- PNO-I-97-024, on 970422,Oyster Creek Nuclear Generating Station Commenced Controlled Shutdown of Unit Due to Equipment Problems.Unit Expected to Be Shut Down for Six Days for Correction of Diaphram Problem (← links)
- PNO-I-97-022, on 970410,GPU,Inc Announced,Addition to Continued Operation of Oyster Creek & Also Exploring Options of Sale.Util Will Begin Next Wk to Develop Plans to Support Sale of Plant,Decommissioning & Personnel Retention (← links)
- PNO-I-85-087, on 851120,reactor Scram Occurred Due to Main Generator Trip Causing Main Turbine Trip.After Scram,Main Steam Lines Isolated.Plant Brought to Cold Shutdown.Operator Manually Initiated Isolation Condenser (← links)
- PNO-I-86-004, on 860117,nine Plant Workers Contaminated w/short-lived Rb-88 & Cs-138.Caused by Buildup of Gases in Offgas Bldg After Offgas Sys Shut Down for Maint.Slight Radioactivity Detected at Bldg Vent (← links)
- ML20137E949 (← links)
- ML20137E941 (← links)
- IR 05000701/2008018 (← links)
- ML20135E467 (← links)
- ML20135E462 (← links)
- ML20141J522 (← links)
- ML20141G943 (← links)
- ML20141G940 (← links)
- ML20141E187 (← links)
- ML20141E158 (← links)
- ML20141D038 (← links)
- ML20138Q339 (← links)
- ML20138Q330 (← links)
- ML20138P760 (← links)
- ML20138M083 (← links)
- ML20138M072 (← links)
- ML20138C399 (← links)
- PNO-I-96-078, on 961025,licensee Manually Scrammed Reactor Due to Turbine Runback,Resulted from Problem in Stator Cooling Sys.Resident Will Continue to Follow Event (← links)
- ML20133D678 (← links)
- ML20128P614 (← links)
- PNO-I-85-052, on 850722,reactor Shutdown Initiated as Result of Degradation of Emergency Svc Water Sys.Caused by HX Differential Pressure Problems.Use of Television Camera to Examine Inner Pipe Wall Planned (← links)
- PNO-I-93-006, on 930125,licensee Notified NRC That Reactor Vessel Core Temp Exceeded 212 Degrees F During Shutdown Cooling Operations.No Core Damage or Radioactive Release Occurred.Inspectors Reviewing Event.State of Nj Notified (← links)
- ML20126F270 (← links)
- PNO-I-85-042, on 850612,during Recovery Process Following Reactor Trip,Reactor Bldg Deluge Fire Protection Sys Initiated.Caused by Smoke from Hot Blistering Paint on Scram Discharge Vol Piping.Reactor Currently in Cold Shutdown (← links)
- PNO-I-80-051, on 800328,licensee Reported That Core Spray Sys Sparger Insp Found 28 New Cracks.Proposed Repairs Include Installation of Clamps (← links)
- PNO-I-80-034, on 800302,two Individuals Showed Significant Whole Body Counts of Co-60.Licensee Review Indicated Exposure Occurred While Wiping Down Control Rod Blade Tool W/No Respiratory Protection (← links)
- PNO-I-80-026, on 800125,27 & 0213,pinhole Leaks Found in Transfer Pipe from Condensate Storage Tank During Insp of Pipe.Contaminated Soil Was Removed & Pipe Replaced.Media Interest Expected (← links)
- PNO-I-88-099, on 880929,steam Lines for Both a & B Isolation Condensers Partially Filled W/Water Placing Steam Lines in Potential Inoperable Condition.Plant Shutdown.Licensee Disabled Automatic Initiation Sys (← links)
- ML20154H090 (← links)
- ML20154D400 (← links)
- ML20154B169 (← links)
- ML20153D818 (← links)
- ML20153D804 (← links)
- ML20153D775 (← links)
- ML20153B478 (← links)
- ML20153B470 (← links)
- ML20151Y308 (← links)
- ML20151Y286 (← links)
- ML20151U556 (← links)
- ML20151Q057 (← links)
- PNO-I-88-072, on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days (← links)
- ML20150B614 (← links)
- ML20149J314 (← links)
- ML20149D984 (← links)
- ML20149D749 (← links)
- ML20149D705 (← links)