ML20054L885
| ML20054L885 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 07/01/1982 |
| From: | Parker W DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| RO-369-81-162, NUDOCS 8207090034 | |
| Download: ML20054L885 (1) | |
Text
_
6 s/Gp si, o DUKE POWER COMPANY Of f
- g
~k4 Powsu Dust.nixo f,
422 Sourit Cucacu Sinaar, CsuntorTz, N. C. aaa4a 8
' ' 5,'<*
A g
/
m u m o. c. m a s a.
Tcts,,,o,cY,c. 70.
vier ears.oc,
s,c.
e.ooucv.o July 1, 1982 3,3..o.3 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: McGuire Nuclear Station Unit 1 Docket No. 50-369
Dear Mr. O'Reilly:
In the " Corrective Action" section of Reportable Occurrence Report R0-369/81-162 it was stated that modification kits for the Westinghouse SA-1 relays had been ordered and were expected to be installed by July 1, 1982. At this time, one of the two Unit 1 relays has been modified and installed. However, delays have been encountered in obtaining another modified relay. Consequently, Duke Power Company now intends to install the other modified relay by September 1, 1982.
Very truly yours,
& C.
William O. Parker, Jr.
PBN/php cc: Document Control Desk Mr. P. R. Bemis U. S. Nuc1 car Regulatory Commission Senior Resident Inspector Washington, D. C. 20555 McGuire-Nuclear Station Records Center Institute of Nuclear Power Operations 1820 Water Place Atlanta, Georgia 30339
, /g 1C h
[bb 8207090034 820701 PDRADOCK05000g S