RA-15-109, Commitment Change Summary Report - 2014

From kanterella
(Redirected from RA-15-109)
Jump to navigation Jump to search
Commitment Change Summary Report - 2014
ML15351A408
Person / Time
Site: Oyster Creek
Issue date: 12/04/2015
From: Stathes G
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-15-109
Download: ML15351A408 (1)


Text

~Exetoreero NEI 99-04 RA-15-109 December 4, 2015 u.s. Nuclear Regultory Cmiso Attn: Doumn Controt Desk Washington, DC 20656-(X001 Oyster Creek Nucler Generating Station Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-219

Subject:

Commitment Change Summary Report - 2014 Oyster Creek Nuclear com'mitment Generating during caedr yearStation 2014. did Th notreport makeisany changes sumte to itsnregulatory being acodac with the needed.

Sincrey*,

Vice President Oyster Creek Nuclear Generating Statin cc:' *Adtilntsr&o, USNRC Reglonl ';--"*":

USNRCSenior Project Manager, Oyster Creek

"USNRC *Senior 1Rsdet Inspector, Oyster Creek 1 j4C

~Exetoreero NEI 99-04 RA-15-109 December 4, 2015 u.s. Nuclear Regultory Cmiso Attn: Doumn Controt Desk Washington, DC 20656-(X001 Oyster Creek Nucler Generating Station Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-219

Subject:

Commitment Change Summary Report - 2014 Oyster Creek Nuclear com'mitment Generating during caedr yearStation 2014. did Th notreport makeisany changes sumte to itsnregulatory being acodac with the needed.

Sincrey*,

Vice President Oyster Creek Nuclear Generating Statin cc:' *Adtilntsr&o, USNRC Reglonl ';--"*":

USNRCSenior Project Manager, Oyster Creek

"USNRC *Senior 1Rsdet Inspector, Oyster Creek 1 j4C