Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070T406 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Univ of Florida Test Reactor Conversion from High Enriched U to Low Enriched U)
- ML20205E473 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel)
- ML20101L349 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel)
- ML20217M658 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from Heu to LEU Fuel)
- ML20091C045 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Univ of Florida Training Reactor Conversion from HEU to LEU Fuel)
- ML20033G615 + (Updated Proposal Submitted to NRC to Meet 10CFR50.64 Requirements for Updating Scheduling of Univ of Florida Training Conversion High to Low Enriched U Fuel)
- ML20035B842 + (Updated Proposal Submitted to Nuclear Regulatory Commission to Meet 10CFR50.64 Requirements for Updating Scheduling of Uftr Conversion from HEU to LEU Fuel)
- ML18223A005 + (Updated Proposed License Condition Regarding License Amendment Request to Adopt 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components)
- ML20245H033 + (Updated Proposed Tech Spec Page 5-5 Re Spent Fuel Storage Capacity)
- ML20052G192 + (Updated Proposed Tech Spec Pages,Incorporating All Recent License Amends & NRC Requests Re Single Loop Operation)
- ML18058B830 + (Updated Proposed Tech Specs Pages Re Shutdown Cooling)
- ML20210A705 + (Updated Proposed Tech Specs Re Steam Generator Plugging Limit to Include Plugging of Tubes W/Defects Greater than Distance of 1.25 Inches Below Top of Tubesheet)
- ML20009C836 + (Updated QA Manual for Transport of Radioactive Matls)
- ML17331A312 + (Updated QA Program Description for Cook Nuclear Plant)
- ML17332A893 + (Updated QA Program Description for Cook Nuclear Plant)
- ML17334B400 + (Updated QA Program Description for Cook Nuclear Plant)
- ML17328A662 + (Updated QA Program Description for Cook Nuclear Plant)
- ML17329A470 + (Updated QA Program Description for Cook Nuclear Plant)
- ML17328A072 + (Updated QA Program Description for Cook Nuclear Plant Jul 1989)
- ML17334B511 + (Updated QA Program Description for DC Cook Nuclear Plant)
- ML20217J470 + (Updated QA Program Description for DC Cook Nuclear Power Plant)
- ML17325A217 + (Updated QA Program Description for Facility)
- ML17321A732 + (Updated QA Program for DC Cook Nuclear Plant,Units 1 & 2)
- ML19211A435 + (Updated QA Program for Industrial Radiography)
- ML20045G445 + (Updated QA Program of El Paso Natural Gas Co for Compliance w/10CFR71)
- ML18152B010 + (Updated QA Program,Operations Phase)
- ULNRC-06118, Updated RAI Response to the License Renewal Application, Enclosures 1 and 2 + (Updated RAI Response to the License Renewal Application, Enclosures 1 and 2)
- ML14127A150 + (Updated RAI Response to the License Renewal Application Amendment 35)
- ML20084G485 + (Updated RO 269/83-17:seals at Conduit Connections Defective. Scotchcast 9 Epoxy Resin Will Be Utilized to Seal Conduit Connections,Dow Corning RTV 3145 Applied to Conduit Fittings & Conduit/Cable Seals Will Be Upgraded)
- ML20080M026 + (Updated RO 287/83-07.Investigation Incomplete.Next Rept Expected by 831030)
- ML20054L885 + (Updated RO 369/81-162:one of Two Westinghouse SA-1 Relays Modified & Installed.Installation of Other Modified Relays Delayed Until 820901,due to Delays in Obtaining Component)
- ML20066B766 + (Updated RO 369/82-66:on 820903 & 16,flow Totalizer Declared Inoperable.Caused by Leaking Pump Discharge Check Valve & out-of-calibr Flow Transmitter.Check Valve Repaired & Transmitter Calibr)
- ML20087G021 + (Updated RO 370/83-57:shutdown Capability Never Jeopardized & Unit Could Be Shut Down Given Fire in Annulus W/Sprinker Isolation Valve Closed.Cause Unknown.Figure Illustrating Cable Separation Encl)
- ML20084S542 + (Updated RO 50-254/76-26:on 760803,rod Worth Minimizer Not Operable for Withdrawal of First Twelve Control Rods to Fully Withdrawn Position While in Startup Mode.Caused by Burned Out Wire Runs on Relay Board.Software Modified)
- ML20084S379 + (Updated RO 50-254/76-33:on 761029,repairs to RCIC Pump Consisted of Rebuilding Pump Casing & Installing New Rotary Element.Pump Reassembled & Repairs Completed by 761111.Welds on Piping Acceptable)
- ML20065B752 + (Updated RO 50-321/1979-021 Rev 5:tritium Levels Discovered in Groundwater Samples.Cause Attributed to Slight Shift of Main Body of Tritiated Groundwater.Gamma Scans of 3,000 Will Be Taken Each Time Samples Collected)
- ML20085F893 + (Updated RO 75-005:on 750713,control Rod 27 Failed to Insert. Caused by Loose Rotating Element in Brake Assembly,Resulting in Improper Air Gap Between Disks.All Brake Assemblies to Be Inspected)
- ML20038A093 + (Updated RO 76-05 on 760327 Insp of Steam Drum Relief Valves Revealed Surface Cracking on Nozzles.Cause Attributed to Stress Corrosion in High Oxygen Steam Environ.Valves Repaired & Returned to Svc)
- ML20031C207 + (Updated RO 77-46:on 771111,during Daily Exercising of Withdrawn Control rods,3-4 Drive Could Not Be Withdrawn from Position 05 to 06.Cause Not Stated.Drive Inserted & Valved Out)
- AECM-83-0279, Updated RO 83-001/1:on 830202,smoke Detectors in LPCS Pump Room Covered to Perform Planned Activity.Hourly Fire Watch Established.Work Still in Progress.Restoration Date for Smoke Detectors Estimated for 830615 + (Updated RO 83-001/1:on 830202,smoke Detectors in LPCS Pump Room Covered to Perform Planned Activity.Hourly Fire Watch Established.Work Still in Progress.Restoration Date for Smoke Detectors Estimated for 830615)
- AECM-83-0281, Updated RO 83-006/1:on 830210,fire Penetrations AE-382C & AE-384C Opened to Permit Planned Maint Work.Initially Reported on 830318.Maint Work Order Not Completed. Restoration Date Estimated for 830614 + (Updated RO 83-006/1:on 830210,fire Penetrations AE-382C & AE-384C Opened to Permit Planned Maint Work.Initially Reported on 830318.Maint Work Order Not Completed. Restoration Date Estimated for 830614)
- AECM-83-0535, Updated RO 83-006/2:on 830210,fire Penetrations AE-382C & AE-384C Opened to Allow Performance of Planned Maint.Work Completed & Limiting Condition for Operation Lifted 830827 + (Updated RO 83-006/2:on 830210,fire Penetrations AE-382C & AE-384C Opened to Allow Performance of Planned Maint.Work Completed & Limiting Condition for Operation Lifted 830827)
- AECM-83-0335, Updated RO 83-010/1:on 830209,smoke Detectors Covered to Prevent Continuous Alarms During Grinding & Welding.Hourly Fire Watch Conducted.Zones Expected to Be Restored by 830630.Addl Fire Zone Listed + (Updated RO 83-010/1:on 830209,smoke Detectors Covered to Prevent Continuous Alarms During Grinding & Welding.Hourly Fire Watch Conducted.Zones Expected to Be Restored by 830630.Addl Fire Zone Listed)
- AECM-83-0541, Updated RO 83-011/1:during 830218-0303,several fire-rated Penetrations Failed to Conform to Design Specs.Caused by Degradation Since Installation.Barriers Will Be Restored by 831015 + (Updated RO 83-011/1:during 830218-0303,several fire-rated Penetrations Failed to Conform to Design Specs.Caused by Degradation Since Installation.Barriers Will Be Restored by 831015)
- AECM-83-0542, Updated RO 83-012/1:on 830222-0316,numerous fire-rated Seals Opened to Perform Planned Maint Activities.Hourly Fire Watch Being Conducted.Estimated Completion Date Is 831015 + (Updated RO 83-012/1:on 830222-0316,numerous fire-rated Seals Opened to Perform Planned Maint Activities.Hourly Fire Watch Being Conducted.Estimated Completion Date Is 831015)
- AECM-83-0390, Updated RO 83-014/1:on 830301,fire-rated Penetration TE-14B (Elevation 113 Ft,Turbine Bldg) Opened to Install Raceway, Per Design Change Package.Hourly Fire Watch Established. Penetration Not Sealed within 7-day Time Limit + (Updated RO 83-014/1:on 830301,fire-rated Penetration TE-14B (Elevation 113 Ft,Turbine Bldg) Opened to Install Raceway, Per Design Change Package.Hourly Fire Watch Established. Penetration Not Sealed within 7-day Time Limit)
- AECM-83-0295, Updated RO 83-015/1:on 830311,during Special Insp of fire-rated Assemblies,Three Open Penetrations Identified. Correct Matl Nonconformance Rept Numbers Should Be 00162-83, 00163-83 & 00165-83.Restoration Set for 830530 + (Updated RO 83-015/1:on 830311,during Special Insp of fire-rated Assemblies,Three Open Penetrations Identified. Correct Matl Nonconformance Rept Numbers Should Be 00162-83, 00163-83 & 00165-83.Restoration Set for 830530)
- AECM-83-0336, Updated RO 83-015/2:three Open Penetrations Identified. Caused by Incomplete Design Drawings or Const Oversight.Matl Nonconformance Repts Initiated to Correct Deficiencies. Estimated Restoration Date Is 830725 + (Updated RO 83-015/2:three Open Penetrations Identified. Caused by Incomplete Design Drawings or Const Oversight.Matl Nonconformance Repts Initiated to Correct Deficiencies. Estimated Restoration Date Is 830725)
- AECM-83-0543, Updated RO 83-015/3 Re Open fire-rated Penetrations.Caused by Incomplete Design Drawings or Const Oversight.Action Statement a of Tech Spec 3.7.7 Will Continue Until All Three Penetrations Closed + (Updated RO 83-015/3 Re Open fire-rated Penetrations.Caused by Incomplete Design Drawings or Const Oversight.Action Statement a of Tech Spec 3.7.7 Will Continue Until All Three Penetrations Closed)
- AECM-83-0524, Updated RO 83-022/1:on 830317,fire Break Detected in Cable Tray Removed for Implementation of Design Change Work Package.Fire Break Restored & Limiting Condition for Operation Lifted on 830823 + (Updated RO 83-022/1:on 830317,fire Break Detected in Cable Tray Removed for Implementation of Design Change Work Package.Fire Break Restored & Limiting Condition for Operation Lifted on 830823)
- AECM-83-0379, Updated RO 83-023/1:on 830312,two Smoke Detectors in Standby Gas Treatment Filter Train Room (Zone 2-19) Covered While Conducting Welding Activities.Fire Watches Established. Detectors Should Be Operable by 830901 + (Updated RO 83-023/1:on 830312,two Smoke Detectors in Standby Gas Treatment Filter Train Room (Zone 2-19) Covered While Conducting Welding Activities.Fire Watches Established. Detectors Should Be Operable by 830901)