Supplement to License Amendment Request to Delete Vendor Recommended Diesel Generator Surveillance Requirement
ML063130047
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/07/2006
From: Ridgel J
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2006-0057
Download: ML063130047 (4)


Text

Entergy Nuclear South Entergy Operations, Inc.

a E--tergy 17265 River Road Killona, LA 70057-3093 Tel 504-739-6485 jridgel@entergy.com Jerry A. Ridgel Acting Nuclear Safety Assurance Director Waterford 3 W3F1-2006-0057 November 7, 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Supplement to License Amendment Request to Delete Vendor Recommended Diesel Generator Surveillance Requirement Waterford Steam Electric Station, Unit 3 Docket No. 50-382 License No. NPF-38

REFERENCES:

1. Entergy Letter to the NRC dated June 14, 2006, "License Amendment Request to Delete Vendor Recommended Diesel Generator Surveillance Requirement" (W3F1-2006-0027)

Dear Sir or Madam:

By letter (Reference 1), Entergy Operations, Inc. (Entergy) proposed a change to the Waterford Steam Electric Station, Unit 3 (Waterford 3) Technical Specifications (TSs) to delete the vendor recommended diesel generator surveillance requirement (SR) currently required by SR 4.8.1.1.2.f.

Based on conversations with your staff and upon approval of the proposed change, Waterford 3 commits to relocate the SR to the Technical Requirements Manual (TRM). Attachment 1 provides an updated list of the commitments associated with this license amendment request.

There are no technical changes proposed. The original no significant hazards consideration, included in Reference 1 is not affected by any information contained in this supplemental letter.

If you have any questions or require additional information, please contact Dana Millar at 601-368-5445.

I declare under penalty of perjury that the foregoing is true and correct. Executed on November 7, 2006.

Sincerely, Attachments:

1. List of Regulatory Commitments 4,ool

W3F1-2006-0057 Page 2 of 2 cc: Dr. Bruce S. Mallett U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Senior Resident Inspector Waterford 3 P.O. Box 822 Killona, LA 70066-0751 U.S. Nuclear Regulatory Commission Attn: Mr. Mel B. Fields MS O-7E1 Washington, DC 20555-0001 Louisiana Department of Environmental Quality Office of Environmental Compliance Surveillance Division P. O. Box 4312 Baton Rouge, LA 70821-4312 American Nuclear Insurers Attn: Library 95 Glastonbury Blvd.

Suite 300 Glastonbury, CT 06033-4443

Attachment 1 W3F1-2006-0057 List of Regulatory Commitments to W3F1-2006-0057 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATE (If ACTION Required)

The manufacturer's recommended inspections of the EDG required by this surveillance are included in plant procedures and will continue to be included X in plant procedures upon approval of this amendment.

Surveillance Requirement 4.8.1.1.2.f will be 60 days after relocated to the Waterford 3 Technical X approval of Requirements Manual. requested change