Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22263A418 | 20 September 2022 | Enclosure F - DBNPS, Unit 1, Technical Specification Bases, Rev. 32 |
ML21137A292 | 18 February 2021 | Proposed Admin JPMs |
ML20304A304 | 17 November 2020 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident |
ML20302A287 | 25 September 2020 | 9 to Tech Spec Bases |
ML19031C930 | 4 March 2019 | NRC Response to Request for Deferral of Actions Related to Beyond- Design-Basis Flooding Hazard Reevaluations for Davis-Besse Nuclear Power Station, Unit 1 |
ML18249A109 | 20 September 2018 | Documentation of the Completion of Required Actions Taken in Response to Fukushima Lessons Learned |
L-18-108, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... | 12 April 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformance Identified in Response to Regulatory Issue Summary 2015-06, Tornado Missile.... |
05000346/LER-2017-001 | 18 September 2017 | Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles LER 17-001-00 for Davis-Besse, Unit 1, Regarding Emergency Diesel Generator Fuel Oil Storage Tank Vents Not Adequately Protected from Tornado-Generated Missiles |
IR 05000346/2016004 | 26 January 2017 | NRC Integrated Inspection Report 05000346/2016004; 05000346/2016501 |
05000346/LER-2016-006 | 15 August 2016 | Potential to Trip Emergency Diesel Generator on High Crankcase Pressure LER 16-006-00 for Davis-Besse Nuclear Power Station Unit 1 RE: Potential to Trip Emergency Diesel Generator on High Crankcase Pressure |
IR 05000346/2016002 | 25 July 2016 | NRC Integrated Inspection Report 05000346/2016002, April 1, 2016 Through June 30, 2016 |
IR 05000346/2016001 | 26 April 2016 | NRC Integrated Inspection Report 05000346/2016001, January 1, 2016, Through March 31, 2016, and Assessment Follow-up Letter |
IR 05000346/2015003 | 21 October 2015 | IR 05000346/2015003; on 07/01/2015 - 09/30/2015; Davis-Besse Nuclear Power Station; Follow-Up of Events and Notices of Enforcement Discretion |
IR 05000346/2015008 | 10 April 2015 | IR 05000346/2015008, 01/26/2015 - 02/27/2015; Davis-Besse Nuclear Power Station; Component Design Bases Inspection |
IR 05000346/2014005 | 28 January 2015 | IR 05000346/2014005; on 10/1/14 - 12/31/14; Davis-Besse Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control |
ML14245A386 | 29 August 2014 | NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014) |
ML14141A525 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident |
ML14134A517 | 30 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident |
IR 05000346/2014002 | 23 April 2014 | IR 05000346-14-002; 1/1/14 - 3/31/14; Davis-Besse Nuclear Power Station; Fire Protection; Outage Activities |
ML14122A031 | 22 April 2014 | Comment (23) of Kevin Kamps on License Renewal Application for Davis-Besse Nuclear Power Station, Unit 1; Draft Supplemental Generic Environmental Impact Statement |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns |
L-12-347, FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident | 27 November 2012 | FENOC Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Flooding Aspects of Recommendation 2.3 of Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident |
ML12229A584 | 16 August 2012 | Intervenors' Fifth Motion to Amend And/Or Supplement Proposed Contention No. 5 (Shield Building Cracking) |
IR 05000346/2012002 | 23 April 2012 | IR 05000346-12-002, on 1/1/2012-3/31/2012; Davis-Besse Nuclear Power Station; Correction of Emergency Preparedness Weaknesses and Deficiencies |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12200A211 | 17 November 2011 | Email from P. Hernandez, NRR to M. Evans, NRR Et Al., on Davis Besse Operability Question |
ML12200A209 | 17 November 2011 | Email from P. Hernandez, NRR to E. Sanchez Santiago, Rill on Davis Besse Operability Question |
IR 05000346/2011004 | 26 October 2011 | IR 05000346-11-004, on 7/1/2011-9/30/2011; Davis-Besse Nuclear Power Station; Operability Evaluations, Identification and Resolution of Problems, and Other Activities |
ML11193A203 | 26 July 2011 | Final Response to TIA 2011-001, Davis-Besse Nuclear Power Station Safety-Related Batteries Electrical Separation Design and Licensing Bases |
ML102080019 | 23 July 2010 | IR 05000346-10-003 on 4/1/10-6/30/10 for Davis-Besse Nuclear Power Station, Operability Evaluations |
IR 05000346/2010002 | 27 April 2010 | IR 05000346-10-002, on 1/1/10-3/31/10, Davis-Besse Nuclear Power Station, Flooding, Annual Heat Sink Performance, and Refueling Outage Activities |
ML102360347 | 26 February 2010 | E-Mail from Thomas to Rosebrook Et Al., Subject: Ioeb Screening Summary for Friday, February 26, 2010 |
ML082900600 | 20 November 2008 | Issuance of Amendment 279 for the Conversion to the Improved TSs with Beyond Scope Issues |
ML082490262 | 2 October 2008 | Draft Safety Evaluation for Conversion to ITS with Beyond Scope Issues, (TAC MD |
ML081480468 | 16 May 2008 | Improved Technical Specification Conversion License Amendment Request, Volume 9, (Revision 1), Section 3.4 - Reactor Coolant System (RCS) |
ML072200472 | 3 August 2007 | Volume 9, Revision 0, Davis-Besse, Unit 1 - Improved Technical Specifications Conversion, ITS Section 3.4 Reactor Coolant System. |
IR 05000346/2005007 | 28 July 2005 | IR 05000346-05-007; on 5/14/2005 - 6/30/2005; for Davis-Besse Nuclear Power Station; Fire Protection and Event Followup |
IR 05000346/2004006 | 5 May 2004 | IR 05000346-04-006; 2/15/2004 - 3/31/2004; Davis-Besse Nuclear Power Station; Other Activities |
ML040680070 | 5 March 2004 | IR 05000346-03-010(DRS); 03/17/2003 - 01/07/2004; Davis-Besse Nucler Power Station; Corrective Action Program Implementation Effectiveness |
ML033040019 | 29 October 2003 | Transmittal of Airs Database Operating Experience Reports |
ML032470828 | 29 August 2003 | Annual Report of Changes to the Emergency Core Cooling System Evaluation Model in Accordance with 10 CFR 50.46(a)(3) |
ML032120360 | 30 July 2003 | IR 05000346-03-015, on 05/18/03 - 06/30/03, Firstenergy Nuclear Operating Co., Davis-Besse Nuclear Power Station. Event Followup, Maintenance Effectiveness, Personnel Performance During Nonroutine Plant Evolutions |
ML042940192 | 27 February 2002 | Condition Report No. 02-00891 |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
ML071040017 | 28 April 1994 | 59 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations |
IR 05000346/1993016 | 22 December 1993 | Insp Rept 50-346/93-16 on 930927-1116.Violations Noted.Major Areas Inspected:Mechanical Design,Operational Control, Maintenance & Surveillance of SWS |
ML20101R163 | 8 July 1992 | Forwards Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program |
ML20101R172 | 11 June 1992 | Rev 1 to Vol I of Inservice Insp Plan,Second 10-Yr Nuclear Interval Pump & Valve Inservice Testing Program |