TAC:48373
From kanterella
(Redirected from TAC:48374)
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Questions Answers | |
| From | |
MONTHYEARML19270G8051979-05-15015 May 1979
[table view]Summary of 790511 Meeting W/Util in Bethesda,Md Re Auxiliary Feedwater Sys.List of Attendees & Matl Discussed Encl ML20150F1621979-05-22022 May 1979 Submits Formal Responses to 790510 Questionnaire Re Pressurizer Heater,Loss of Feedwater Event & Steam Generator ML19225C9181979-06-0404 June 1979 Requests Status of Lll Electrical Staff Overpressure & Flooding Reviews ML19246C4101979-06-11011 June 1979 Forwards NRC to Westinghouse Requesting Addl Info Re Small Break LOCA Analyses & Analysis Methods.Nrc Will Eventually Require Documentation Re Applicability of Westinghouse Results to Analyses at Facility ML19209A4201979-09-21021 September 1979 Forwards NRC Requirements for Auxiliary Feedwater Sys & Requests That Plant Designs & Procedures Be Evaluated Against Applicable Requirements to Determine Degree of Conformity ML19259D6551979-10-20020 October 1979 Forwards Response to NRC Requesting Commitments to Implement NUREG-0578 Recommendations.Design Differences Decrease Chance of TMI-type Accident ML19290B7341979-10-29029 October 1979 Submits Partial Response to Re short-term & long-term Requirements for Auxiliary Feedwater Sys.Requests Extension Until 800131 for Remaining Requirements ML19320D5181979-12-0707 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump ML19256G1021979-12-17017 December 1979 Responds to NRC 791210 Request for Addl Info on TMI Lessons Learned Task Force Recommendations Re Auxiliary Feedwater Sys.Oversize Drawings Available in Central Files ML19256G2521979-12-17017 December 1979 Forwards Modified Response to Previous Commitment to Implement NUREG-0578.Util Will Provide Alarms in Addition to Existing Position Indication for Power Operated Relief Valves for Both Units ML19320D5261979-12-23023 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pumps ML19320D5231979-12-26026 December 1979 Seventy-Two Hour Test of Electrically-Driven Auxiliary Feed Pump ML19320D5111979-12-28028 December 1979 Seventy-Two Hour Test of Turbine-Driven Auxiliary Feed Pump ML19257C5411980-01-22022 January 1980 Forwards Small Break LOCA Operator Guidelines.Min RCS Subcooling Margin Set at 36 F Prior to Terminating Safety Injection ML19260D8281980-02-0404 February 1980 Responds to NRC 790921 Request for Evaluation of Requirements for Auxiliary Feedwater Sys & Associated Schedule & Commitment for Implementation of Required Changes & Actions ML19316A7831980-05-16016 May 1980 Forwards Request for Addl Responses to NRC Long & short-term Recommendations Re Auxiliary Feedwater Sys.Open Items Must Be Resolved Acceptably Before Safety Evaluation Can Be Issued.Responses Needed within 45 Days ML19320D5021980-07-0808 July 1980 Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys ML19320D4771980-07-0808 July 1980 Forwards Revised Tech Spec 15.3.4 for Steam & Power Conversion Sys & Four 72-h Test Repts for Auxiliary Feed Pump in Response to NRC 800516 Request for Addl Info Re Auxiliary Feedwater Sys ML19350D3491981-04-0909 April 1981 Responds to 810127 Request for Response to Unresolved Items Identified in Safety Evaluation for Auxiliary Feedwater Sys, Including short-term Recommendation GS-1 Re Tech Specs & Recommendation Re Redundant Level Indications ML20041G4231982-03-16016 March 1982 Submits Synopsis of Items Discussed During 820302 Telcon Re Automatic Initiation Features of Auxiliary Feedwater Sys ML20052C0921982-04-27027 April 1982 Tech Spec Change Request 76 Consisting of Tech Spec Pages 15.3.4-1,-2 & -2.a Re Auxiliary Feedwater Pump ML20052C0861982-04-27027 April 1982 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 76.Amend Would Incorporate NRC Changes to Limit Unavailability of Auxiliary Feedwater Pumps ML20054K8491982-06-30030 June 1982 Proposed Tech Spec Changes Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic ML20054K8471982-06-30030 June 1982 Forwards Revision to Tech Spec Table 15.4.1-1 Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic.Nrc Review of Tech Spec Change Request 76 Should Include Addl Change ML20062G6931982-07-27027 July 1982 Notice of Issuance & Availability of Amends 62 & 67 to Licenses DPR-24 & DPR-27,respectively ML20062G6841982-07-27027 July 1982 Amends 62 & 67 to Licenses DPR-24 & DPR-27,respectively, Changing Tech Specs to Modify Limiting Conditions for Operation Re Auxiliary Feedwater Pump Operation ML20064L8991983-02-11011 February 1983 Advises That Installation of Addl Supports for Auxiliary Feedwater Sys Piping & Components Rescheduled to June 1983, Due to Conflicts W/Other Plant Mods ML20082A6251983-11-11011 November 1983 Advises That Auxiliary Feedwater Sys Operability Mods Completed Per Tech Spec Revs Proposed in 820427,0505 & 0630 Ltrs 1979-09-21 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:48373&oldid=5509206"