Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23345A084 | 28 November 2023 | Technical Requirements Manual |
ML23345A088 | 28 November 2023 | Technical Requirements Manual |
ML19290H034 | 5 December 2019 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident |
ML19161A137 | 15 May 2019 | Technical Specification Bases Manual |
ML19163A188 | 15 May 2019 | Unit, Technical Specification Bases Manual |
ML17223A198 | 21 July 2017 | Part 21 Notification - Eaton/Cutler Hammer A200 Series Starter |
ML16334A264 | 17 November 2016 | Technical Specification Bases Manual |
ML16334A265 | 17 November 2016 | Technical Specification Bases Manual |
ML15317A009 | 5 November 2015 | Technical Specifications Bases Manual |
ML15317A010 | 5 November 2015 | Technical Specifications Bases Manual |
ML15296A059 | 16 October 2015 | Enclosure 1, Response to NRC Request for Additional Information Regarding License Amendment Request to Adopt Nuclear Energy Institute 99-0 1, Revision 6 and Enclosure 2, Mark-up of the Changes Made to the SSES EAL Basis.. |
ML15296A060 | 16 October 2015 | Enclosure 3, Revised (Clean) Copy of the SSES EAL Basis Document Which Includes the Changes Made in Enclosure 2 |
ML15296A052 | 15 October 2015 | Attachments 1 Through 9 - EP-RM-004 to Enclosure 3 to PLA-7399 Mark-up of Proposed Additional Changes Made to the SSES EAL Basis Document |
ML15296A053 | 15 October 2015 | Enclosure 4 to PLA-7399 Revised (Clean) Copy of the SSES EAL Basis Document |
PLA-7285, Revision (X) to EP-RM-004, EAL Classification Bases | 19 March 2015 | Revision (X) to EP-RM-004, EAL Classification Bases |
ML14156A234 | 16 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (MF0288 and MF0289) |
ML14056A449 | 6 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tacs MF0183, MF0184) |
ML14113A555 | 23 April 2014 | Draft Staff Assessment of Seismic Walkdown Report Near-term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident; PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit 1. Docket No. 50-387 |
ML13228A283 | 1 August 2013 | Susquehanna - Handouts to Applicants (Folder 3) |
PLA-6938, Response to Request for Information Pursuant to 10 CFR 50.54 (F) Regarding Results of the SSES Flooding Walkdown (References 1 and 2) PLA-6938 | 21 November 2012 | Response to Request for Information Pursuant to 10 CFR 50.54 (F) Regarding Results of the SSES Flooding Walkdown (References 1 and 2) PLA-6938 |
IR 05000387/2012003 | 10 August 2012 | IR 05000387-12-003, 05000388-12-003, 04/01/2012 - 06/30/2012; Susquehanna Steam Electric Station, Units 1 and 2; Maintenance Effectiveness, Operability Evaluations |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML102360347 | 26 February 2010 | E-Mail from Thomas to Rosebrook Et Al., Subject: Ioeb Screening Summary for Friday, February 26, 2010 |
ML091390629 | 7 May 2009 | Revisions to Technical Specifications Bases, Manual |
ML081270181 | 24 April 2008 | Revisions to Technical Specification Bases Unit 1 Manual |
ML061420528 | 11 May 2006 | Technical Specifications Bases Unit 1 Manual, Rev. 74 |
ML061420525 | 11 May 2006 | Technical Specifications Bases Unit 2 Manual, TSB2, Revision 72 |
ML061230675 | 24 April 2006 | Technical Specification Bases Unit 1 Manual, Revision 72 |
ML061240104 | 24 April 2006 | Technical Specification Bases Unit 2 Manual |
PLA-5933, Proposed Amendment No. 280 to Unit 1, and Proposed Amendment No. 249 to Unit 2, Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. | 5 October 2005 | Proposed Amendment No. 280 to Unit 1, and Proposed Amendment No. 249 to Unit 2, Revise Technical Specification 3.4.10, RCS Pressure and Temperature (P/T) Limits. |
PLA-5632, Letter Transmitting for NRC Review and Approval, Revisions to Susquehanna Ses Emergency Action Levels | 27 October 2003 | Letter Transmitting for NRC Review and Approval, Revisions to Susquehanna Ses Emergency Action Levels |
ML023180500 | 7 November 2002 | Approved Amendment to Technical Specifications Bases Manual, Revision 33 |
ML023190064 | 7 November 2002 | Revision to Improved Technical Specifications Manual Bases Unit 1 |
ML18017A293 | 6 January 1998 | Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
ML18017A289 | 13 February 1997 | Responds to RAI Re Adequacy & Availability of Design Bases Info |
ML18017A283 | 2 October 1995 | Responds to NRC Staff Questions on Rev of Emergency Plan That Implemented NUMARC NESP-007 |
ML18030A389 | 13 December 1994 | Informs of Completion of Review of Ref Draft Final SE Re Spent Fuel Pool Cooling for Factual Accuracy |
ML071040017 | 28 April 1994 | 59 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations |
ML20058M030 | 10 September 1993 | Forwards Listed Info,In Response to Asking NRC to Address Issues Raised in Ltr from Constituent Me Lampert Re Problems at Pilgrim,W/Exception of Issue of Loss of Power & Fpc.Issue of Loss of off-site Power & FPC Related to SSES |
ML18026A248 | 27 November 1992 | Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling |
ML17157C142 | 21 October 1992 | Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. |
ML17157C140 | 31 August 1992 | Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. |
ML17157C138 | 27 July 1992 | Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. |
NRC Generic Letter 1992-02 | 6 March 1992 | NRC Generic Letter 1992-002: Resolution of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown. |
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability |
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping | 13 June 1991 | Thermal Stratification in Feedwater System Piping |
ML18030A075 | 22 October 1990 | Discusses Util Current Approach Re Reportability of Design Issues & Regulatory Analysis |