATE SOURCE. 1.3.4 Depress 2Y24 ALT SOURCE TO LOAD pushbutton (2PB

-9402). 1.3.5 Check 2Y24 ALT SOURCE SUPPLYING LOAD light co mes on. 1.3.6 Check 2Y24 INVERTER SUPPLYING LOAD light goes out.

1.3.7 Place

2Y24 MANUAL BYPASS SWITCH (2HS

-9801) in ALTERNATE SOURCE position.

1.3.8 Check

2Y24 120 VAC OUTPUT voltage indicates ~

120 volts. 1.3.9 Check 2Y24 OUTPUT FREQUENCY (E1) is

~ 60 Hz. 1.3.10 WHEN ONLY "STATIC SWITCH TRANSFERRED" is in alarm on 2Y2224, THEN continue performance of this section.

(CR-ANO-2-2002-1138) 1.3.11 At 2Y24, place 2RS4 TRANSFER SWITCH (2HS

-9602) at top of panel in the 2Y2224 TO 2RS4 position.

1.3.12 At 2Y24, check 2Y2224 TO 2RS4 light comes on.

PROC./WORK PLAN NO.

2107.003 PROCEDURE/WORK PLAN TITLE: INVERTER AND 120 VAC ELECTRICAL SYSTEM O PERATION PA GE: 62 of 92 CHANGE: 018-03-0 ATTACHMENT J PAGE 4 OF 13 1.4 IF desired to shift 2RS4 loads to 2Y2224 NORMAL SOURCE, THEN perform the following:

1.4.1 Check

2Y2224 INVERTER IN SYNC light is on.

1.4.2 IF INVERTER IN SYNC light is NO T on, THEN contact Electrical Maintenance for assistance.

1.4.3 Place

Inverter 2Y2224 MANUAL BYPASS SWITCH (2HS

-9601) in NORMAL SOURCE position.

1.4.4 Check

all alarms clear except ST/SW Transfer.

1.4.5 Depress

2Y2224 INVERTER TO LOAD pushbutton (2PB

-9502). 1.4.6 Check 2Y2224 INVERTER SUPPLYING LOAD light comes on.

1.4.7 Check

2Y2224 ALT SOURCE SUPPLYING LOAD light goes out.

1.4.8 Reset

2Y2224 local alarm panel.

1.4.9 Check

2RS4 INVERTER TROUBLE (2K01

-G11) is cleared.

1.4.10 Verify 2RS4 ope rable by performing the necessary portions of Supplement 4 of 2107.001.

1.4.11 IF applicable, THEN exit 24-hour administrative time clock per Supplement 4 of 2107.001 for operation with 2RS4 panel powered from ALTERNATE SOURCE. 1.5 IF desired to shutdo wn 2Y24, THEN perform the following:

1.5.1 Open 2Y24 ALT SOURCE INPUT breaker (B800).

1.5.2 Open 2Y24 120 VAC INVERTER OUTPUT breaker (B2).

1.5.3 Open 2Y24 125 VDC INPUT breaker (B1).

PROC./WORK PLAN NO.

2107.001 PROCEDURE/WORK PLAN TITLE: ELECTRICAL SYSTEM OP ERATIONS PAGE: 129 of 169 CHANGE: 047-05-0 SUPPLEMENT 4 PAGE 12 OF 17 TABLE 10, 2RS2 SUPPLY INVERTER 2Y22 O R 2Y2224 (Circle one)

TEST QUANTITY MEASURED VALUE ACCEPTABLE NORMAL RANGE IS DATA WITHIN ACCEPTABLE NORMAL RANGE? 125 VDC Input Breaker (B1)

( ) if closed Closed YES NO 120 VAC Inverter Output (B2)

( ) if closed Closed YES NO Manual Bypa ss switch ( ) if in Normal Source Normal Source YES NO Inverter Supplying Load

( ) if Light On Light On (1)

YES NO 120 VAC Output V > 117V < 126V YES NO Inverter output voltage E2RS2 OR E2RS2RS4 (SPDS)

V > 105V < 137.5V YES NO Alt Source Status Z2Y22B OR Z2Y2224 (SPDS)

( ) if in Normal Normal YES NO TABLE 11, 2RS4 SUPPLY INVERTER 2Y24 OR 2Y2224 (Circle one)

TEST QUANTITY MEASURED VALUE ACCEPTABLE NORMAL RANGE IS DATA WITHIN ACCEPTABLE NORMAL RANGE? 125 VDC Inpu t Breaker (B1)

( ) if closed Closed YES NO 120 VAC Inverter Output (B2)

( ) if closed Closed YES NO Manual Bypass switch ( ) if in Normal Source Normal Source YES NO Inverter Supplying Load

( ) if Light On Light On (1)

YES NO 120 VAC Output V > 117V < 126V YES NO Inverter output voltage E2RS4 OR E2RS2RS4 (SPDS)

V > 105V < 137.5V YES NO Alt Source Status Z2Y24B OR Z2Y2224 (SPDS)

( ) if in Normal Normal YES NO (1) Alternate indications such as remote annunciator (2K01

- "2RSX INVERTER TROUBLE" NOT in alarm) OR local indication ("2YXX ALT SOURCE SUPPLYING LOAD" light out) may be used to verify Inverter supplying load.

(2) Voltage band defines RS Bus operability for steps 3.4.1/3.4.2 of this section (ULD-2-SYS-20, CR-ANO-2-2001-01134). (3) Voltage band defines DC Input voltage (ULD SYS-03). (2) (2) (3) (3)

ANO-2-JPM-NRC-SFPSW PAGE 1 OF 8 JOB PERFORMANCE MEASURE UNIT: 2 REV #: 001 DATE: SYSTEM/DUTY AREA:

Spent Fuel Pool Cooling System TASK: Add water to the Spent Fuel Pool (Alternate Success Path)

JTA#: ANO2WCOSFPEMER1 KA VALUE RO: 3.1 SRO: 3.5 KA

REFERENCE:

033 A2.03 APPROVED FOR ADMINIST RATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB: POSITION EVALUATED:

RO: SRO: ACTUAL TESTING ENVIRO NMENT: SIMULATOR:

PLANT SITE:

LAB: TESTING METHOD:

SIMULATE: PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

20 Minutes REFERENCE (S):

OP 2104.006 EXAMINEE'S NAME:

SSN: EVALUATOR'S NAME:

THE EXAMINEE'S PERFORMANCE WAS EVALUAT ED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time Stop Time Total Time SIGNED: DATE: SIGNATURE INDICATES THIS JPM HAS BEEN COMPARED TO ITS APPLICABLE PROCEDURE BY A QUALIFIED INDIVIDUAL (NOT THE EXAMINEE) AND IS CURRENT WITH THAT REVISION.

ANO-2-JPM-RO-SFPSW PAGE 2 OF 8 JOB PERFORMANCE MEASURE THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist:

1. Plant is in DEFUELED and all cask loading operations are secured.
2. Power has been lost to both SFP cooling pumps and 2K11

-K5 "FUE L POOL TEMP HI" is in alarm.

3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
4. SFP purification is out of service for replacement of 2FP

-10, SFP purification pump discharge.

5. Fuel Pool low level alarm is in and SFP level is lowering.

TASK STANDARD:

Emergency Spent Fuel Pool Makeup from Loop 2 Service Water has been initiated.

TASK PERFORMANCE AIDS:

OP 2104.006 Section 10 and 14 SIMULATOR SETUP:

NONE ANO-2-JPM-RO-SFPSW PAGE 3 OF 8 JOB PERFORMANCE MEASURE INITIATING CUE:

The SM/CRS di rects, "Align for makeup water addition to the SFP system from CVCS using OP 2104.006,"

Section 10.0 beginning with step 10.5" CRITICAL ELEMENTS (C

): 2, 3, 4, 5, 6, 8, 9, 11, 13

START TI ME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

1. Verified S pent Fuel Pool Purification Pump (2P66) secured. POSITIVE CUE:

Green light ON, red light OFF.

NEGATIVE CUE:

Red light ON, green light OFF.

Locally verified 2P66 handswitch (2HS-5411) in STOP and observed green light ON, red light OFF.

N/A SAT UNSAT TRANSITION NOTE:

Go to elevation 354' RAB, just north of the elevator, to the SFP valve gallery.

(C) 2. Verify RWT to Fuel Pool Isolation valve (2FP

-46) closed.

POSITIVE CUE:

2FP-32 stem inserted fully and valve is closed.

NEGATIVE CUE:

2FP-32 stem withd rawn fully and valve is open.

Verified 2FP

-46 Closed by observing stem fully inserted into the valve and rotating handwheel

counterclockwise.

N/A SAT UNSAT (C) 3. Verify Borated MU or RWT to 2P-66 (2FP-32) closed.

POSITIVE CUE:

2FP-32 stem is fu lly inserted.

NEGATIVE CUE:

2FP-32 stem withdrawn fully.

Verified 2FP

-32 CLOSED by observing valve stem fully inserted into the valve and rotating handwheel counterclockwise.

N/A SAT UNSAT TRANSITION NOTE:

Go to elevation 354' RAB VCT valve gallery.

ANO-2-JPM-RO-SFPSW PAGE 4 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 4. Close Makeup to Charging Pump Suction (2CVC

-83). POSITIVE CUE:

Resistance to operation indicated; valve position indicator aligned to

CLOSE. NEGATIVE CUE:

Valve position indicator in OPEN; or in an intermediate position.

Closed 2CVC

-83 by pulling o n right-hand side of chain (from the chain operator).

Observed valve closed position indication on valve reach rod

actuator. N/A SAT UNSAT (C) 5. Verify Manual Makeup to VCT (2CVC-68) closed.

POSITIVE CUE:

Resistance to operation indicated; valve po sition indicator aligned to CLOSE. NEGATIVE CUE:

Valve position indicator in OPEN; or in an intermediate position.

Attempted to rotate reach rod handwheel CW noting resistance

to motion.

Observed valve closed position indication on valve reach rod

actuat or. N/A SAT UNSAT TRANSITION NOTE:

Go to elevation 354' RAB spent fuel pool valve gallery just off elevator

. Examiner's NOTE:

This is the ALTERNATE SUCCESS PATH CUE step. 2CVC

-66 will not open and therefore CVCS system cannot be used to makeup to the SPF. A prompt will be given from the control room to use Loop 2 service water as makeup source.

(C) 6. Open MU to SF Pool (2CVC

-66). CUE: Valve stem full

-in and valve will not move. Attempted to open 2CVC

-66 by rotating handwheel CCW.

N/A SAT UNSA T

ANO-2-JPM-RO-SFPSW PAGE 5 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

7. Notify control room of inability to open 2CVC-66. CUE: Control room acknowledges that 2CVC-66 will not open and that section 14 of OP 2104.006, Fuel Pool Systems, should be used to

add Loop 2 service water to the

SFP starting with step 14.1.

Notifi ed the Control room of inability to open 2CVC

-66. N/A SAT UNSAT EXAMINER's NOTE:

Purification pump was previously identified as secured in initial conditions (Procedure step 14.1.1).

(C) 8. Close SW Header 2 Telltale Drain (2SW-1211). POSITIVE CUE

2SW-1211 has stem inserted into hand wheel.

Closed 2SW

-1211 by turning hand wheel Clockwise.

Observed valve stem fully inserted into the valve.

N/A SAT UNSAT TRANSITION NOTE:

Go to elevation 335' RAB just off elevator. Valve is chain operated and is located about 20' in overhead in middle of North / South corridor.

(C) 9. Open SW Header 2 Emergency Feed Isolation valve (2SW

-67). POSITIVE CUE:

2SW-67 chain will not rotate any more and valve is fully open.

NEGATIVE CUE:

2SW-67 is closed.

Opened 2SW

-67 by turning chain Counterclockwise until chain stopped rotating.

N/A SAT UNSAT TRANSITION NOTE:

Go to elevation 354' RAB spent fuel pool valve gallery just off elevator

. EXAMINER'S NOTE:

When asked for Category E key, simulate giving examinee key from the control room for valve 2SW 56.

ANO-2-JPM-RO-SFPSW PAGE 6 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

10. Ensure position of 2SW

-56 is logged in Category "E" Log.

POSITIVE CUE:

Valve position is logged in CAT 'E' log. Logged position of 2SW

-56 by: Using a plant telephone, Gaitronics, OR radio; contacted Control Room and directed entry in Category "E" Log. OR Ensured Category "E" log entry made upon completion of evolution.

N/A SAT UNSAT (C) 11. Open SW Header 2 Emergency Feed Isolation valve (2SW

-56). POSITIVE CUE:

2SW-56 valve stem is fully extended and valve is open.

NEGATIVE CUE:

2SW-56 valve stem is inserted and valve is closed Unlocked locking device on 2SW-56 using category 'E' valve key. Opened 2SW

-56 by turning handwheel CCW.

Observed valve stem fully withdrawn out of the valve.

N/A SAT UNSAT 12. Verify Operator in SFP to monitor level and is in communication with

Operator at SW Header 2

Emergency Feed Isolation to SF

Pool (2SW-62) POSITIVE CUE:

Operator in SFP responds to radio communications.

Verified that an Operator was stationed t o monitor SFP level and is in communication with Operator at SW Header 2 Emergency Feed

Isolation to SF Pool (2SW

-62) N/A SAT UNSAT EXAMINERS NOTE:

- Final valve position is at discretion of examinee to ensure level is raised/maintained.

ANO-2-JPM-RO-SFPSW PAGE 7 OF 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STANDARDS (Circle One)

(C) 13. T hrottles open SW Header 2 Emergency Feed Isolation valve to SF Pool (2SW

-62). POSITIVE CUE:

Operator stationed at SFP reports level rising slowly.

NEGATIVE CUE:

Operator reports NO change in SFP level.

Throttled open 2SW

-62 by turning handwheel CCW.

Obs erved valve stem withdrawn out of the valve commensurate with valves throttling.

N/A SAT UNSAT END STOP TIME:

ANO-2-JPM-RO-SFPSW PAGE 8 OF 8 JOB PERFORMANCE MEASURE EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS:

1. Plant is in DEFUELED and all cask loading operations are secured.
2. Power has been lost to both SFP cooling pumps.
3. An operator is stationed at the spent fuel pool to monitor Spent Fuel Pool Level.
4. SFP purification is out of service for replacement of 2FP

-10, SFP purification pump discharge.

5. Fuel Pool low l evel alarm is in and SFP level is lowering.

INITIATING CUE:

The SM/CRS directs, "Align for makeup water addition to the SFP system

from CVCS using OP 2104.006, Section 10.0 beginning with step 10.5"

PROC./WORK PLAN NO.

2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 10 of 101 CHA NGE:

  • When SFP level >

401'7", water may spill over throu gh pipe chase to 335' elevation due to starting/stopping SFP Cooling/Purification pumps.

  • SFP volume ~ 500 gal/inch.
  • SFP/Tilt Pit volume ~ 600 gal/inch (Tilt Pit gate not sealed/not installed).
  • SFP/CLP volume ~ 560 gal/inch (CLP gate not sealed/not installe d).
  • SFP/Tilt Pit/CLP volume ~ 660 gal/inch (Tilt Pit AND CLP gates not sealed/not installed).
  • SFP, Tilt Pit and Refueling Canal volume ~ 1650 gal/inch.
  • Coordinate with Dry Fuel personnel when making up during Dry Fuel Operations.

{4.3.2}

  • Steps marked with an
  • are continuous action steps.

10.1 IF Cask Loading Operations are in progress, THEN notify DFS Management of intent to add to SFP.

10.2 Calculate amount of boric acid or water needed to achieve desired fuel pool level and concentration using appropri ate attachment or Boron 2 Program.

10.3 Verify Chemical Addition portion of CVCS available.

10.4 Verify VCT Makeup Valve (2CV

-4941-2) closed.

10.5 IF Purification NOT in service OR is aligned to RWT, THEN verify the following:

10.5.1 Fuel Pool Purificatio n Pump (2P

-66) off. 10.5.2 RWT to Fuel Pool Isol (2FP

-46) closed.

10.5.3 Borated MU or RWT to 2P

-66 (2FP-32) closed.

10.6 Verify the following valves closed:

  • Manual Makeup to Charging Pump Suction (2CVC

-83)

  • Manual Makeup to VCT (2CVC

-68) 10.7 Verify the fo llowing valves open:

  • MU to SF Pool (2CVC

-66)

  • Borated MU to Fuel Pool (2CVC

-67)

  • Borated MU, RWT, SW to Fuel Pool (2FP

-31)

PROC./WORK PLAN NO.

2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 11 of 101 CHA NGE: 10.8 Station an Operator to monitor SFP level in communication with Control Room.

PROC./WORK PLAN NO.

2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 12 of 101 CHA NGE: *10.9 Monitor Reactor Power during makeup to Fuel Po ol in case 2CV-4941-2, 2CVC-68, or 2CVC

-83 has seat leakage.

10.10 Add calculated amounts of boric acid and water from CVCS by using the Boric Acid MU System in MANUAL as follows:

10.10.1 IF water is to be added, THEN perform the following:

A. Verif y either RMW pump (2P

-109A OR 2P

-109B) running. B. Set RMW Flow controller (2FIC

-4927) to desired flow. C. IF NO Boric Acid to be added, THEN verify Boric Acid MU Flow Controller (2FIC-4926) in MANUAL with OUTPUT DEMAND < zero.

10.10.2 IF Boric Acid is to be added, THEN perform the following:

A. Select desired BAM Pump (2P

-39A OR 2P-39B) for start using BAM Pump Select Switch (2HS

-4911-2). B. Start desired BAM Pump (2P

-39A OR 2P-39B). C. Open associated Recirc (2CV

-4903-2 OR 2CV-4915-2). D. Set Boric Acid M U Flow Controller (2FIC

-4926) to desired flow rate.

E. IF NO water to be added, THEN verify RMW Flow Controller (2FIC

-4927) in MANUAL with OUTPUT DEMAND < zero.

10.10.3 Reset Flow totalizers (2FQI

-4926 AND 2FQI-4927) to zero.

10.10.4 Place MU Mode Selecto r switch (2HS

-4928) to MANUAL.

10.10.5 Verify 2CV

-4926 AND 2CV-4927 respond properly.

10.11 WHEN the calculated amounts of boric acid and water have been added, THEN perform the following:

10.11.1 Reposition MU Mode Selector Switch (2HS

-4928) as desired. 10.11.2 Verify 2CV

-4927 closed.

10.11.3 Verify 2CV

-4926 closed.

10.11.4 Verify BAM Pumps secured.

10.11.5 Verify BAM Pump Recirc Valves closed.

10.11.6 Close Borated MU, RWT, SW to Fuel Pool (2FP

-31).

PROC./WORK PLAN NO.

2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 13 of 101 CHA NGE: 10.11.7 Close Borated MU to Fuel Pool (2CVC

-67). 10.1 1.8 Close MU to SF Pool (2CVC

-66). 10.11.9 Return 2FIC

-4927 AND 2FIC-4926 to desired settings.

10.12 Reposition the following as desired:

  • 2CVC-83 10.13 IF makeup for other than normal evaporation, THEN request Chemistry to sample SFP.

10.14 Align Purification System as desired using appropriate section of this procedure.

PROC./WORK PLAN NO.

2104.006 PROCEDURE/WORK PLAN TITLE: FUEL POOL SYSTEMS PAGE: 17 of 101 CHANGE: 14.0 EMERGENCY FUEL POOL MAKEUP FROM SERVICE WATER 14.1 IF desired to use Loop 2 SW to makeup to Fuel Pool, THEN perform the following:

14.1.1 IF SFP is aligned for Pu rification, THEN secure Fuel Pool Purification Pump (2P

-66) to prevent rapid depletion of Fuel Pool Demineralizer (2T-5). 14.1.2 Close SW Hdr 2 Telltale Drain (2SW

-1211). 14.1.3 Open SW Hdr 2 Emerg Feed Isol to Fuel Pool (2SW

-67). 14.1.4 Perform the follow ing: A. Record unlocking of SW Hdr 2 Emerg Feed Isol (2SW-56) in Cat E log.

B. Unlock and open 2SW

-56. 14.1.5 Station an Operator to monitor SFP level in communication with Operator at SW Hdr 2 Emerg Feed Isol to SFP (2SW

-62). 14.1.6 Throttle 2SW

-62 as necessary to maintain Fuel Pool level. 14.1.7 WHEN Service Water makeup no longer required, THEN secure as follows:

A. Close 2SW-62. B. Close and lock 2SW

-56. C. Close 2SW-67. D. Open 2SW-1211. E. Independently verify 2SW

-56 locked closed.

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 1 SYSTEM/DUTY AREA

Emergency & Abnormal Operations TASK: Perform local operation of proportional heaters JTA # : ANO2-RO-EOPAOP-OFFNORM-126 KA VALUE RO: 4.1 SRO: 4.2 KA

REFERENCE:

068 AA1.07 APPROVED FOR ADMINISTRATION TO:

RO: X SRO: X TASK LOCATION:

INSIDE CR:

OUTSIDE CR:

X BOTH: SUGGESTED TESTING ENVIRONMENT AND METHOD (PERFORM OR SIMULATE):

PLANT SITE:

Simulate SIMULATOR:

LAB: POSITION EVALUATED: RO: SRO:

ACTUAL TESTING ENVIRONMENT: SIMULATOR: PLANT SITE: LAB:

TESTING METHOD: SIMULATE:

PERFORM: APPROXIMATE COMPLETION TIME IN MINUTES:

15 minutes REFERENCE (S):

AOP 2203.014 Rev. 014 0, Alternate Shutdown EXAMINEE'S NAME:

SSN:

- - EVALUATOR'S NAME:

DATE:

THE EX AMINEE'S PERFORMANCE WAS EVALUATED AGAINST THE STANDARDS CONTAINED IN THIS JPM AND IS DETERMINED TO BE:

SATISFACTORY:

UNSATISFACTORY:

PERFORMANCE CHECKLIST COMMENTS:

Start Time:

Stop Time:

Total Time:

Signature indicates this JPM has been compared to its applicable procedure by a qualified individual (not the examinee) and is current with that revision.

SIGNED: DATE:

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 2 THE EXAMINER SHALL REVIEW THE FOLLOWING WITH THE EXAMINEE:

The examiner shall review the "Briefing Checklist

- System Walkthrough" portion of OP 1064.023 Attachment 6 with the examinee.

JPM INITIAL TASK CONDITIONS:

The following conditions exist.

1. A fire has occurred in the Control Room rendering the Control Room uninhabitable.
2. RCS pressure is 1840 p sia. 3. Pressurizer Level is 44%

TASK STANDARD:

Proportional heater control has been established locally at 2C117 and 2C118 and the heaters have been energized.

TASK PERFORMANCE AIDS:

AOP 2203.014, Alternate Shutdown, Attachment G.

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 3 INITIATING CUE:

Th e SM directs, "Energize pressurizer proportional heaters locally and raise pressurizer pressure to 2250 psia using AOP 2203.014, Attachment G.

CRITICAL ELEMENTS (C):

3, 4, 5, 6, 7

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 4

START TIME:

PERFORMANCE CHECKLIST STANDARDS (Circle One)

TRANSITION NOTE:

Go to the lower south electrical penetration room.

1. Verify "PZR PROP HTR CONT SW" (2HS-4640B) position.

POSITIVE CUE:

2HS-4640B indicates OFF.

On panel 2C117, verified 2HS

-4640B in OFF.

OR Placed 2HS

-4640B in OFF.

N/A SAT UNSAT 2. Verify "PZR PROP HTR CONT SW" (2HS-4641B) position.

POSITIVE CUE:

2HS-4641B indicates OFF.

On panel 2C118, verified 2HS

-4641B in OFF.

OR Placed 2HS

-4641B in OFF.

N/A SAT UNSAT (C) 3. Place "PZR PROP HTR SEL SW" (2HS-4640A) in E MERG. POSITIVE CUE:

2HS-4640A indicates EMERG. NEGATIVE CUE:

2HS-4640A indicates NORM.

On panel 2C117, verified key inserted in key switch.

Placed 2HS

-4640A in EMERG.

N/A SAT UNSAT

(C) 4. Place "PZR PROP HTR SEL SW" (2HS-4641A) in EMERG

. POSITIVE CUE:

2HS-4641A indicates EMERG. NEGATIVE CUE:

2HS-4641A indicates NORM.

On panel 2C118, verified key inserted in key switch.

Placed 2HS

-4641A in EMERG.

N/A SAT UNSAT TRANSITION NOTE:

Go to Load Center 2B5.

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 5 PERFORMANCE CHECKLIS T STANDARDS (Circle One)

Close breaker 2B523 "PRESSURIZER PROPORTIONAL HEATER 2SCR

-1". POSITIVE CUE:

Breaker 2B523 red flag showing. On load center 2B5, depressed breaker 2B523 "close" push button. OR On load center 2B5, raised the mechanical clos e lever for breaker 2B523.

N/A SAT UNSAT Note To Examiner:

1. The following breaker (2B623) is simulated to be open and will not close electrically.
2. This will require using the mechanical close lever.

(C) 6. Close breaker 2B623 "PRESSURIZ ER PROPORTIONAL HEATER 2SCR

-2". POSITIVE CUE:

If the mechanical close lever is used, the Breaker 2B623 red flag showing. NEGATIVE CUE:

If the electrical pushbutton is used, the Breaker 2B623 green flag showing.

On load center 2B6, raised the mechanica l close lever for breaker 2B623.

N/A SAT UNSAT TRANSITION NOTE:

Go to the lower south electrical penetration room.

(C) 7. Energize all proportional heaters. POSITIVE CUE:

2HS-4640 and 2HS 4641 are in "ON". NEGATIVE CUE:

2HS-4640 and/or 2HS 4641 are in "OFF".

On panel 2C117, placed "PZR

PROP HTR CONT SW" (2HS

-4640B) in ON.

On panel 2C118, placed "PZR PROP HTR CONT SW" (2HS

-4641B) in ON.

N/A SAT UNSAT END STOP TIME:________________

JOB PERFORMANCE MEASURE JPM-#- A2JPM-RO-PRHAS REV. 02 6 EXAMINEE'S COPY JPM INITIAL TASK CONDITIONS

The following conditions exist.

??A fire has occurred in the Control Room rendering the Control Room uninhabitable.

??RCS pressure is 1840 psia.

??Pressurizer Level is 44%

INITIATING CUE:

The SM directs, "Energize pressurizer proportional heaters locally and raise pressurizer pressure to 2250 psia using AOP 2203.014, Attachment G.

Facility: ANO

-2 Scenario No.: 1 Op-Test No.: 2003

-1 Page 1 Examiners:

Operators:

Initial Conditions:

100% MOL, All ESF systems in standby. Green Train Maintenance Week. 'B' Vacuum pump tagged out for maintenance.

Turnover:

100%. 250 EFPD. 'B' Vacuum pump tagged out for maintenance. Green Train Maintenance Week. EOOS indicates 'Minimal Risk.'

Event No. Malf. No. Event Type* Event Description 1 XRCCHAPCNT I (CBOR) Control Channel "A" Pressurizer Pressure fails HIGH.

2 XSPUPFAIL C (CBOR) Loss of Safety Parameter Display System (SPDS)

Update 3 XFW2TE0361 I (CBOT) Common MFP lube oil supply temperature transmitter, 2TE

-0361, fails LOW (fails 2TIC

-5283 closed). 4 RCP2P32BLOW RCP2P32BMID R (CBOR) N (ALL) RCP 2P32B Lower and Middle Seal failures; Requiring a plant shutdown.

5 RCP2P32BUPP C (CBOR) RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP.

6 RCSLOCATCB M (ALL) Loss of Coolant Accident after Reactor trip due to vapor seal l eakage. 7 HPI2P89AFAL C (CBOT) 'A' HPSI pump fails to auto start due to faulty ESF relay. 8 416_2A406 C (CBOT) 'B' HPSI pump fails to start due to breaker fault.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Operator Actions Form ES D2 Page 2 of 16 SCENARIO #1 NARRATIVE Simulator session begins with the plant at 100% power and steady state. 'B'

vacuum pump is tagged out for maintenance.

The in-service Pressurizer (PZR) control channel pressure instrument will fail high.

Alarms on Pressurizer Control Channel 1 pressure HI and Pressure HI HI will come in. This will result in BOTH PZR spray valves opening, the backup heaters to deenergize, the proportional heaters to go to minimum fire and actual PZR pressure

to drop. AOP 2203.028, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR may take both PZR spray valves to manual and close them. The CBOR may take the Backup heaters to ON to raise PZR pressure.

The CBOR will verify that the other pressure control chan nel is reading correctly and select the channel 2 for control using 2HS

-4626. The CBOT will place SDBCS Master Controller in AUTO local and adjust setpoint to 1000 psia About two minutes into scenario, the SPDS computer will fail to update. The CBOR

wil l report that the SPDS is not updating. This will remain failed the rest of the scenario. Primarily the CBOR will be forced into using redundant indications since one of the SPDS CRT's is on 2C03 and the CBOR relies heavily on it for indications.

The CBO T also will be forced to use redundant indications as one of the SPDS CRT is located on the upper part of 2C16. The CRS will notify maintenance and log the time SPDS is lost. This is a 1

-hour reportable event if SPDS cannot be restored (10CFR50.72).

Fiv e minutes into the scenario, 2TE0361 fails low. This will result in CCW isolation to the common MFP lube oil cooler. Temperature alarms will come in on supply temperature at 135°F. The CRS will refer to ACA2203.012C that will direct

obtaining local lube oil temperatures from the AO. The CBOT will monitor MFP lube oil temperatures on 2TRS 0325 chart recorder located on 2C11. The CBOT will recognize that 2TIC

-5283, MFP Lube Oil Temp. Controller on 2C04 has zero output due to the temperature feed failing low. The CBOT will take manual control of 2TIC

-5283 to lower and control MFP lube oil temp using the PMS MFP screen and the AO to watch MFP lube oil temperature.

Approximately 15 minutes into the scenario, two seals on 'B' RCP will fail.

Annunciator 2K11

-G3, RCP Bleedoff flow HI/LO will alarm. The CBOT will verify using PMS and RCP chart recorder on 2C14 that the lower and middle seals have failed. The CRS will enter the RCP emergencies AOP, 2203.025 and direct the

board operator actions. The crew will perform a power reduction such that the plant will be off line in one hour. The CBOR will borate the RCS and reduce turbine load to maintain Tave

-Tref within 2°F. The CBOT will make preparations to remove secondary plant equipment out of service as power is reduced.

Appendix D Operator Actions Form ES D2 Page 3 of 16 SCENARIO #1 NARRATIVE

When the lead examiner is ready, the third seal will fail on 'B' RCP. When the crew

recognizes the failure the CRS will direct a manual Reactor trip and securing of 'B'

RCP. The Crew will complete SPTA' s when the reactor is tripped.

On the Reactor trip, the vapor seal on 'B' RCP will fail resulting in a 400 gpm LOCA ramped over 5 minutes. The crew will manually actuate SIAS and CCAS when

pressure is observed to be trending towards the trip setpoint of 1 650 psia. The CBOR will secure one RCP in each loop when RCS pressure reaches 1400 psia.

When SIAS is manually actuated, the 'A' HPSI pump will fail to automatically start.

The CBOT will recognize the 'A' HPSI pump not starting (annunciator will alarm) an d manually start the pump (with direction from the CRS). Also when SIAS is manually actuated, the 'B' HPSI pump will fail due to a breaker fault (annunciator will alarm).

The CBOT will place 'B' HPSI pump in PTL and start 'C' HPSI pump.

After SPTA's ar e complete, the CRS will diagnose a LOCA and enter the LOCA EOP 2202.003. The CRS will direct the CBOR to cooldown the RCS. The CBOR will cooldown the RCS using the SDBCS bypass valves to the condenser and plot

and record the cooldown using standard atta chments 1 and 8. When HPSI termination criteria is met, the crew will secure one HPSI pump and throttle the opposite loop HPSI injection MOV's to maintain PZR level. The scenario may be

terminated at the lead examiner's discretion.

Appendix D Operator Actions Form ES D2

Page 4 of 16 Simulator Instructions for Scenario 1 Reset to 100% power MOL IC.

Triggers T1, T3, T4, T5 set to false.

Conditional trigger T2 set to r eactor trip.

Place Green train maintenance week sign in simulator.

Place Minimal Risk sign in simulator.

Align 'C' HPSI to Green Train and in PTL.

PZR Pressure control hand

-switch 2HS

-4626 in Channel A.

'B' Vacuum pump tagged out. Handswitch on 2C01 in PTL. Overide for Green light (2HS

-0696-4) set to FALSE. Override for handswitch in PTL (2HS

-0696) set to TRUE. Override for Seal Water Pump Green light (2CI

-P31B) FALSE.

Event No. Malf. No. Value/ Ramp Time Event Description 1 XRCCHAPCNT Trigger=T1 2500 Control Channel "A" Pressurizer Pressure fails HIGH. 2 XSPUPFAIL Trigger = T1 Insert 2 min TD Loss of Safety Parameter Display System (SPDS)

Update 3 XFW2TE0361 Trigger = T3 0 Common MFP Lube Oil Supply Temperature Transmitter, 2TE

-0361, fails LOW (fai ls 2TIC-5283 closed). 4 RCP2P32BLOW RCP2P32BMID Trigger = T4 100 3 min TD RCP 2P32B Lower and Middle Seal failures:

Requiring a plant shutdown.

5 RCP2P32BUPP Trigger = T5 100 RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP. 6 RCSLOCATCB Trigger = T2 400 gpm 5 min Ramp Loss of Coolant Accident after Reactor trip due to vapor seal leakage.

7 HPI2P89AFAL True 'A' HPSI pump fails to auto start due to faulty ESF relay. 8 416_2A406 2HS-5079-2_w Locked OPEN True 'B' HPSI pump fails due to breaker fault.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No.: 1 Page 5 of 16 Event

Description:

Control Channel "A" Pressurizer Pressure fails HIGH..

Time Position Applic ant's Actions or Behavior CBOR Announce annunciator 2K10

-E6 Pressurizer Pressure Control Channel 1 Pressure HI / LO.

Report both Pressurizer spray valves open and actual pressurizer pressure dropping.

CRS Refer to PZR Systems Malfunctions AOP 2203.02 8 and direct board operators actions.

Refer to TS 3.2.8 if pressure not 2025 to 2275 psia.

CBOR Compare channels and determine Channel 1 failed low.

Control backup heaters manually to maintain pressure > 2100 psia.

Place PZR Pressure Channel Select swi tch (2HS-4626) to channel 2.

Verify PZR spray valves closed.

Restore backup heaters to automatic control.

CBOT Place SDBCS Master controller in AUTO local and adjust setpoint to 1000 psia.

Termination Criteria: PZR Pressure Control selected to Channel 2 in auto control or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No.: 2 Page 6 of 16 Event

Description:

Loss of the Safety Parameter Display (SPDS) Update.

Time P osition Applicant's Actions or Behavior CBOR Announce the loss of the SPDS computer to the CRS

CRS Logs the failure of the SPDS.

CRS Direct the CBOR/CBOT to use the other means of monitoring plant parameters.

CBOR CBO T Monitors the plant and provides information from other panel indications.

CRS Inform SM:

¨ To Contact maintenance (CSG), ¨ That it is a 1

-hour reportable occurrence if it cannot be restarted within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. (10CFR50.72(b) (1) (v) and ANO procedure 2105.014 , SPDS.

Termination criteria: SPDS is logged out of service, maintenance is contacted (CSG) and SM informed of loss of SPDS or at the examiner's discretion (NOTE: this condition will remain throughout the rest of the

scenario).

Appendix D Operator Actions Form ES D2

Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Page 7 of 16 Event

Description:

Common MFP Lube Oil Supply Temperature Transmitter, 2TE

-0361, fails LOW (fails 2TIC

-5283 closed).

Time Position Applicant's Actions or Be havior CBOT Announce annunciators:

2K03-E8/E11 Turbine bearing Metal Temperature High.

2K03-D8/D11 Turbine Bearing Oil Temperature High.

CRS Implement Annunciator Corrective Action AOP 2203.012C

. NOTE: When contacted by control room as AO, report t hat local MFP bearing temperatures to 'A' MFP (2TI2611A) and 'B' MFP (2TI2611B) are trending up are reading the value obtained from instructor's area qume (IEW CCT2E22).

CBOT Report that 2TE

-0374('A' MFP) and 2TE

-0371('B' MFP) are > 135°F and trending up. Also Report that bearing metal temperatures are also trending up.

CBOT Report that MFP Lube Oil TEMP Controller (2TIC

-5283) has zero output. Take manual control of controller and control MFP lube oil temperature < 135°F.

CBOT Report that PMS point T0361 has failed low. (P&ID M

-2216 sh2, E7

& M-2234 sh 1, G

-2) Termination Criteria: When MFP Lube Oil controller is in manual and controlling MFP lube oil temperature or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event N o.: 4 Page 8 of 16 Event

Description:

RCP 2P32B Lower and Middle Seal failures requiring a plant shutdown.

Time Position Applicant's Actions or Behavior CBOR Announce alarm 2K11

-G3 RCP BLEEDOFF FLOW HI/LO.

Re port lower seal failure on "B" RCP.

CRS Refer to RCP Emergencies AOP 2203.025 and direct board operator actions.

CBOR CBOT Monitor RCP seals for further degradation.

Report middle seal failure on "B" RCP.

CRS Setup contingency to trip reactor and RCP if upper seal fails.

Refer to OP 2102.004 Power Operations and commence a plant shutdown. Notify NLOs, Management, Dispatcher, Chemist, and Nuclear Eng.

CBOR Commence boration ~ 20 gpm.

Maintain ASI

-0.20 to +0.20 with Group 6 or P CEAs.

CBOT Red uce main turbine load to maintain Tave within 2

° F of Tref.

Termination criteria: Plant shutdown in progress or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 9 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CBOR Announce Upper Seal failure on "B" RCP (third seal).

Manually trip reactor.

Secure 'B' RCP and place associated spray valve in MANUAL and closed. CRS Implement Standard Pos t Trip Actions, 2202.001 Notify operators to monitor Exhibit 7 CBO Reactor Trip Checklist, track safety functions, and direct board operator actions.

CBOR Check reactivity control:

Reactor power decreasing.

All CEAs inserted.

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

Both 4160v and 6900 v non

-vital buses energized.

Both 4160v and 480v vital AC bus energized.

Both 125v vital DC bus energized.

CBOR Check inventory control:

PZR level 10 to 80%. Trend from setpoint.

RCS MTS > 30°F Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 10 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Re actor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavio r

CT CBOR Check RCS pressure control:

RCS pressure 1800 to 2250 psia.

Trend from setpoint Verify SIAS when pressure less than 1650 psia.

Trip one RCP in each loop when pressure less than 1400 psia. (may not be done until LOCA procedure)

Place s pray valve for secured RCP in manual closed.

Secure ALL RCPs if NPSH requirements violated.

CBOR Check core heat removal by forced circulation:

RCP status Loop D T less than 10

° F. RCS MTS 30

° F or greater.

Component cooling water aligned to RCPs.

Servi ce water not aligned to CCW.

CBOT Restore SW to CCW using Exhibit 5.

CBOT or CBOR Check RCS Heat Removal:

Report SG levels.

MFW in RTO (Reactor Trip Override).

Report feedwater line intact.

Report SG pressures.

CBOR Report RCS Tc 540 to 555

°F.

Appendix D Operator Actions Form ES D2 C ontinue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 11 of 16 Event

Description:

R CP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coo lant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:

Temperature les s than 140

° F and trending up.

Pressure less than 16 psia and trending up.

CNTMT Spray Pumps secured.

Status of radiation alarms:

CAMS (2K10

-B6) In alarm Area radiation (2K11

-B10) in alarm.

Process liquid (2K11

-C10) Report trends on radia tion monitors increasing.

Status of SEC SYS RADIATION HI (2K11

-A10) Report trends on secondary system radiation monitors stable.

CRS Notify SM to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Spec s and EALs.

Tech Specs 3.0.3, 3.6.3.1 and in Alert Emergency Class CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose Loss of Coolant Accident EOP 2202.003.

CRS Implement Loss of Coolant ORP, op en place keeping page, and direct board operators' actions.

CRS Perform crew brief and review floating steps.

CRS Contact chemistry to sample SG for activity Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 12 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto st art due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CBOR Verify SIAS and CCAS actuated on PPS inserts.

CBOT Verify CCW aligned to RCPs (Floating Step)

CT CBOR Check RCS pressure greater than 1400 psia. (Floating Step)

  • Secure one RCP in loop 2 (if not done in SPTA's).

°F. CBOT Restore ESF/Non

-ESF systems: (Floating step)

  • Verify at least one SW pump running in each loop.
  • Verify DG SW outlet valves open.
  • Verify SW suction aligned to Lake.
  • Check 4160v Non

-vital buses energized from offsite power.

  • Check 4160v Vital buses energized from offsite power.
  • Start SW pumps as needed to maintain header pressure.
  • Restore SW to ACW per Exhibit 5.
  • Maintain SW header gr eater than 85 psig.

Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 13 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CT CBOT Verify HPSI f low to RCS:

Report A HPSI pump failure to auto start and manually start.

Report B HPSI Pump breaker trip. Manually start 'C' HPSI pump (Only one HPSI pump is required to be started).

CBOT Verify all CNTMT Cooling Fans running in emergency mode.

CBOT Verify SG levels greater than 22.2%. (Floating Step)

CBOT Align Feedwater:

  • Check EFW pump 2P7B running.
  • Secure EFW pump 2P7A.
  • Verify AFW pump 2P75 secured.
  • Secure running MFW pump and close ALL FW blocks.

CBOT Verify CCW surge tank constant and CCW ra diation monitor trend stable. CBOR Check LOCA is limited to containment.

  • Containment sump level going up.
  • Containment temperature, humidity and pressure are going up.
  • Auxiliary Building radiation levels steady.
  • Auxiliary building sump is less than 53%.
  • W aste tanks 2T20 A/B levels are steady.

Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 14 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor t rip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CBO R Check CNTMT Isolation parameters. (Floating Step)

CNTMT pressure exceeds 18.3 psia.

CNTMT RADIATION HI alarm 2K10

-A6 in alarm. Actuate CIAS and commence Attachment 5.

Verify ONE Penetration Room Ventilation Fan Running.

CBOR Check CNTMT pressure tren d not exceeded 23.3 psia. (Floating Step)

  • Verify CSAS actuated on PPS inserts.
  • Stop ALL RCPs, place spray valves in manual closed.
  • Verify spray pumps running with greater than 1875 gpm each.

CBOT Terminate CNTMT Spray if conditions met.

CBOT Start bo th Hydrogen Analyzers per 2104.044.

CBOT Verify All available miscellaneous CNTMT ventilation running:

  • CNTMT Bldg. Recirc fans (2VSF

-31A-D)

  • Reactor Cavity fans (2VSF

-34A&B)

  • Three CEDM Shroud Cooling fans (2VSF

-35s) Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 15 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip d ue to vapor seal leakage; 'A' HPSI pump fails to auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CBOT Check ALL AC and vital DC buses energized. (Floating Step)

CBOR Check IA pressure greater than 65 psig. (Floating Step)

CRS Check LOCA not isolated and proceed to Section 3 CBOR Perform controlled cooldown to 275

°F. (Float Step)

  • Reset low PZR pressure and low SG pressure setpoints.
  • Record and plot cooldown on Attachm ents 1 and 8.

Initiate cooldown using SDBCS bypass valves.

CBOT Check Condensate pump in service.

CBOT Maintain SG levels 45 to 90%.

Check CST level greater than 82%

CBOR Restore PZR level. (Floating Step)

Maintain 29% to 80%

CBOR Verify Natura l Circulation if RCPs secured:

  • Loop D T less than 50

° F.

  • Thot and Tcold constant or lowering.

° F or greater.

  • D T between Thot and average CETs less than 10

° F. Continue to next page

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No. 5, 6 , 7 & 8 Page 16 of 16 Event

Description:

RCP 2P32B Upper Seal Failure requiring manual Reactor trip and securing of 'B' RCP

Loss of Coolant Accident after Reactor trip due to vapor seal leakage; 'A' HPSI pump fails t o auto start due to faulty ESF relay
'B' HPSI pump fails due to breaker fault.

Time Position Applicant's Actions or Behavior CRS Check that RCP restart criteria is NOT met.

CBOR Check RCS void free:

  • PZR level stable using aux spray.
  • RVLMS LVL 01 in dicates WET.
  • Upper head thermocouples indicate subcooled.

CBOR Maintain RCS P

-T limits and RCP NPSH per Attachment 1.

Check uncontrolled RCS cooldown below 500

° F Tcold has not occurred. CT CBOT CBOR Override HPSI when termination criteria met: (Floa ting Step)

° F or greater.

  • PZR level greater than 29% and controlled.
  • RVLMS LVL 03 or higher indicates WET.
  • At least one SG available

- Level 10 to 90% with FW available OR level being restored with FW flow greater than 485 gpm.

Throttle HPSI flo w OR place HPSI pump in PTL as needed to control RCS pressure, inventory, and heat removal.

Termination criteria: Cooldown in progress with HPSI throttled or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Facility: ANO

-2 Scenario No.: 2 (New) Op

-Test No.: 2003

-1 Page 1 of 13 Examiners:

Operators:

Initial Conditions:

70% and decreasing. Down Power commenced from 100% due to Rod Drop (CE A # 46). Azimuthal Tilt in Alarm and continuing power decrease.

Turnover:

Continue power decrease to 50% due to Azimuthal Tilt Alarm. Azimuthal Tilt has not cleared with the Power Reduction. CEA 46 dropped to bottom ~ 80 minutes ago and

has been re

-aligned with other CEA's in Group 6. Entered AOP 2203.003, CEA Malfunctions. Green Train Maintenance week. EOOS indicates 'Minimal Risk.'

Event No. Malf. No. Event Type* Event Description 1 CUED XSG2LT11311 I (CBOT) Steam Generator "B" Safety Channe l Level Fails LOW. 2 T=0 POWER REDUCTION N (ALL) R (CBOR) Continue Power REDUCTION 3 T+10 From T1 XCVLDNHXOU I (CBOR) Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW 4 T=0 CEA48STUCK Value = 80%

C(CBOR) Degraded Rod Motion for CEA 48 o n Controlling CEA Bank. This requires individual CEA adjustment to align the CEA with the CEA bank.

5 CUED EHLEAK (NEW) M(ALL) Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in

Manual/Automatic Reactor Trip. 6 RX TRIP MS1002 (Set to 0#)

M (ALL) Main Steam Safety Valve OPENS and Fails to CLOSE on "A" Steam Generator resulting in an ESD outside

Containment 7 EFAS ESF1025 2CV10382_A C (CBOT) 'B' EFW isolation valves to 'A' SG fail to close, one automati cally and one with valve failure. This results in continued EFW Feed to Affected Steam Generator.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Operator Actions Form ES D2 Page 2 of 13 SCENARIO #2 NARRATIVE Simulator session begins with the plant at 70

% power and a power reduction in progress. Annunciator 2K10

-B2, TECH SPEC AZ TILT EXCEEDED and 2K10

-C2, CPC AZ TILT EXCEEDED are in alarm. Direction from Reactor Engineering has been given to continue reducing power to less than 50% in the next 30 minute s (40 minutes is the Tech Spec required time). The crew will enter OP 2102.004, Power Operations procedure, step 11.16, Power Reduction. The CBOR will start a power

reduction by RCS boration and lowering turbine load on the turbine load

potentiometer to maintain Tave

-Tref within 2°F.

During the down power,Axial Shape Index (ASI) will become more negative; to

maintain ASI within .01 of Equilibrium Shape Index (ESI), Group 6 CEA's will need to

be inserted. As Group 6 CEAs are inserted, CEA 48 will lag be hind the other four CEA's in the group. Annunciators 2K04

-J5 CEAC #1 DEVIATION and 2K04

-J6, CEAC#2 Deviation (5") may alarm. PMS CEA Annunciator 2K10

-D1, CEA Minor Deviation (3") or 2K10

-C1, CEA Major Deviation (6") may also alarm. Manual Individual CED MCS operation will be needed to align CEA 48 with the rest of the group. When Reactivity manipulation completed and on lead examiner's cue, 2LT

-1131-1, safety channel for 'B' Steam Generator (SG) Level, will fail low. This will trip one of the four PPS trip channels for low SG level trip. Alarms for RPS Channel Trip/Pre

-trip and Channel 'A' Operator Insert (2C03) trip and pre

-trip lights will be lit. The CRS will refer to the ACA 2203.012D and Tech Specs 3.3.1.1, 3.3.2.1 and 3.3.3.5 for guidance. The CBOT will place Channel 'A' PPS in bypass for Point 8, LOW SG B Lvl, Point 10, HI SG B Lvl, and Point 20, SG B

?P for maintenance and trouble shooting. The crew will have one hour to place these points in bypass before exceeding the Tech Spec LCO.

Approximately 10 minutes after SG Level transmitter fails low, the Letdown Heat

Exchanger temperature transmitter, 2T IC-4815, fails low. This will cause the temperature controller to close and actual Letdown temperature to go up. With no operator action, the Letdown Radiation Monitor will be isolated, the Letdown

Demineralizer will be bypassed and the VCT temperature w ill rise. Annunciator 2K11-C1, Letdown HX 2E29 Outlet Temp Hi will alarm. CRS will refer to ACA for 2K11-C1 and direct actions. CBOR will evaluate 2HIC

-4815 and report that demand out of HIC is zero and temperature indicated is zero. CBOR or CBOT will look at PMS computer point T4805 and report that letdown temperature is above alarm set point. CBOR will place 2HIC

-4815 in manual and control CCW flow from the Letdown Heat Exchanger to maintain letdown temperature less than 140°F. CRS will contact the WCO and ask flow on 2FIS

-5261, CCW flow out of Letdown Heat Exchanger. If letdown temperature exceeded 145°F, letdown flow through the letdown radiation monitor must be manually restored.

Appendix D Operator Actions Form ES D2 Page 3 of 13 SCENARIO #2 NARRATIVE (Continued)

When cued by the lead examiner, an EH leak will start down stream of isolation valve 2EH-1A (on EH Pump Skid) on the common header. EH pressure will degrade to

~1300psig over the next 3 minutes. Annunciator 2K02

-A9, LOW EH Pressure, will alarm and the standby EH pump wil l automatically start. EH pressure will rise and then lower again as the leak worsens. Annunciator 2K02

-C10, EH Tank Low Level will alarm about 5 minutes after the start of the malfunction. The Main Turbine Generator will automatically trip at 1100 psig EH pressure. The Main Feed Pumps will automatically trip at 400 psig EH pressure. The crew will secure the EH pumps and the CRS will enter SPTA's.

Post reactor trip the Main Steam Safety Valve (2PSV

-1002) on 'A' SG will fail open resulting in an Excess Steam Demand (ESD) outside containment. Also, post EFAS, Emergency Feed Actuation Signal, 2CV

-1038-2, 'B' EFW Pump to 'A' SG will mechanically fail to close and 2CV

-1025-1, 'B' EFW Pump to 'A' SG will fail to close due to a stuck relay. This will result in severe overcooling of the RCS, if not corrected. The CBOT will override 2CV

-1025-1 and close.

Appendix D Operator Actions Form ES D2 Page 4 of 13 Simulator Instructions f or Scenario 2 Reset simulator to MOL 70% power IC normal system lineup.

Group 6 is inserted for ASI control.

Markup OP 2102.004, Power Operations up to step 11.16 for power reduction.

Place Green train maintenance week sign in simulator.

2K10-B2, Tech Spe c AZ Tilt Exceeded alarm in.

2K10-C2, CPC AZ Tilt Exceeded alarm in.

Triggers T1, T3, and T4 are set to False.

Conditional Trigger T2 is set to Reactor trip.

Conditional Trigger T5 is set to EFAS

-1. Event No. Malf. No. Value/ Ramp Time Event Description 1 XSG2LT11311 Trigger T1 0 Steam Generator "B" Safety Channel Level Fails LOW. 2 POWER REDUCTION Continue Power REDUCTION 3 XCVLDNHXOU Trigger T3 50°F Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW 4 CEA48STUCK 80% Degraded Rod Motion for CEA 48 on Controlling CEA Bank. This requires individual CEA adjustment to align the CEA with the CEA bank.

5 EHLEAK Trigger T4 TRUE Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in

Man ual/Automatic Reactor Trip.

6 MS1002 Trigger T2 0 Ramp = 20 min. Main Steam Safety Valve OPENS and Fails to CLOSE on "A" Steam Generator resulting in an ESD

outside Containment 7 ESF1025 2CV10382_A 2HS-1038-2_R Trigger T5 TRUE 1.0 FALSE TD 20 sec.

'B' EFW isolation valves to 'A' SG fail to close. 2CV

-1025-1 fails to automatically CLOSE. 2CV

-1038-2 fails to CLOSE due to valve failure. This results in continued EFW Feed to AFFECTED Steam

Generator.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Even t No.: 1 Page 5 of 15 Event

Description:

Steam Generator "B" Safety Channel Level Fails LOW.

Time Position Applicant's Actions or Behavior CBOR Announce annunciators:

2K04-A4, CH A RPS/ESF/PRETRIP/TRIP

2K04-B3, PPS Channel TRIP 2K12-K7, DEFAS Trouble CRS Implement Annunciator Corrective Action AOP 2203.012D.

CBOR Report B SG level low pretrip/t rip on 'A' PPS insert.

CBOT Compare all four channels and report 2LI

-1131-1 indicates zero.

CRS Inform SM to refer to Tech Spec 3.3.1.1 and 3.3.2.1 and TRM 3.3.1.1. CBOT Place the following points in bypass on PPS Channel A:

LOW SG B Lvl (Point 8

) HI SG B Lvl (Point 10 )

SG B D P (Point 20)

CBOR Verify annunciator 2K04

-C3, PPS CHANNEL BYPASSED alarms.

Verify correct channels in bypass.

CRS Contact Maintenance/Work Week Manager.

Termination criteria: Affected points are placed in bypass or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Event No.: 2 Page 6 of 13 Event

Description:

Continue Power REDUCTION Time Position Applicant's Actions or Behavior ALL Crew will c onduct brief for power decrease.

CRS Implement normal operating procedure 2102.004, Power Operations, Section 11.0. (Step11.16)

Direct CBOR to borate to lower RCS temperature and adjust turbine load using load set potentiometer.

CBOR Commence RCS bor ation using OP 2104.003, Chemical Addition, Exhibit 3, Normal Boration At Power.

Verify Boric Acid Makeup Controller in Auto at desired flow rate.

Verify selected Boric Acid Pump in Normal

-After-Stop. Verify Mode Selector Switch (2HS

-4928) in BORATE.

Verif y 2CV-4830, Charging Pump Suction from Boric Acid, opens.

Verify selected Boric Acid Pump running.

Open associated Boric Acid Pump Recirc valve.

Depress red push button on Boric Acid Makeup Batch Controller, 2FIQS-4926 and verify it is set for proper quant ity. Verify 2FIC

-4926 indicates proper flow rate.

Monitor Tave and ASI.

Obtain PEER check.

CBOR Adjust turbine load to maintain reference temperature and RCS average temperature within two degrees.

Obtain PEER check.

CBOR Maintain ASI within 0.05 of po wer dependant ESI by withdrawing CEA's. Obtain PEER check and CRS permission to withdraw CEA's.

Termination criteria: Reactivity manipulation observed or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Event No.:

3 Page 7 of 11 Event

Description:

Letdown Heat Exchanger Outlet Temperature Transmitter fails LOW.

Time Position Applicant's Actions or Behavior CBOR Announce Annunciator 2K12

-C1, Letdown HX 2E29 Outlet Temp HI Verify temperature 2TIS

-4815 is reading zero.

CRS Refer to ACA for 2K12

-C1 and direct Board Operator actions.

CBOR or CBOT Verify Computer point T4805 and 2C09 TIS

-4805 are reading greater than 140°F.

CBOR Verify normal letdown flow.

NOTE: When contacted a s WCO, Report CCW flow rate based on approximate demand of 2TIC 4815. (Until manual control is initiated the flow rate is zero, the maximum flow rate is 1200 gpm.)

CRS Contact WCO to verify CCW flow through Letdown Heat Exchanger using 2FIS

-5261. CBOT Report CCW Loop II temperature from 2C14.

CBOR Report that 2TIC

-4815 is not controlling CCW flow in Automatic and take manual control of 2TIC

-4815 and raise CCW flow through the Letdown Heat Exchanger to maintain Letdown temperature less than 140°F. CB OR If Letdown temperature went above 145°F, then verify:

  • That the Letdown To Ion Exchanger valve, 2CV

-4803, is in bypass

  • That the Letdown To Radmonitor valve, 2CV

-4804, is closed.

CBOR When Letdown temperature drops below 140°F, then verify:

  • That the Let down To Ion Exchanger valve, 2CV

-4803, is NOT in bypass

  • Take the Letdown to Radmonitor valve, 2CV

-4804, closed then open.

CRS Contact Maintenance / Work Week Manager.

Termination criteria: Letdown Heat Exchanger temperature controller, 2TIC

-4815 is in manual and controlling Letdown temperature less than 140°F.

Appendix D Operator Actions Form ES D2

Op-Test No.: 1 Scenario No.: 2 Event No.: 4 Page 8 of 13 Event

Description:

Degraded Rod Motion for CEA 48 on Controlling CEA Bank

. Time Position Applicant's Actions or Behavior CBOR Announce CEA 48 position indication deviating from rest of bank:

  • CEAC 1 or 2 indication

-J5, CEAC #1 Deviation and 2K04-J6, CEAC#2 Deviation alarms. Report 5" deviation.

-D1, CEA Minor Deviation. Report 3" deviation.

-C1, CEA Major Deviation alarm. Report 6" deviation.

CRS Direct Manual Individual CEDMCS operation to align CEA 48 with the rest of the group.

C BOR Align CEA 48 with rest of group by Manual Individual operation of CEDMCS and insert CEA 48 until it is aligned with the other four

CEA's in Group 6.

Obtain PEER Check.

NOTE: This evolution may occur more than once during the scenario. It is dependant on the magnitude of power reduction.

Termination Criteria: Event may be terminated when CEA 48 is aligned with the rest of the CEA's in Group 6 or at the discretion of the lead examiner.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Event No.: 5 Page 9 of 13 Event

Description:

Leak in Electro Hydraulic System resulting in Loss of EH Pressure to Main Turbine and MFPs resulting in Manual/Automatic Reactor Trip.

Time Position Applicant's Actions or Behavior CBOT Report Annunciators 2K02

-A9, EH Header Press LO and 2K02-B9, EH Pump 2P14A/B Auto Start are in alarm and report that Standby EH Pump 2P14B automatically started.

CRS Refer to ACA for 2K02

-A9 and direct actions.

CBOT Report EH pressure is less t han 1300 psig and lowering.

NOTE: When contacted by CRS, report that EH fluid is spraying into EH pit area from a break on the common EH discharge header down stream of isolation

valve 2EH-1A and is a large leak.

CRS Direct AO to investigate EH system.

CBOT Report Annunciator 2K02

-C10, EH Tank 2T38 Level Hi/LO is in alarm. CRS Refer to ACA for Annunciator 2K02

-C10, EH Tank 2T38 Level Hi/LO and direct actions.

CBOT Monitor EH pressure and report that pressure is approaching Main Turbine Generator (M TG) trip set point and recommend manually tripping the plant.

CBOT Report that the MTG is tripped.

CRS Direct CBOR to manual trip the reactor.

CBOR Manually trip the reactor.

CBOT Place both EH pumps in PTL.

Manually trip the MFP's or report that they have tripped on low EH pressure.

Termination Criteria: Event may be terminated when the reactor is tripped.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Event No.: 6 and 7 Page 10 of 13 Event

Description:

On reactor trip one MSSV on 'A' SG, 2PSV

-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV

-1038-2 and 2CV-1025-1 will not close. Implement SPTA's and diagnose event.

Time Position Applicant's Actions or Behavior CREW A nnounce reactor trip.

CRS Implement 2202.001, Standard Post Trip Actions, track safety functions, and direct board operator actions.

CRS Direct crew to use Exhibit 7, CBO Reactor Trip Checklist, track safety functions, and that the CRS has control of a nnunciator horn during moment of silence.

CRS Directs crew to take control of annunciator horns and implement SPTA's.

CBOR Check reactivity control:

Report reactor power lowering.

Report all CEA's are inserted.

CBOT Check maintenance of vital aux iliaries: Report main turbine tripped.

Report generator output and exciter breakers open.

Report both 4160vac and 6900vac non

-vital buses energized form S/U #3. Report both 4160v and 480v vital AC bus energized from S/U #3.

Report both 125v vital DC bus en ergized. CBOR Check inventory control:

Report PZR level 10 to 80%.

Report PZR level NOT trending to setpoint.

Report RCS MTS greater than 30 °F Event 6&7 Continued.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 1 Event No.: 6 & 7 Page 11 of 13 Event

Description:

On reactor trip one MSSV on 'A' SG, 2PSV

-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV

-1038-2 and 2CV-1025-1 will not close.

Implement SPTA's and diagnose and m itigate event.

Time Position Applicant's Actions or Behavior CBOR Check RCS pressure control:

Report RCS pressure 1800 to 2250 psia. May be lower than 1800 due to the RCS cooldown.

CBOR Check core heat removal by forced circulation:

Report RCP's are running. Report CCW is aligned to RCP's.

Report SW is aligned to CCW.

CBOT Check RCS Heat Removal:

Report SG levels are lowering.

Report all condensate pumps are secured.

Report both MFW pumps are secured.

Manually actuate EFAS, if not already actuated

. Report that a SG safety valve is open and depressurizing the SG.

Manually actuate MSIS or announce that MSIS has been automatically actuated.

CRS can direct the CBOT to setup to maintain post SG lowdown RCS temperature using upstream ADV on 'B' SG.

C BOR Report RCS Tc 540 to 555

°F and slowly lowering.

CT CBOT Close 2CV-1025-1 by overriding EFAS actuation or secure 2P7B, Motor Driven EFWP to secure feeding the AFFECTED SG.

Event 6&7 Continued.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 2 Event N o.: 6 & 7 Page 12 of 13 Event

Description:

On reactor trip, one MSSV on 'A' SG, 2PSV

-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to 'A' SG, 2CV

-1038-2 and 2CV-1025-1 will not close.

Impl ement SPTA's and diagnose event.

Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:

Report temperature less than 140

° F. Report pressure less than 16 psia.

Report containment spray pumps secured.

Report status of radiation alar ms: CAMS (2K10

-B6) not in alarm Area radiation (2K11

-B10) not in alarm Process liquid (2K11

-C10) not in alarm Report stable trends on radiation monitors.

Report SEC SYS RADIATION HI (2K11

-A10) not in alarm.

Report stable trends on secondary system radiation monitors.

CRS Notify SE to report to control room.

Announce reactor trip on plant page.

Notify SM to refer to Tech Specs and EALs.

(3.7.1.2 EFW valve failure and NUE

- 3.1, Uncontrolled depressurization of secondary that results in MSIS actuation)

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Notify crew of status of Safety functions.

Diagnose EXCESS STEAM DEMAND event on 'A' SG.

Conduct crew brief.

Event 6 & 7 Continued.

Appendix D Operator Actions Form ES D2

Op-Test No.: 1 Scenario No.: 2 Event No.: 6 & 7 Page 13 of 13 Event

Description:

On reactor trip, one MSSV on 'A' SG, 2PSV

-1002, will stick open. On EFAS actuation, the 'B' EFW isolation valves to '

A' SG, 2CV

-1038-2 and 2CV-1025-1 will not close.

Implement SPTA's and diagnose event.

Time Position Applicant's Actions or Behavior CRS Implement EXCESS STEAM DEMAND Event EOP 2202.006.

Direct board operators in performing the below actions.

CBOR Ver ify one RCP in each loop if RCS pressure drops less than 1400 psia and associated spray valve in manual and closed.

CT CBOT Maintain Post SG Blowdown RCS temperature and pressure less than 200°F margin to saturation by steaming the 'B' SG using the Upstre am Atmospheric Dump Valve.

CT CBOR Maintain Post SG Blowdown RCS temperature and pressure less than 200°F margin to saturation by controlling RCS pressure using Normal Spray or Auxiliary Spray.

CBOR CBOT Maintain PZR level by overriding HPSI.

Event Termination: RCS temperature is maintained using Upstream ADV on 'B' SG and RCS pressure is maintained using Normal or Auxiliary Spray or at the discretion of the lead examiner.

Appendix D Operator Actions Form ES D2 Facility: ANO

-2 Scenario No.: 3 Op

-Test No.: 2003

-1 Page 1 of 12 Examiners:

Operators:

Initial Conditions:

100% MOL; Thunderstorm Watch for Pope and Conway counties.

Tu rnover:: National Weather service has issued a Thunderstorm Watch for Pope and Conway Counties until 8:00 pm today. AOP 2203.008, Natural Emergencies, Section 3, Tornado, steps 1 and 2 have been completed. Call 890

-4987 for weather updates.

Event No. Mal f. No. Event Type* Event Description 1 500BRK5106 500BRK5110 N (ALL) R (CBOR) Mabelvale 500KV line failure. Site must reduce load to 1250MW total net generation. Unit One will

reduce turbine load to 350MW. Unit 2 will reduce

turbine load to 900 MW in 15 minutes.

2 CUED XRCCHAPLVL I (CBOR) 'A' Pressurizer Level Control Channel fails LOW.

3 10 Min after event 2 CVC2P36BFAL C (CBOR) 'B' CCP breaker trip.

4 CUED RCSPZSTMLK RPSRXAUTO RPSRXMAN RPSDSSAUTO

RPSDSSMAN M (ALL) PZR Steam Space leak.

RPS/DSS fail to manually and automatically trip.

Open feeder breakers to MG sets.

5 TRIP CEA52STUCK C (CBOR) Stuck CEA # 52 on Reactor trip.

6 EFAS MFWPMPATRP 2CV-0332 EFW2P7BESF C (CBOT) 'A' MFP trip.

'A' EFW pump over speed trip on startup.

'B' EFW pump fail s to auto start.

7 CUED 416_2A306 C (CBOT) 'A' HPSI trip after verification.

Appendix D Operator Actions Form ES D2

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Operator Actions Form ES D2 Page 2 of 12 SCENARIO #3 NARRATIVE When crew takes the watch, the Systems Dispatcher will call the Control Room and report that the 500 KV line to Mabelvale has failed and the ANO site output must be reduced to less than 1250 MW within 15 minutes. Unit 2 must reduce load to 900

MW gross output within 15 minutes. The CRS will enter Attachment 'H' of O P 2102.004, Power Operations, and direct the CBOR to borate and reduce turbine load to maintain Tave

-Tref within 2°F.

After the CBOR has completed the required reactivity manipulation, the in

-service Pressurizer (PZR) Control Channel Level instrument wil l fail low.

Alarms on Control Channel 1 Level LO and Level LO LO will come in. This will result in Letdown going to minimum flow, the two backup CCP's will automatically start, all PZR heaters will

de-energize and actual PZR level will go up. AOP 2203.0 18, PZR Systems Malfunctions, will be entered and actions directed by the CRS. The CBOR will take the Letdown Flow Controller to manual and control PZR level. The CBOR will also verify that the other level control channel is reading correctly and select that channel for control and place the PZR Low Level Cutoff switch to the unaffected channel.

When the auto and manual signals are matched, the CBOR will place the Letdown

Flow Controller to automatic. The CRS will determine that TS 3.3.3.5 and 3.3.3.6

a re applicable.

Approximately 10 minutes after the PZR Level Control Channel fails low, 'B' CCP

breaker will trip. The CRS will enter the Loss Of Charging AOP. The crew will

determine that the CCP breaker tripped and start a backup CCP. Letdown may

isol ate on high Regen Heat Exchanger temperature, depending on the promptness of starting the Backup CCP. If letdown isolated, then, letdown will be restored using 2104.002, CVCS.

When Charging and Letdown have been restored, a PZR Steam Space leak in

excess of PZR heaters capacity to maintain pressure will begin. PZR pressure will drop rapidly and the crew will manually trip the reactor. Both the RPS and DSS manual and auto pushbuttons will fail to actuate a reactor trip. The CRS will direct

the CBOT to o pen the feeder breakers to the MG sets, 2B712 and 2B812. CRS will identify 3.0.3 applicability due to the failure of all manual trip pushbuttons. When the reactor is tripped, one CEA will fail to insert requiring the CBOR to perform Exhibit 1, Emergency Boration. The CRS will enter Standard Post Trip Actions and determine safety function status and diagnose a LOCA. During SPTA's the crew will verify SIAS, CCAS actuations. The Crew will secure ALL RCP's when Margin to

Saturation conditions are reached.

When RCS Heat removal safety function is evaluated, EFW will be manually actuated due to the trip of 'A' MFP. Upon EFAS Appendix D Operator Actions Form ES D2 actuation 'A' EFW pump will overspeed trip and 'B' EFW pump will fail to auto start.

The CBOT will manually start 'B' EFW pump.

Page 3 of 12 SCENARIO #3 NARRATIVE (continued)

After SIAS has been verified to be operating correctly, 'A' HPSI pump will trip. The

CBOT will place the handswitch for 'A' HPSI in PTL and manually start 'B' HPSI

pump. The crew will complete the entry sectio n for LOCA procedure and determine that the LOCA is an unisolated event and the CRS will implement Section 3 of the LOCA procedure. The crew will start an RCS cooldown to SDC.

Appendix D Operator Actions Form ES D2 Simulator Instructions for Scenario 3 Page 4 of 12 Reset simulator to MOL 1 00% power IC.

Align swing pumps (HPSI and SW) to the Red train, except for Charging.

Markup AOP 2203.008, Natural Emergencies Section 3, Tornado steps 1 & 2.

Ensure that AACG is secured and annunciators clear.

'B' CCP is selected as lead pump.

Place MINIMA L RISK and Green Train Maintenance Week signs on 2C100.

T1, T3, T4, T5, T7 set to false.

T2 set to RXTRP; T6 set to EFAS 1.

Event No. Malf. No. Value/ Ramp Time Event Description 1 500BKR5106 500BKR5110 Trigger = T1 TRUE Mabelvale distribution line fail ure. 2 XRCCHAPLVL Trigger = T3 0 'A' Pressurizer Level Control Channel fails LOW.

3 CVC2P36BFAL Trigger = T4 TRUE 'B' CCP breaker trip.

4 RCSPZSTMLK Trigger = T5 RPSRXAUTO RPSRXMAN RPSDSSAUTO

RPSDSSMAN TRUE 50 Ramp = 5 min. PZR Steam Space Leak RPS/DSS fail to manually and automatically trip. Open feeder breakers to MG sets.

5 CEA52STUCK 0 Stuck CEA 52 on Reactor trip.

6 MFWPMPATRP Trigger T2 2CV-0332 EFW2P7BESF Trigger T6 TRUE 0 TRUE 'A' MFP trip.

'A' EFW pump over speed trip on startup

. 'B' EFW pump fails to auto start.

7 416_2A306 LCK-OP 'A' HPSI pump trips after verification and entry into LOCA EOP.

Appendix D Operator Actions Form ES D2 Trigger = T7 OP LOCA EOP. Op-Test No.: 1 Scenario No.: 3 Event No.: 1 Page 6 of 15 2 Event

Description:

Mabelvale distribution line failure.

Time Position Applicant's Actions or Behavior Simulator operator's cue: When directed by lead examiner; call the CRS as the System Dis patcher with the following direction:

"The 500KV line to Mabelvale has been damaged and ANO's net generation must be reduced to 1250KW within the next 15 minutes. Unit One will reduce load to 350 MW and Unit Two will

reduce load to 900 MW gross output."

ALL Crew will conduct brief for RAPID power reduction to net Unit 2 Generation of 900 MW.

CRS Implement normal operating procedure 2102.004, Power Operations Section 11.0, Power Reduction and refer to Attachment 'H' for rapid

power reduction.

CBOR Com mence RCS Boration using OP 2104.003, Chemical Addition, Exhibit 3, Normal Boration At Power.

Verify Boric Acid Makeup Controller in Auto at desired flow rate.

Verify selected Boric Acid Pump in Normal

-After-Stop. Verify Mode Selector Switch (2HS

-4928) in BORATE. Verify 2CV

-4830, Charging Pump Suction from Boric Acid, opens.

Verify selected Boric Acid Pump running.

Open associated Boric Acid Pump Recirc valve.

Depress red push button on Boric Acid Makeup Batch Controller, 2FIQS-4926 and verify it is set for proper quantity.

Verify 2FIC

-4926 indicates proper flow rate.

Monitor Tave and ASI.

Obtain PEER checks.

CBOR Adjust turbine load to maintain reference temperature and RCS average temperature within two degrees.

Obtain PEER checks.

CBOR Maintain ASI wi thin 0.05 of power dependant ESI by inserting CEA's.

Obtain PEER checks and CRS permission to withdraw CEA's.

Termination criteria: ~150 MW reduction and Reactivity manipulation observed or at Appendix D Operator Actions Form ES D2 examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scen ario No.: 3 Event No.: 2 Page 8 of 15 2 Event

Description:

'A' Pressurizer Level Control Channel fails LOW.

CBOR Announce alarms 2K10

-G6 CNTRL C H 1 LEVEL LO.

2K10

-F6 CNTRL CH 1 LEVEL LO LO.

Report 2LI

-4627-2 and 2LR-4625 indicate normal.

Report backup Charging Pumps started.

CRS Refer to PZR Systems Malfunctions AOP 2203.028 and direct board operators actions.

CBOR Determine PZR Level Channel A failed.

Place Letdown Flow Controller (2HIC

-4817) in MANUAL.

Place PZR Level Channel Select switch (2HS

-4628) to Channel B.

Place PZR Low Low Level Cutoff select switch (2HS

-4642) to Channel B. Verify PZR heaters and Normal Spray maintaining RCS pressure 2025 to 2275 psia.

The CBOR will take the Letdown Flow Controller to AUTO when AUTO and MANUAL signals match.

CRS Inform SM to refer to TS 3.3.3.6 Post Accident Instrumentation.

Terminatio n criteria: Unaffected PZR Level Channel selected and Letdown in automatic or at examiner's discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 3 Page 9 of 15 2 Event

Description:

2P36B, 'B' CCP breaker trip.

Time Position Applicant's Actions or Behavior CBOR Announce annunciator 2K12

-B3 CHARGING HEADER FLOW LO Verify that Charging flow indicates zero.

CRS Implement Loss of C harging AOP 2203.036 and direct board operator actions. CBOR Verify suction and discharge flow path.

Verify Charging Header Isolation valve 2CV

-4840-2 OPEN. Verify that 'B' CCP Breaker is tripped (RED and GREEN Lights out)

CBOR Start Backup CCP.

Verify proper operation of CCP (Flow, Pressure and Temperature)

CRS Contact WCO to locally check 'B' CCP for gas binding.

Simulator Operator Cue:

When contacted to check for gas binding, report that 'B' CCP venting complete and no gas was observed.

CBOR Res tores Letdown System to operation using OP 2104.002, Chemical and Volume Control, Section 9.2 Restoring Letdown After Temporary Isolation (if isolated on high Regenerative HX Outlet Temperature

previously).

Termination criteria: CVCS restored to operation , or at examiners discretion.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 4 Page 10 of 15 2 Event

Description:

Pressuri zer Steam Space Leak and failure of RPS and DSS to Automatically or Manually actuate.

Time Position Applicant's Actions or Behavior CBOR Announce the following:

  • PZR pressure dropping rapidly.
  • ALL PZR heaters are energized.
  • Containment temperature and pressure are rising.

CRS Verify that leak is from the PZR and not a Main Steam Line Break by comparing Tave, Steam/Feed Flows, PZR Pressure and PZR Level.

Direct CBO's to manually trip the reactor.

CBOR Attempt Manual Reactor Trip pushbuttons on 2C03 , Attempt Manual DSS pushbutton on 2C03, Attempt Manual Reactor trip pushbuttons on 2C14. C CBOT Open Breakers 2B712 and 2B812 and reclose after 10 seconds.

CRS Direct board operators to verify Safety Functions using Exhibit 7.

CRS Identify 3.0.3 applicability.

Termination criteria: Reactor tripped or at discretion of Lead Examiner.

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 4, 5, 6 and 7 Page 11 of 15 2 Event

Description:

Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.

Time Position Applicant's Actions or Behavior CRS Implement SPTA's and direct contingency actions.

CBOR Check reactivity control:

Reactor power decreasing.

Identify CEA 52 stuck out.

Emergency Boration in progress (SIAS will actuate/ CBOR will verify 40 gpm Charging Flow and BAM pumps started and Emergency

Borate valve is open)

CBOT Check maintenance of vital auxiliaries:

Main turbine tripped.

Generator output and exciter breakers open.

All 4160v and 6900 v Non

-Vital busses energized.

ALL 4160v and 480v vital AC bus energized.

All 125v vital DC bus energized.

CBOR Check inventory control:

PZR level 16 to 80%.

Trend from setpoint.

Report SIAS actuated or manually actuate and verify all PZR heaters off when PZR level less than 29%.

C CBOR Check RCS pressure control:

RCS pressure 1800 to 2300 psia.

Trend from setpoint Secure Two RCP's when RCS pres sure is less than 1400 psia or ALL RCP's when MTS is lost.

Place spray valve for secured RCPs in manual closed.

Verify SIAS when pressure less than 1650 psia.

Termination criteria: RCP's secured, RCS Cooldown in progress, EFW pump started or at lead exa miner's discretion. (continued on next page)

Appendix D Operator Actions Form ES D2

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 4, 5, 6 and 7 Page 13 of 15 2 Event

Description:

Pre ssurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.

Time Position Applicant's Actions or Behavior CBOR Check core heat removal by forced circulation:

Two RCP 's running (if all are secured no further actions are taken)

Loop D T less than 10

° F. RCS MTS 30

° F or greater.

Service Water Pump suction aligned to Lake.

Component Cooling Water aligned to RCPs.

CBOT Restore SW to ACW per Exhibit 5. (NOTE: This action requires several minutes)

Check SIAS act uated. Maintain SW pressure greater than 85 psig.

(If all RCPs are secured, above actions are not taken until LOCA procedure)

CBOT Check RCS Heat Removal:

Report SG levels and method of feed.

Manually actuate EFW.

Announce 'A' EFW pump overspeed trip.

Manually start 'B' EFW pump.

Report feedwater line intact.

Report SG pressures.

CBOR RCS Tcold 540 to 555

° F. Termination criteria: RCP's secured, RCS Cooldown in progress, EFW pump started or at lead examiner's discretion. (continued)

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 4, 5, 6 and 7 Page 14 of 15 2 Event

Description:

Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & '

B' EFW pump failures, 'A' HPSI pump failure.

Time Position Applicant's Actions or Behavior CBOR Check CNTMT parameters:

Temperature trending up.

Pressure trending up.

Status of radiation alarms:

CAMS (2K10

-B6) in alarm Area radiation (2K11

-B1 0) in alarm Process liquid (2K11

-C10) Secondary Sys Radiation Hi (2K11

-A10) NOT in alarm.

CBOR Check CCAS, and SIAS actuated on PPS inserts.

Verify one Emergency Penetration Room Vent fan running.

CNTMT coolers in Emergency Mode.

CRS Notify S M to perform the following:

SE report to control room.

Announce reactor trip on plant page.

Refer to Tech Specs and EALs.

CRS Direct CBOs to acknowledge all control room annunciators and announce all significant alarms.

Diagnose Loss of Coolant Accident.

CRS Implement Loss of Coolant Accident procedure and open place keeping page. Direct board operators in performing the following

actions. ALL Perform crew brief and review floating steps.

Termination criteria: RCP's secured, RCS Cooldown in progre ss, EFW pump started or at lead examiner's discretion. (continued)

Appendix D Operator Actions Form ES D2 Op-Test No.: 1 Scenario No.: 3 Event No.: 4, 5, 6 and 7 Page 15 of 15 2 E vent

Description:

Pressurizer Steam Space Leak (post trip), Stuck CEA 52, 'A' & 'B' EFW pump failures, 'A' HPSI pump failure.

Time Position Applicant's Actions or Behavior CRS Direct actions in LOCA procedure.

CBOT Restore CCW to RCP's (Att.21), SW to CCW (ATT.5) and SW to ACW (ATT. 5)

CBOR Verify HPSI and LPSI flow adequate.

CBOT Verify Containment Cooling is operating in Emergency Mode.

CBOT Verify one Penetration Room Exhaust Fan running.

CBOT Start Hydrogen Analyzers.

CBOR Start R CS cooldown.

Termination criteria: RCP's secured, RCS Cooldown in progress, EFW pump started or at lead examiner's discretion.