Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML022390638 + (Tva/Nrc Meeting Browns Ferry Nuclear Plant License Renewal Application)
- ML021010084 + (Tvan Calculation Coversheet/Ccris Update)
- ML18018A030 + (Tvel LTA Status Report 120717 (Final - Non-proprietary))
- ML17335A044 + (Tvel Lead Test Assembly 3rd Closed Meeting)
- RBG-46184, Twelfth Fuel Cycle Core Operating Limits Report (COLR) + (Twelfth Fuel Cycle Core Operating Limits Report (COLR))
- L-09-197, Twelfth Inservice Inspection Summary Report + (Twelfth Inservice Inspection Summary Report)
- ML20091M385 + (Twelfth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 801105. Initial Rod Position & Axial Offset Limits Revised.Final Rept to Be Provided Pending Determination of Cause)
- ML20209F201 + (Twelfth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping.Initially Reported on 801230.Physical Drawings, Insulation & Mode Analysis Drawings for ERCW Piping Mods Issued.Next Rept Will Be Submitted by 860324)
- ML20081B475 + (Twelfth Interim Deficiency Rept Re Main Steam Line Failure Due to Main Feedwater Overfill.Initially Reported on 800319. Field Change Package Submitted by B&W.Next Rept by 840622. Also Reportable Per Part 21)
- ML20133P109 + (Twelfth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124. Results from Transmitters Sent to Wyle Labs for Retesting Expected by 850801.Next Rept Will Be Submitted by 851015)
- ML20097C612 + (Twelfth Interim Rept of Significant Const Deficiency 78 Re American Bridge Structural Steel.Initially Reported on 840810.Final Rept to Be Provided on 840921)
- W3P84-2656, Twelfth Interim Rept of Significant Const Deficiency 60 Re Turnover Documentation & Inadequate Hanger Weld Problems. Const Appraisal Team Insp Rept 50-382/84-30 Indicated Item Closed.Final Rept Expected by 841022 + (Twelfth Interim Rept of Significant Const Deficiency 60 Re Turnover Documentation & Inadequate Hanger Weld Problems. Const Appraisal Team Insp Rept 50-382/84-30 Indicated Item Closed.Final Rept Expected by 841022)
- ML20086J998 + (Twelfth Interrogatory Re Contention VI-1 (Qa/Qc).Documents, Logs & Repts on All safety-related Welds Requested)
- NL-07-1888, Twelfth Maintenance/Refueling Outage Steam Generator Tube Inspection Report + (Twelfth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
- ML20070W231 + (Twelfth Motion for Summary Disposition of Contention Necnp I.D.1 Re Compliance W/Gdc 1.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
- ML20136A618 + (Twelfth Partial Response for FOIA Request for Documents.App U Records Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6))
- ML20136A623 + (Twelfth Partial Response for FOIA Request for Documents.App U Records Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6))
- ML20236U044 + (Twelfth Partial Response to FOIA Request for Documents Re Sser 21 & 22.Forwards App M,N & O Documents.App M,N,O & P Documents in PDR & Lpdr Located in San Luis Obispo,Ca.App Q Documents Totally Withheld (Ref FOIA Exemption 5))
- ML20137A658 + (Twelfth Partial Response to FOIA Request for Documents. Records in App U Withheld in Part (Ref FOIA Exemptions 4 & 6))
- ML20137A663 + (Twelfth Partial Response to FOIA Request for Documents. Records in App U Withheld in Part (Ref FOIA Exemptions 4 & 6))
- ML19332F388 + (Twelfth Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network,Jul-Sept 1989)
- PLA-5503, Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms + (Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms)
- ML022120321 + (Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D, ASME Repairs & Replacements NIS-2 Forms)
- ML022120052 + (Twelfth Refueling & Inspection Outage ISI Summary Report)
- ML022120110 + (Twelfth Refueling & Inspection Outage ISI Summary Report, Table of Contents - Appendix C)
- CP-201101429, Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report + (Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report)
- LR-N05-0194, Twelfth Refueling Outage (RFO 12), Ninety Day Report for Inservice Inspection Activities + (Twelfth Refueling Outage (RFO 12), Ninety Day Report for Inservice Inspection Activities)
- LR-N05-0194, Twelfth Refueling Outage (RFO12), Ninety Day Report for Inservice Inspection Activities + (Twelfth Refueling Outage (RFO#12), Ninety Day Report for Inservice Inspection Activities)
- L-07-023, Twelfth Refueling Outage Inservice Inspection Report + (Twelfth Refueling Outage Inservice Inspection Report)
- ML062060602 + (Twelfth Refueling Outage Steam Generator Inservice Inspection Summary Report, Attachment B.3 - B.7)
- BW060064, Twelfth Refueling Outage Steam Generator Inservice Inspection Summary Report, Cover - Attachment B.2 + (Twelfth Refueling Outage Steam Generator Inservice Inspection Summary Report, Cover - Attachment B.2)
- BW070005, Twelfth Refueling Outage Steam Generator Inservice Inspection Summary Report + (Twelfth Refueling Outage Steam Generator Inservice Inspection Summary Report)
- ML20062G878 + (Twelfth Set of Interrogatories & Request to Produce. Certificate of Svc Encl.Related Correspondence)
- ML20084P075 + (Twelfth Set of Interrogatories on Issue 16 Re Diesel Generator Reliability.Certificate of Svc Encl.Related Correspondence)
- ML12335A181 + (Twelfth Update to Mandatory Disclosures Per 10 C.F.R. 2.336)
- ENS 44030 + (Twelve Lost Tritium Exit Signs)
- ML20239A030 + (Twelve Sys Assessment of Expanded Augmented Sys Review & Test Program Rept)
- ML20235Q756 + (Twelve Sys Expanded Assessment of Expanded Augmented Sys Review & Test Program Rept)
- ML20137H405 + (Twelveth Partial Response to FOIA Request for Documents. App DD Records Being Withheld in Part (Ref Exemptions 5 & 6))
- ML20137H409 + (Twelveth Partial Response to FOIA Request for Documents. App DD Records Being Withheld in Part (Ref Exemptions 5 & 6))
- L-25-158, Twentieth Inservice Inspection Summary Report + (Twentieth Inservice Inspection Summary Report)
- ML20071A208 + (Twentieth Motion for Summary Disposition of Contention Necnp III.2.No Genuine Issue of Matl Fact Exists & Util Entitled to Favorable Decision)
- ML20137R279 + (Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF)
- ML20137Q937 + (Twentieth Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App FF)
- ML20087N338 + (Twentieth Progress Rept of Texas A&M Univ,Nuclear Science Ctr,1983)
- ML20086D824 + (Twentieth Quarterly Update to Unit 2 Startup Test Rept)
- RC-13-0026, Twentieth Refueling Inservice Inspection (ISI) Report + (Twentieth Refueling Inservice Inspection (ISI) Report)
- L-11-002, Twentieth Refueling Outage Inservice Inspection Report + (Twentieth Refueling Outage Inservice Inspection Report)
- ML19031B557 + (Twentieth Refueling Outage Inservice Inspection Summary Report)
- ML20087G733 + (Twentieth Set of Interrogatories & Request to Produce to Applicant.Certificate of Svc Encl.Related Correspondence)
- ML18058A539 + (Twentieth Yr Physical Surveillance of Palisades Nuclear Plant)