Pages that link to "Flippin N"
Jump to navigation
Jump to search
The following pages link to Flippin N:
Displayed 50 items.
- RA-22-0017, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- RA-22-0039, Delay of Planned End Date for Fifth 10-Year Inservice Testing (IST) Program Interval (← links)
- IR 05000261/2021004 (← links)
- IR 05000261/2021006 (← links)
- ML22098A226 (← links)
- IR 05000261/2022001 (← links)
- RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) (← links)
- RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- ML22125A194 (← links)
- ML22146A365 (← links)
- RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 (← links)
- IR 05000261/2022011 (← links)
- ML22167A170 (← links)
- IR 05000261/2022002 (← links)
- RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- ML22193A212 (← links)
- ML22159A295 (← links)
- IR 05000261/2022005 (← links)
- ML22213A068 (← links)
- RA-22-0280, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (← links)
- RA-22-0153, License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 and Update the List of Analytical Methods Used in the Determination of Core. (← links)
- RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (← links)
- IR 05000261/2022003 (← links)
- RA-22-0302, Technical Specifications (TS) Section 5.6.6, Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) (← links)
- ML22339A136 (← links)
- ML22322A132 (← links)
- ML22294A092 (← links)
- IR 05000413/2022004 (← links)
- IR 05000261/2022010 (← links)
- IR 05000413/2022006 (← links)
- RA-23-0091, Submittal of Emergency Action Level (EAL) Technical Basis Document, Revision 4 (← links)
- RA-23-0084, Core Operating Limits Report (COLR) for Unit 1 Cycle 27 Reload Core, Rev. 4 (← links)
- RA-23-0083, Core Operating Limits Report (COLR) for Unit 2 Cycle 26 Reload Core, Rev. 2 (← links)
- IR 05000413/2023011 (← links)
- RA-23-0042, Submittal of Updated Final Safety Analysis Report (Revision 23), Technical Specification Bases Revisions, Ufsar/Selected Licensee Commitment Changes, 10 CFR 50.59 Evaluation Summary Report, and Notification of a Commitment Change (← links)
- ML23107A254 (← links)
- ML23124A218 (← links)
- RA-23-0105, Duke Energy Carolinas, LLC (Duke Energy) - Core Operating Limits Report (COLR) for Unit 1 Cycle 28 Reload Core (← links)
- IR 05000413/2023001 (← links)
- ML23114A245 (← links)
- RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications (← links)
- IR 05000413/2023002 (← links)
- RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks (← links)
- IR 05000413/2023005 (← links)
- IR 05000413/2023010 (← links)
- ML23226A086 (← links)
- IR 05000413/2023004 (← links)
- ML24005A251 (← links)
- RA-24-0209, Regulatory Conference, Additional Supporting Information (← links)
- IR 05000413/2024002 (← links)