Semantic search

Jump to navigation Jump to search
 Issue dateTitle
NRC-2023-0107, Comment (6) of T. Forland on Behalf of Ameren Missouri - Callaway Plant on Draft Regulatory Guide: Weather-Related Administrative Controls at Independent Spent Fuel Storage Installations3 July 2023Comment (6) of T. Forland on Behalf of Ameren Missouri - Callaway Plant on Draft Regulatory Guide: Weather-Related Administrative Controls at Independent Spent Fuel Storage Installations
ML23067A18429 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.4, Reactor Coolant System
ML22027A80727 January 2022Enclosure 2: Callaway, Unit 1, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02
ULNRC-06690, Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138)27 January 2022Enclosure 5: Callaway, Unit 1, LAR Supplement to Address Audit Discussion Points Summarized in NRC Letter Dated September 14, 2021 (ML21238A138)
ULNRC-06651, License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-0222 July 2021License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02
ML21194A27022 June 2021Technical Specification Bases, Chapter B 3.4, Reactor Coolant System
ML21090A18731 March 2021Enclosure 2 - License Amendment Request for Callaway Risk-Informed Approach to Resolution of Generic Letter 2004-02
ML20352A14023 December 2020Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-Ichi Accident
ML20209A10813 November 2019Technical Specifications Bases, Chapter B 3.4, Reactor Coolant System
IR 05000483/20180013 May 2018NRC Integrated Inspection Report 05000483/2018001
IR 05000483/201700331 October 2017NRC Integrated Inspection Report 05000483/2017003 and Exercise of Enforcement Discretion
05000483/LER-2017-00213 October 2017Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design
LER 17-002-00 for Callaway Plant, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design
ML17270A17220 September 20172017-09-FINAL Op Test
05000483/LER-2016-00120 June 2016Control Room Air Conditioning Inoperability Due To Essential Service Water Pressure Transient
LER 16-001-00 for Callaway, Unit 1, Regarding Control Room Air Conditioning Inoperability Due to Essential Service Water Pressure Transient
ML16158A4571 June 20162016-06 Draft Written Examination
ML15105A34623 March 2015NSAL-15-2 - Impact of a Break in the Reactor Coolant Pump No. 1 Seal Leak-off Line Piping on Seal Leakage During a Loss of Seal Cooling Event
IR 05000483/20140086 November 2014IR 05000483/2014008; on 08/11/2014 - 09/23/2014; Callaway Plant; Problem Identification and Resolution (Biennial)
ML14245A38629 August 2014NRDC V. NRC Et. Al., No. 13-1311 (Scheduled Oral Argument November. 21, 2014)
ML14122A38616 May 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident
ML14083A41111 April 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident
ML14015A02231 December 2013WCAP-17675-NP, Supplement 1, Rev. 0, Ameren Missouri Callaway Energy Center Supplemental Information for Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report.
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns
ML13071A3166 February 2013124939/13, Rev. 0, Callaway Energy Center Unit 1 Flooding Hazard Reevaluation Report. Part 1 of 2
ULNRC-05967, 124939/13, Rev. 0, Callaway Energy Center Unit 1 Flooding Hazard Reevaluation Report. Part 1 of 26 February 2013124939/13, Rev. 0, Callaway Energy Center Unit 1 Flooding Hazard Reevaluation Report. Part 1 of 2
ULNRC-05934, PEUS-WR-12-4, Rev. 1, Post Fukushima Flooding Walkdown Report for Callaway Energy Center.27 November 2012PEUS-WR-12-4, Rev. 1, Post Fukushima Flooding Walkdown Report for Callaway Energy Center.
IR 05000483/201200223 April 2012IR 05000483-12-002; 01/01-03/27/2012; Callaway Plant, Integrated Resident and Regional Report; Event Follow-up
ML12053A34012 March 2012Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident
ML12056A05012 March 2012Enclosure 4 - Recommendation 2.3: Flooding
ML12056A04912 March 2012Enclosure 3 - Recommendation 2.3: Seismic
IR 05000483/20110057 February 2012IR 05000483-11-005, 09/24/2011 - 12/31/2011; Callaway Plant; Integrated Resident and Regional Report; Inservice Inspection Activities, Licensed Operator Requalification, Maintenance Risk Assessments and Emergent Work Control, Postmaintenanc
ML11292A19018 January 2012Supporting Document and Examples for Information Notice Sblc and RWST Issues
IR 05000483/20110024 May 2011IR 05000483-11-002; 01/01/2011 - 03/24/2011; Callaway Plant, Integrated Resident and Regional Report, Operability Evaluations and Identification and Resolution of Problems
IR 05000483/201000617 December 2010IR 05000483-10-006, on 10/18/2010 - 11/05/2010, Callaway Plant, Biennial Baseline Inspection of the Identification and Resolution of Problems
IR 05000483/20100043 November 2010IR 05000483-10-004, on 06/24/2010 Through 09/23/2010, Callaway Plant
IR 05000483/200900520 January 2010IR 05000483-09-005 on 09/24/09 - 12/31/09 for Callaway, Integrated Resident and Regior Report; Flood Protection Measures, Operability Evaluations and Surveillance Testing
IR 05000483/200601226 December 2006IR 05000483/2006012, on 10/16/2006 - 11/30/2006, Callaway, Biennial Inspection of the Identification and Resolution of Problems
ULNRC-05322, Application for Amendment to License No. NPF-30, Relocation of Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report Adoption of Industry Travelers TSTS-339 and TSTS-36317 August 2006Application for Amendment to License No. NPF-30, Relocation of Technical Specification Cycle-Specific Parameters to the Core Operating Limits Report Adoption of Industry Travelers TSTS-339 and TSTS-363
ML06156009310 March 2005CW-08-2005-Draft Written Examination
ML06156013910 March 2005CW-08-2005-Final Written Examination
IR 05000483/200400510 February 2005IR 05000483-04-005, on 09/24/2004 - 12/31/2004; Callaway Plant: Fire Protection, Personnel Performance During Nonroutine Plant Evolutions, Identification and Resolution of Problems, Other Activities
IR 05000483/20040045 November 2004IR 05000483-04-004 on 06/24 - 06/23/2004 for Callaway Plant. Personnel Performance During Nonroutine Plant Evolutions, Operability Evaluations and Postmaintenance Testing
ULNRC-05070, Deletion of Operating License Section 2.F, Deletion or Revision of License Conditions and Revision to Technical Specification Tables 5.5.9-2 and 5.5.9.327 October 2004Deletion of Operating License Section 2.F, Deletion or Revision of License Conditions and Revision to Technical Specification Tables 5.5.9-2 and 5.5.9.3
IR 05000483/200400620 May 2004IR 05000483-04-006, on 03/22/04 Through 05/18/04, for Callaway Plant; Identification and Resolution of Problems, Barrier Integrity
IR 05000483/20030065 February 2004IR 05000483-03-006, on 09/21 - 12/31/03; Callaway Plant. Personnel Performance During Nonroutine Plant Evolutions, as Low as Reasonably Achievable Planning and Controls, and Event Followup
IR 05000483/200300515 October 2003IR 05000483-03-005 on 06/22 - 09/20/03; Callaway Plant. Identification and Resolution of Problems and Event Followup
ULNRC-04892, Request for Additional Information on November 2002 Steam Generator Tube Inspection22 August 2003Request for Additional Information on November 2002 Steam Generator Tube Inspection
ML20207F48027 May 1999Proposed Improved TSs & ITS Bases
IR 05000483/19980184 December 1998Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures9 July 1997Inadequate or Inappropriate Interim Fire Protection Compensatory Measures
ML20137C92020 March 1997Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement