Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML072850718 + (Updated Correspondence Service List)
- ML25188A042 + (Updated Criticality Analysis LAR - Final RAIs)
- GO2-14-055, Updated Dam Screening Analysis in Support of Energy Northwests Request for the Us Army Corps of Engineers (Usace) Dam Failure Analysis Support + (Updated Dam Screening Analysis in Support of Energy Northwests Request for the Us Army Corps of Engineers (Usace) Dam Failure Analysis Support)
- ML25071A090 + (Updated Data Quality Improvement Program Guidance OEDO-25-00097-ADM)
- ML091870358 + (Updated Decommissioning Closure Plan and Cost Estimate -GE Vallecitos Facility)
- ML093431318 + (Updated Decommissioning Shortfalls as of December 1, 2009)
- GO2-81-244, Updated Deficiency Rept Re Concrete & Grouting Work on Contract 215,initally Reported on 801114.Contractor Is Still Searching Records for Data on Grout in Question.Next Rept by 811023 + (Updated Deficiency Rept Re Concrete & Grouting Work on Contract 215,initally Reported on 801114.Contractor Is Still Searching Records for Data on Grout in Question.Next Rept by 811023)
- GO2-81-026, Updated Deficiency Rept Re Failure of Special Doors & Hatches to Perform Intended Function,Initially Reported 801114.Deficiencies Being Investigated.Next Rept Will Be Submitted by 811115 + (Updated Deficiency Rept Re Failure of Special Doors & Hatches to Perform Intended Function,Initially Reported 801114.Deficiencies Being Investigated.Next Rept Will Be Submitted by 811115)
- GO2-79-012, Updated Deficiency Rept Re Improper Installation of Concrete Anchors,Initially Reported on 790702.Specs & Procedures Revised to Provide Specific Installation & Insp Requirements + (Updated Deficiency Rept Re Improper Installation of Concrete Anchors,Initially Reported on 790702.Specs & Procedures Revised to Provide Specific Installation & Insp Requirements)
- ML20010F849 + (Updated Deficiency Rept Re Potentially Reportable Condition on Soil Backfill,Compaction & Testing.Records Defining Class I Backfill Areas Backfilled After May 1976 Are Being Located.Final Rept Expected by 811215)
- ML20004D896 + (Updated Deficiency Rept Re Power Block Pipe Whip Restraint Design Discrepancies.Design of Potentially Affected Restraints Has Been Reviewed & Revised,Where Necessary.Final Rept Will Be Provided by 810601)
- ML12244A401 + (Updated Disclosures of Natural Resources Defense Council Filed Purusant to 10 C.F.R. 2.336(a) and Affidavit of Christopher J. Weaver in the Matter of Limerick Generating Station, Units 1 and 2)
- ML24289A087 + (Updated Dispositioning of Safety Culture Program Effectiveness Review Recommendations)
- ML042240254 + (Updated Distribution Lists for Browns Ferry, Sequoyah, Watts Bar, and Bellefonte Nuclear Plants)
- ML20107J565 + (Updated Draft Outline for Licensing Modernization Project Advanced Reactor License Applications)
- ML21147A216 + (Updated Draft Public Radiation Safety SDP)
- ML21147A266 + (Updated Draft Public Radiation Safety SDP (Track Changes))
- ML21147A284 + (Updated Draft Public Radiation Safety SDP Bases)
- ML21147A223 + (Updated Draft Public Radiation Safety SDP Bases (Track Changes))
- ML21147A302 + (Updated Draft Public Radiation Safety SDP and Bases)
- ML112070426 + (Updated Draft Request for Additional Information Emergency Action Level Upgrade)
- ML20021A380 + (Updated E-mail 1/21/2020; Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications)
- ML12292A121 + (Updated ETE Quarterly Report for Q4 2012)
- ML20135E660 + (Updated Effluent & Waste Disposal Semi-Annual Rept Jan- June 1996)
- ML20091Q992 + (Updated Effluent & Waste Disposal Semiannual Rept for Jul- Dec 1994)
- DCL-09-020, Updated Emergency Plan Implementing Procedures + (Updated Emergency Plan Implementing Procedures)
- ML17249A250 + (Updated Entergy Handout for River Bend and NRC Public Conference Call on September 11, 2017, to Discuss Technical Specification Task Force Traveler 542)
- RBG-46335, Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Safeguards Contingency Plans Incorporating RAI Responses + (Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Safeguards Contingency Plans Incorporating RAI Responses)
- W3F1-2004-0088, Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses + (Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses)
- ML20034B547 + (Updated Environ Info,Westinghouse Columbia Fuel Fabrication Facility)
- ML20214P431 + (Updated Environ Rept - OL Stage Through Suppl 2)
- ML20116M032 + (Updated Environ Rept for Facilities,Vols 1 & 2)
- ML18040B020 + (Updated Environ Rept for Facilities,Vols 1-4)
- ML17298A469 + (Updated Environ Rept for Facilities,Vols 1-4)
- ML20080H923 + (Updated Environ Rept for Facility)
- ML17214A153 + (Updated Environ Rept for Facility,Vols 1-3)
- ML050550221 + (Updated Errata Pages for WCAP-16212-NP)
- ML14276A088 + (Updated Evacuation Time Estimates)
- LIC-02-0004, Updated Evaluation of Minimum Reactor Coolant System (RCS) Flow Rate License Amendment Request + (Updated Evaluation of Minimum Reactor Coolant System (RCS) Flow Rate License Amendment Request)
- HL-6276, Updated FHA Revision 20 + (Updated FHA Revision 20)
- ML20006A782 + (Updated FSAR Change Requests,Updated FSAR Vol XI)
- ML19327B326 + (Updated FSAR Change Requests,Updated FSAR Vol XI)
- ML20149K759 + (Updated FSAR for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor)
- BSEP 10-0100, Updated FSAR, Revision 22 + (Updated FSAR, Revision 22)
- RA-24-0180, Updated FSAR, Revision 29 + (Updated FSAR, Revision 29)
- ML12068A134 + (Updated Fermi 1 Groundwater Monitoring Data)
- NRC-12-0012, Updated Fermi 1 Groundwater Monitoring Data + (Updated Fermi 1 Groundwater Monitoring Data)
- ML20117N402 + (Updated Final Deficiency Rept (Rdc 115(84)) Re Rosemount Model 1153 Series B Pressure Transmitters.Transmitters Repaired by Vendor.Reinstallation of Unit 1 Transmitters Will Be Completed)
- ML20132G136 + (Updated Final Deficiency Rept 84-10 Re Backpressure on Valves Furnished by Clow Corp.Replacement of Listed Valves Delayed.Completion of Corrective Actions Extended to 850802)
- ML20083F918 + (Updated Final Deficiency Rept Rdc 19(80) Re Stainless Steel Cladding Inside Containment.Full Suppression Pool Monitoring Sys Will Be Functional by 841101 for Unit 1)
- ML20080A969 + (Updated Final Deficiency Rept Re Bracket Welds for Main Steam & Recirculation Sys Pipe Whip Restraints.Review of Installation Documentation Will Not Be Complete Until 840316)