Pages that link to "05000354/LER-1988-001"
Jump to navigation
Jump to search
The following pages link to 05000354/LER-1988-001:
Displayed 50 items.
- 05000354/LER-2016-005 (← links)
- 05000354/LER-2016-004 (← links)
- 05000354/LER-2016-003 (← links)
- 05000354/LER-2015-005 (← links)
- 05000354/LER-2016-006 (← links)
- 05000354/LER-2017-001 (← links)
- 05000354/LER-1990-009 (← links)
- 05000354/LER-1990-008 (← links)
- 05000354/LER-1995-017, Forwards LER 95-017 Re Inadequate Testing of Emergency Bus Undervoltage Logic Circuitry,Missed Surveillance Test & DGs Being Declared Inoperable (← links)
- 05000354/LER-1995-016, Forwards LER 95-016 Re Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable (← links)
- 05000354/LER-1995-038, Forwards LER-95-038-02 Re Failure to Comply W/Required Action Statement Upon Removal of Failed Snubber on RHR Shutdown Cooling Line.Suppl Updates Corrective Actions (← links)
- 05000354/LER-1995-003, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 (← links)
- 05000354/LER-1996-014, Forwards LER 96-014-00 Re non-conservative Safety Limit Min Critical Power Ratio Calculation Methodology Error Discovery.Commitments Listed as Submitted (← links)
- 05000354/LER-1996-015, Forwards LER 96-015-00 Re Potential to Operate in Unanalyzed Condition Due to Design Deficiency in Overboard Discharge Line.Commitments Listed as Submitted (← links)
- 05000354/LER-1997-004, Forwards LER 97-004-00, B Div Primary Containment Isolation Due to Personnel Error During Troubleshooting, Per 10CFR50.73(a)(2)(iv).Util Commitments Listed (← links)
- 05000354/LER-1996-025, Forwards LER 96-025-00.Commitments Listed Including Work Order Initiated to Install Recording Instrumentation to Determine Actual Line Dynamics During Next RCIC warm-up (← links)
- 05000354/LER-1995-033, Forwards LER 95-033-12 Which Documents Discovery of TS Surveillance Implementation Deficiency Identified by TS Surveillance Improvement Program (← links)
- 05000354/LER-1997-008, Forwards LER 97-008-00 Entitled, ESF Actuation: C Svc Water Pump Auto-Start. Commitments,Encl (← links)
- 05000354/LER-1997-007, Provides List of Commitments Re LER 97-007 Concerning Struthers-Dunn 219NE Series Relay Failures Due to Thermal Degradation of Magnetic Vinyl Plastic Bearing Pad Matl Per 10CFR50.73(a)(2)(v) & 10CFR21.LER 97-007-00,encl (← links)
- 05000354/LER-1997-005, Forwards LER 97-005-00 Entitled, Operation in TS Prohibited Condition Due to Failure to Perform Monthly Flowpath Verification Surveillance Checks of Rhrs Crosstie Valves. Commitments Attached (← links)
- 05000354/LER-1997-002, Forwards List of Commitments Made for LER 97-002-00 Re Inconsistency Between Filtration,Recirculation & Ventilation Sys TSs & Ability to Withstand Single Failures (← links)
- 05000354/LER-1996-022, Forwards LER 96-022-02,documenting Event That Occurred at Hope Creek Generating Station,Unit 1.Util Commitments Made within Ltr,Listed (← links)
- 05000354/LER-1996-030, Submits List of Commitments Re Unplanned HPCI Sys Inoperability Due to Stuck Open Extended Containment Boundary Valve in LER 96-030-00 (← links)
- 05000354/LER-1996-028, Forwards LER 96-028-00,submitted Pursuant to Requirements of 10CFR50.73(a)(2)(v).Commitments Listed (← links)
- 05000354/LER-1998-006, Forwards LER 98-006-00,entitled Inadequate Performance of Primary Containment Integrity Verification, IAW 10CFR50.73(a)(2)(i)(B).Commitments Made by Util,Encl (← links)
- 05000354/LER-1997-015, Forwards LER 97-015-00 Re Failure of Radioactive Effluent Samples to Analyze within Required Surveillance Interval. Commitments Made by Util,Encl (← links)
- 05000354/LER-1999-006, Forwards LER 99-006-00 Re Esfa B Channel Primary Containment Isolation Signal Actuation.Attachment a Lists Commitments Util Making to NRC Re LER (← links)
- 05000354/LER-1997-026, Forwards LER 97-026-00,re Inoperable E Filtration, Recirculation,Ventilation Sys Recirculation Unit Due to Tripped High High Temperature Switch.Commitment,Listed (← links)
- 05000354/LER-1997-024, Forwards LER 97-024-00 Re as Found Values for Safety Relief Valve Lift Setpoints Exceed Tech Spec Allowable Limits. Attachment a Represent Commitments Util Made to NRC Relative to LER (← links)
- 05000354/LER-1997-032, Forwards LER 97-032-00 Re Inoperability of HPCI & Rcic. Commitments Made by Util,Encl (← links)
- 05000354/LER-1997-031, Forwards LER 97-031-00 Re Reactor Core Isolation Cooling Sys Isolation.Commitments Made by Util Also Encl (← links)
- 05000354/LER-1999-004, Forwards LER 99-004-00 Re Check Valves for Containment Atmosphere Control Sys Vacuum Breaker Isolation Valve Accumulator Did Not Meet Leakage Requirements During Testing.Commitments,Encl (← links)
- 05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made (← links)
- 05000354/LER-1997-023, Forwards LER 97-023-01 Re Core Spray Nozzle Weld through- Wall Leak.Commitments Made by Util,Encl (← links)
- 05000354/LER-1988-022, Special Rept 88-006-00:on 880826,HPCI Injection Occurred. Caused by Low Reactor Vessel Level Signal Following Reactor Scram Described in LER 88-022-00.HPCI Injection Nozzle Usage Factor Not Calculated (← links)
- 05000354/LER-1998-008, Forwards LER 98-008-01 Re ESF Actuation/Automatic Reactor Scram Due to Turbine Trip.Caused by High Moisture Separator Level.Commitments Listed in Attachment a (← links)
- 05000354/LER-1986-074, Resubmits LER 86-074-00.LER Found Out of Original Envelope & Loose in Mail (← links)
- 05000354/LER-1999-009, Forwards LER 99-009-00, License Condition Violation - Min FW Temp Limits. Commitments Made by Util Encl (← links)
- 05000354/LER-1997-025, Forwards LER 97-025-00 Re Design Deficiency Potential for Unmonitored Release Path Through Station Svc Water Sys. Commitment Util Made to NRC Relative to Ler,Encl (← links)
- 05000354/LER-1998-004, Forwards LER 98-004-00 Re EDG Inoperability in Excess of Allowed Outage Time,Due to High Particulate Concentration in Diesel Fuel Oil Storage Tanks (← links)
- 05000354/LER-1989-009, Forwards Corrected Page 1 of LER 89-009-00.Event & Rept Dates Incorrectly Coded (← links)
- 05000354/LER-1998-003, Forwards LER 98-003-00 Re Concurrent Inoperability of a & B Cr.Commitments Made by Pse&G,Encl (← links)
- 05000354/LER-1997-018, Forwards LER 97-018-00,discussing Esfa Which Resulted from RPS MG Set Breaker Trip.List of Commitments,Encl (← links)
- 05000354/LER-1997-022, Forwards LER 97-022-00 Re Unplanned Manual Scram Following Relay Malfunction in a Phase Main Generator step-up Transformer.Commitments Made by Util,Encl (← links)
- 05000354/LER-1997-013, Forwards LER 97-013-01 Re Unplanned High Pressure Coolant Injection Sys Inoperability.Attachment a Listed Item Representing Commitment (← links)
- 05000354/LER-1997-020, Forwards LER 97-020-00 Re Past Inoperability of Safety Related Chiller Due to Operation W/Low Safety Auxiliary Cooling Sys Temp.Commitments Made by Util,Attached (← links)
- 05000354/LER-1998-002, Forwards LER 98-002-00, TS Prohibited Condition - Indequate Filtration,Recirculation & Ventilation Sys Surveillance Test, Per 10CFR50.73(a)(2)(i)(B).Commitment Made by Util,Encl (← links)
- 05000354/LER-1998-001, Forwards LER 98-001-00,re Missed HPCI Surveillance Resulting in Unavailability of HPCI (← links)
- 05000354/LER-1997-017, Forwards LER 97-017-00 Re Missed Emergency Lighting Surveillance,Per License Conditions 2.C(7) & 2.F (← links)
- 05000354/LER-1997-034, Forwards LER 97-034-01, Condition Prohibited by Ts:Missed EDG Surveillance. Util Commitments to NRC Re Subj LER Encl (← links)