Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML22263A41820 September 2022Enclosure F - DBNPS, Unit 1, Technical Specification Bases, Rev. 32
ML21137A29218 February 2021Proposed Admin JPMs
ML20304A30417 November 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident
ML20302A28725 September 20209 to Tech Spec Bases
ML19031C9304 March 2019NRC Response to Request for Deferral of Actions Related to Beyond- Design-Basis Flooding Hazard Reevaluations for Davis-Besse Nuclear Power Station, Unit 1
ML18249A10920 September 2018Documentation of the Completion of Required Actions Taken in Response to Fukushima Lessons Learned
L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....12 April 2018Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile....
05000346/LER-2017-00118 September 2017Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles
LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles
IR 05000346/201600426 January 2017NRC Integrated Inspection Report 05000346/2016004; 05000346/2016501
05000346/LER-2016-00615 August 2016Potential to Trip Emergency Diesel Generator on High Crankcase Pressure
LER 16-006-00 for Davis-Besse Nuclear Power Station Unit 1 RE: Potential to Trip Emergency Diesel Generator on High Crankcase Pressure
IR 05000346/201600225 July 2016NRC Integrated Inspection Report 05000346/2016002, April 1, 2016 Through June 30, 2016
IR 05000346/201600126 April 2016NRC Integrated Inspection Report 05000346/2016001, January 1, 2016, Through March 31, 2016, and Assessment Follow-up Letter
IR 05000346/201500321 October 2015IR 05000346/2015003; on 07/01/2015 - 09/30/2015; Davis-Besse Nuclear Power Station; Follow-Up of Events and Notices of Enforcement Discretion
IR 05000346/201500810 April 2015IR 05000346/2015008, 01/26/2015 - 02/27/2015; Davis-Besse Nuclear Power Station; Component Design Bases Inspection
IR 05000346/201400528 January 2015IR 05000346/2014005; on 10/1/14 - 12/31/14; Davis-Besse Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
ML14141A52530 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
ML14134A51730 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident
IR 05000346/201400223 April 2014IR 05000346-14-002; 1/1/14 - 3/31/14; Davis-Besse Nuclear Power Station; Fire Protection; Outage Activities
ML14122A03122 April 2014Comment (23) of Kevin Kamps on License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1; Draft Supplemental Generic Environmental Impact Statement
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns
L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident27 November 2012FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
ML12229A58416 August 2012Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking)
IR 05000346/201200223 April 2012IR 05000346-12-002, on 1/1/2012-3/31/2012; Davis-Besse Nuclear Power Station; Correction of Emergency Preparedness Weaknesses and Deficiencies
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12200A21117 November 2011Email from P. Hernandez, NRR to M. Evans, NRR Et Al., on Davis Besse Operability Question
ML12200A20917 November 2011Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Davis Besse Operability Question
IR 05000346/201100426 October 2011IR 05000346-11-004, on 7/1/2011-9/30/2011; Davis-Besse Nuclear Power Station; Operability Evaluations, Identification and Resolution of Problems, and Other Activities
ML11193A20326 July 2011Final Response to TIA 2011-001, Davis-Besse Nuclear Power Station Safety-Related Batteries Electrical Separation Design and Licensing Bases
ML10208001923 July 2010IR 05000346-10-003 on 4/1/10-6/30/10 for Davis-Besse Nuclear Power Station, Operability Evaluations
IR 05000346/201000227 April 2010IR 05000346-10-002, on 1/1/10-3/31/10, Davis-Besse Nuclear Power Station, Flooding, Annual Heat Sink Performance, and Refueling Outage Activities
ML10236034726 February 2010E-Mail from Thomas to Rosebrook Et Al., Subject: Ioeb Screening Summary for Friday, February 26, 2010
ML08290060020 November 2008Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues
ML0824902622 October 2008Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD
ML08148046816 May 2008Improved Technical Specification Conversion License Amendment Request, Volume 9, (Revision 1), Section 3.4 - Reactor Coolant System (RCS)
ML0722004723 August 2007Volume 9, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.4 Reactor Coolant System.
IR 05000346/200500728 July 2005IR 05000346-05-007; on 5/14/2005 - 6/30/2005; for Davis-Besse Nuclear Power Station; Fire Protection and Event Followup
IR 05000346/20040065 May 2004IR 05000346-04-006; 2/15/2004 - 3/31/2004; Davis-Besse Nuclear Power Station; Other Activities
ML0406800705 March 2004IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness
ML03304001929 October 2003Transmittal of Airs Database Operating Experience Reports
ML03247082829 August 2003Annual Report of Changes to the Emergency Core Cooling System Evaluation Model in Accordance with 10 CFR 50.46(a)(3)
ML03212036030 July 2003IR 05000346-03-015, on 05/18/03 - 06/30/03, Firstenergy Nuclear Operating Co., Davis-Besse Nuclear Power Station. Event Followup, Maintenance Effectiveness, Personnel Performance During Nonroutine Plant Evolutions
ML04294019227 February 2002Condition Report No. 02-00891
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
ML07104001728 April 199459 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
IR 05000346/199301622 December 1993Insp Rept 50-346/93-16 on 930927-1116.Violations Noted.Major Areas Inspected:Mechanical Design,Operational Control, Maintenance & Surveillance of SWS
ML20101R1638 July 1992Forwards Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program
ML20101R17211 June 1992Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program