Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20067D707 | 14 December 1982 | FirstEnergy Crouse R | Responds to Concerning Response to Draft Technical Evaluation Rept Re Control of Heavy Loads.Util Reviewing Request to Submit Phase II Rept.Response Will Be Provided 830131 | Draft Other |
ML20079Q180 | 6 May 1983 | FirstEnergy Crouse R | Forwards Response to Open Item on Safe Load Paths Contained in NRC 820923 Technical Evaluation Rept of Util 820201 Submittal Re Control of Heavy Loads (NUREG-0612) | Other |
ML20077L789 | 9 August 1983 | FRANKLIN INSTITUTE Ahmed N Bomberger C | Control of Heavy Loads (C-10),Toledo Edison Co,Davis-Besse Nuclear Power Station Unit 1, Draft Technical Evaluation Rept | Draft Other |
ML20083D638 | 16 December 1983 | FirstEnergy Crouse R | Forwards Response to Section 5.1.1(4) of NUREG-0612, Control of Heavy Loads of Nuclear Power Plants, Consisting of Test Results of Missile Shield Lifting Harness Per DG Eisenhut | Other |
ML20097E096 | 11 September 1984 | FirstEnergy Crouse R | Forwards Insp Table Missile Shield Lifting Harness & Generic Load Path for Heavy Loads Not Covered by Specific Procedures.Info Resolves NUREG-0612,Phase I Items | Other |
ML20106A654 | 24 September 1984 | FRANKLIN INSTITUTE Bomberger C | Control of Heavy Loads (C-10),Davis-Besse Nuclear Power Station Unit 1, Technical Evaluation Rept | Other |