Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20067D70714 December 1982FirstEnergy
Crouse R
Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131Draft Other
ML20079Q1806 May 1983FirstEnergy
Crouse R
Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612)Other
ML20077L7899 August 1983FRANKLIN INSTITUTE
Ahmed N
Bomberger C
Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation ReptDraft Other
ML20083D63816 December 1983FirstEnergy
Crouse R
Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG EisenhutOther
ML20097E09611 September 1984FirstEnergy
Crouse R
Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I ItemsOther
ML20106A65424 September 1984FRANKLIN INSTITUTE
Bomberger C
Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation ReptOther