Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
IR 05000458/2018012 | 25 June 2019 | Revised NRC Baseline Inspection Report 05000458/2018012 |
IR 05000458/2019001 | 10 May 2019 | NRC Integrated Inspection Report 05000458/2019001 |
IR 05000458/2018003 | 8 November 2018 | NRC Integrated Inspection Report 05000458/2018003 |
RBG-47906, Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 | 18 October 2018 | Response to Request for Additional Information for License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 |
RBG-47865, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06 ... | 10 May 2018 | Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06 ... |
RBG-47824, License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves | 2 April 2018 | License Amendment Request to Correct a Non-Conservative Technical Specification Figure 3.4.11-1 Minimum Temperature Required Vs. RCS Pressure by Replacing with 54 Effective Full Power Years (EFPY) Curves |
RBG-47803, Response to License Renewal Application (LRA) NRC Request for Additional Information, Severe Accident Mitigation Alternatives | 5 December 2017 | Response to License Renewal Application (LRA) NRC Request for Additional Information, Severe Accident Mitigation Alternatives |
ML17237C041 | 15 September 2017 | Documentation of the Completion of Required Actions Taken in Response to Fukushima Lessons Learned |
05000458/LER-2017-002 | 18 April 2017 | Loss of Safety Function of Onsite Electrical Distribution Due to Malfunction of Control Building HVAC System LER 17-002-00 for River Bend Station, Unit 1, Regarding Loss of Safety Function of Onsite Electrical Distribution Due to Malfunction of Control Building HVAC System |
IR 05000458/2015001 | 7 May 2015 | IR 05000458/2015001; on 01/01/2015 - 03/31/2015; River Bend Station; Integrated Resident and Regional Report; Operability Determinations and Functionality Assessments; Plant Modifications; Problem Identification and Resolution |
IR 05000458/2014004 | 31 October 2014 | IR 05000458/2014004; on 07/01/2014 - 09/30/2014; River Bend Station; Integrated Resident and Regional Report; Radiological Hazard Assessment and Exposure Controls |
ML14148A150 | 20 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14073A548 | 1 May 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14111A404 | 27 March 2014 | 2014-03-Draft Operating Test |
RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs | 28 May 2013 | License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs |
RBG-47307, Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. | 14 November 2012 | Engineering Report RBS-CS-12-00001, Rev. 000, River Bend Station Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. |
IR 05000458/2012009 | 7 August 2012 | IR 05000458-12-009, on 05/26/2012 & 07/11/2012, River Bend Station, Augmented Inspection Team |
ML12125A308 | 2 May 2012 | Calculation G13-18.3.1-005, Revision 0, Degraded Voltage Relay Setpoints for E22-S004 |
ML12125A307 | 2 May 2012 | Calculation G13.18.3.1-004, Revision 0, Degraded Voltage Relay Setpoints for ENS-SWG01A and ENS-SWG01B |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12261A491 | 31 January 2012 | Licensee Calculations Related to License Amendment Request to Revise TS 3.3.8.1, Loss of Power Instrumentation, to Extend Frequency of SR 3.3.8.1.3 and Revise AVs for Certain Functions |
RBG-47193, License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes | 8 December 2011 | License Amendment Request 2011-05 Degraded Voltage Surveillance Frequency Extension and Allowable Value Changes |
ML101690164 | 17 June 2010 | IR 05000458-10-006; Entergy Operations, Inc.,; 04/05/2010 - 06/02/2010; River Bend Station, NRC Triennial Fire Protection Inspection and Notice of Violation |
IR 05000458/2010006 | 17 June 2010 | IR 05000458-10-006; Entergy Operations, Inc.,; 04/05/2010 - 06/02/2010; River Bend Station, NRC Triennial Fire Protection Inspection and Notice of Violation |
IR 05000458/2009002 | 8 May 2009 | IR 05000458-09-002, on 01/01/2009 - 03/31/2009, River Bend Station |
ML090640447 | 9 March 2009 | Enclosure 13: Case Study 9: River Bend Shutdown as an Alternative to Other Actions - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf |
ML070740767 | 15 March 2007 | IR 05000458-07-006 on 1/29/07 - 2/15/07 for Entergy Operations, Inc.; River Bend Station; Fire Protection (Triennial) |
ML061790189 | 22 June 2006 | NRC Response to Entergy Operations, Inc. Denial of Noncited Violation 05000458/2005005-02 |
RBG-46129, Revision to License Amendment Request (LAR) 2002-01, Reporting Requirements for Operating License Condition Violations and Monthly Operating Reports. | 28 May 2003 | Revision to License Amendment Request (LAR) 2002-01, Reporting Requirements for Operating License Condition Violations and Monthly Operating Reports. |
RBG-45990, License Amendment Request 2002-23 Re Request for a Change to the Reactor Vessel Material Surveillance Program from River Bend Station, Unit 1 | 15 August 2002 | License Amendment Request 2002-23 Re Request for a Change to the Reactor Vessel Material Surveillance Program from River Bend Station, Unit 1 |
RBG-45946, Entergy Nuclear- South, River Bend Station, Unit-1, License Amendment LAR 2002-11 Modification of the Technical Specification Surveillance Requirements for the Safety/Relief Valves | 14 May 2002 | Entergy Nuclear- South, River Bend Station, Unit-1, License Amendment LAR 2002-11 Modification of the Technical Specification Surveillance Requirements for the Safety/Relief Valves |
RBG-45935, Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases | 10 April 2002 | Part B - Revisions 58 -76 to River Bend Station Technical Requirements Manual & Technical Specification Bases |
RBG-45910, License Amendment Request 2002-01 Re Reporting Requirements for Operating License Condition Violations and Monthly Operating Reports. | 20 March 2002 | License Amendment Request 2002-01 Re Reporting Requirements for Operating License Condition Violations and Monthly Operating Reports. |
ML20155E163 | 25 September 1998 | Petition Per 10CFR2.206 Requesting That Plant Be Immediately Shut Down & OL Suspended or Modified Until Such Time That Facility Design & Licensing Bases Properly Updated to Permit Operation with Failed Fuel Assemblies |
RBG-44408, Forwards Rev 9 to UFSAR for River Bend Station,Unit 1.Rev Contains Changes Made During Period of 960213-0806 | 4 March 1998 | Forwards Rev 9 to UFSAR for River Bend Station,Unit 1.Rev Contains Changes Made During Period of 960213-0806 |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
ML20137C920 | 20 March 1997 | Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement |
RBG-43560, Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits | 10 January 1997 | Application for Amend to License NPF-47,requesting Rev to TS 3.4.11 Re RCS Pressure & Temp Limits |
ML20133F173 | 7 January 1997 | Insp Rept 50-458/96-16 on 961103-1214.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support |
RBG-43042, License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl | 29 August 1996 | License Amend Request 96-35 Re Reactor Vessel Matl Surveillance Program Capsule Withdrawal Schedule. GE-NE-B1301807-02, Surveillance Specimen Program Evaluation for River Bend Station Encl |
ML20058K600 | 8 December 1993 | Forwards Tia,Interpretation of Reporting Requirements, 93TIA006 Re Multiple Failures of safety-related Components |
NRC Generic Letter 1992-02 | 6 March 1992 | NRC Generic Letter 1992-002: Resolution of Generic Issue 79, Unanalyzed Reactor Vessel (PWR) Thermal Stress During Natural Convection Cooldown. |
ML031140549 | 7 November 1991 | Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on Operability |
Information Notice 1991-38, Thermal Stratification in Feedwater System Piping | 13 June 1991 | Thermal Stratification in Feedwater System Piping |
ML20058N803 | 14 August 1990 | Forwards Branch Input for Salp,Based on 900521-0622 Electrical Distribution Sys Functional Insp |
IR 05000458/1990200 | 26 July 1990 | Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support |
IR 05000458/1989027 | 12 July 1989 | Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities |
Information Notice 1989-55, Degradation of Containment Isolation Capability by a High-Energy Line Break | 30 June 1989 | Degradation of Containment Isolation Capability by a High-Energy Line Break |