RA-15-109, Oyster Creek - Commitment Change Summary Report - 2014: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 11: Line 11:
| contact person =  
| contact person =  
| case reference number = RA-15-109
| case reference number = RA-15-109
| document type = Letter
| document type = Letter type:RA
| page count = 1
| page count = 1
}}
}}

Revision as of 03:33, 10 October 2018

Oyster Creek - Commitment Change Summary Report - 2014
ML15351A408
Person / Time
Site: Oyster Creek
Issue date: 12/04/2015
From: Stathes G L
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-15-109
Download: ML15351A408 (1)


Text

~Exetoreero NEI 99-04 RA-15-109 December 4, 2015 u.s. Nuclear Regultory Cmiso Attn: Doumn Controt Desk Washington, DC 20656-(X001 Oyster Creek Nucler Generating Station Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-219

Subject:

Commitment Change Summary Report -2014 Oyster Creek Nuclear Generating Station did not make any changes to its regulatory com'mitment during caedr year 2014. Th report is being sumte n acodac with the needed. Vice President Oyster Creek Nuclear Generating Statin cc:' USNRC Reglonl USNRCSenior Project Manager, Oyster Creek: "USNRC 1Rsdet Inspector, Oyster Creek 1 j4C

~Exetoreero NEI 99-04 RA-15-109 December 4, 2015 u.s. Nuclear Regultory Cmiso Attn: Doumn Controt Desk Washington, DC 20656-(X001 Oyster Creek Nucler Generating Station Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-219

Subject:

Commitment Change Summary Report -2014 Oyster Creek Nuclear Generating Station did not make any changes to its regulatory com'mitment during caedr year 2014. Th report is being sumte n acodac with the needed. Vice President Oyster Creek Nuclear Generating Statin cc:' USNRC Reglonl USNRCSenior Project Manager, Oyster Creek: "USNRC 1Rsdet Inspector, Oyster Creek 1 j4C