W3F1-2012-0049, License Amendment Request - Cyber Security Plan Implementation Schedule Milestones

From kanterella
(Redirected from W3F1-2012-0049)
Jump to navigation Jump to search

License Amendment Request - Cyber Security Plan Implementation Schedule Milestones
ML12181A348
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/28/2012
From: Jacobs D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML121840038 List:
References
TAC ME4271, W3F1-2012-0049
Download: ML12181A348 (3)


Text

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3 Portions of Attachments Contain Security-Related Information To Be Withheld Under 10 CFR 2.390 10CFR 73 W3F1-2012-0049 June 28, 2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

License Amendment Request - Cyber Security Plan Implementation Schedule Milestones Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

References:

1. NRC letter to Entergy, Issuance of Amendment Re: Approval of Cyber Security Plan (TAC ME4271), dated July 20, 2011 (ADAMS Accession No. ML111800021)
2. Entergy letter to NRC, Response to Additional Requests for Additional Information and Revision to the Waterford 3 Cyber Security Plan, dated April 4, 2011 (W3F1-2011-0021, ADAMS Accession No. ML110950122)

Dear Sir or Madam:

In Reference 1, the NRC issued license Amendment No. 234 to the Renewed Facility Operating License for Waterford 3 that approved the Waterford 3 Cyber Security Plan and associated implementation milestone schedule. The Cyber Security Plan Implementation Schedule contained in Reference 2 was utilized as a portion of the basis for the NRCs safety evaluation report provided by Reference 1. Entergy Operations, Inc. (Entergy) is planning to implement the requirements of Implementation Schedule Milestone 6 in a slightly different manner than described in the approved Implementation Schedule. Although no change to the Implementation Schedule date is proposed, the change to the description of the milestone activity is conservatively considered to be a change to the Implementation Schedule, and in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90, Entergy is submitting this request for an amendment to the Facility Operating License for Waterford 3.

The Waterford 3 Cyber Security Plan, Revision 0, was previously provided in Reference 2. provides an evaluation of the proposed change. Attachment 2 contains the proposed marked-up operating license page for the Physical Protection license condition for When Attachment 4 and Sections 1, 2, and 3 of Attachment 1 to this letter are removed, this document is decontrolled.

W3F1-2012-0049 Page 2 of 3 Waterford 3 to reference the change provided in this submittal. Attachment 3 contains the proposed revised operating license page. Attachment 4 contains a change to the scope of Implementation Milestone 6. Entergy requests that Attachments 1 (Sections 1, 2, and 3) and 4, which contain security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

The proposed change has been evaluated in accordance with 10 CFR 50.91(a)(1) using criteria in 10 CFR 50.92(c), and it has been determined that the change involves no significant hazards consideration. The bases for the determination is included in Attachment 1.

Entergy requests this license amendment be effective as of its date of issuance. Although this request is neither exigent nor emergency, your review and approval is requested prior to December 31, 2012.

The revised commitment contained in this submittal is summarized in Attachment 5. Should you have any questions concerning this letter, or require additional information, please contact Michael Mason, Licensing Manager (acting), at 504.739.6673.

I declare under penalty of perjury that the foregoing is true and correct. Executed on June 28, 2012.

Sincerely, DJ/JDW Attachments: 1. Analysis of Proposed Operating License Change (contains SRI)

2. Proposed Waterford 3 Operating License Change (mark-up)
3. Revised Waterford 3 Operating License Page
4. Revised Cyber Security Plan Implementation Schedule Milestone 6 (contains SRI)
5. List of Regulatory Commitments When Attachment 4 and Sections 1, 2, and 3 of Attachment 1 to this letter are removed, this document is decontrolled.

W3F1-2012-0049 Page 3 of 3 cc: Mr. Elmo E. Collins, Jr. RidsRgn4MailCenter@nrc.gov Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 E. Lamar Blvd.

Arlington, TX 76011-4511 NRC Senior Resident Inspector Marlone.Davis@nrc.gov Waterford Steam Electric Station Unit 3 Dean.Overland@nrc.gov P.O. Box 822 Killona, LA 70066-0751 (below w/o Security Related Information)

U. S. Nuclear Regulatory Commission Kaly.Kalyanam@nrc.gov Attn: Mr. N. Kalyanam Mail Stop O-07D1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Ji.Wiley@LA.gov Office of Environmental Compliance Surveillance Division P.O. Box 4312 Baton Rouge, LA 70821-4312 When Attachment 4 and Sections 1, 2, and 3 of Attachment 1 to this letter are removed, this document is decontrolled.