  • ML022390638  + (Tva/Nrc Meeting Browns Ferry Nuclear Plant License Renewal Application)
  • ML021010084  + (Tvan Calculation Coversheet/Ccris Update)
  • ML18018A030  + (Tvel LTA Status Report 120717 (Final - Non-proprietary))
  • ML17335A044  + (Tvel Lead Test Assembly 3rd Closed Meeting)
  • RBG-46184, Twelfth Fuel Cycle Core Operating Limits Report (COLR)  + (Twelfth Fuel Cycle Core Operating Limits Report (COLR))
  • L-09-197, Twelfth Inservice Inspection Summary Report  + (Twelfth Inservice Inspection Summary Report)
  • ML20091M385  + (Twelfth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 801105. Initial Rod Position & Axial Offset Limits Revised.Final Rept to Be Provided Pending Determination of Cause)
  • ML20209F201  + (Twelfth Interim Deficiency Rept Re Corrosion of Carbon Steel Piping.Initially Reported on 801230.Physical Drawings, Insulation & Mode Analysis Drawings for ERCW Piping Mods Issued.Next Rept Will Be Submitted by 860324)
  • ML20081B475  + (Twelfth Interim Deficiency Rept Re Main Steam Line Failure Due to Main Feedwater Overfill.Initially Reported on 800319. Field Change Package Submitted by B&W.Next Rept by 840622. Also Reportable Per Part 21)
  • ML20133P109  + (Twelfth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124. Results from Transmitters Sent to Wyle Labs for Retesting Expected by 850801.Next Rept Will Be Submitted by 851015)
  • ML20097C612  + (Twelfth Interim Rept of Significant Const Deficiency 78 Re American Bridge Structural Steel.Initially Reported on 840810.Final Rept to Be Provided on 840921)
  • W3P84-2656, Twelfth Interim Rept of Significant Const Deficiency 60 Re Turnover Documentation & Inadequate Hanger Weld Problems. Const Appraisal Team Insp Rept 50-382/84-30 Indicated Item Closed.Final Rept Expected by 841022  + (Twelfth Interim Rept of Significant Const Deficiency 60 Re Turnover Documentation & Inadequate Hanger Weld Problems. Const Appraisal Team Insp Rept 50-382/84-30 Indicated Item Closed.Final Rept Expected by 841022)
  • ML20086J998  + (Twelfth Interrogatory Re Contention VI-1 (Qa/Qc).Documents, Logs & Repts on All safety-related Welds Requested)
  • NL-07-1888, Twelfth Maintenance/Refueling Outage Steam Generator Tube Inspection Report  + (Twelfth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
  • ML20070W231  + (Twelfth Motion for Summary Disposition of Contention Necnp I.D.1 Re Compliance W/Gdc 1.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
  • ML20136A618  + (Twelfth Partial Response for FOIA Request for Documents.App U Records Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6))
  • ML20136A623  + (Twelfth Partial Response for FOIA Request for Documents.App U Records Being Withheld in Part (Ref FOIA Exemptions 4,5 & 6))
  • ML20236U044  + (Twelfth Partial Response to FOIA Request for Documents Re Sser 21 & 22.Forwards App M,N & O Documents.App M,N,O & P Documents in PDR & Lpdr Located in San Luis Obispo,Ca.App Q Documents Totally Withheld (Ref FOIA Exemption 5))
  • ML20137A658  + (Twelfth Partial Response to FOIA Request for Documents. Records in App U Withheld in Part (Ref FOIA Exemptions 4 & 6))
  • ML20137A663  + (Twelfth Partial Response to FOIA Request for Documents. Records in App U Withheld in Part (Ref FOIA Exemptions 4 & 6))
  • ML19332F388  + (Twelfth Quarterly Rept Cleveland Electric Illuminating Seismic Monitoring Network,Jul-Sept 1989)
  • PLA-5503, Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms  + (Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D.2, Modification Group NIS-2 Forms)
  • ML022120321  + (Twelfth Refueling & Inspection Outage ISI Summary Report, Appendix D, ASME Repairs & Replacements NIS-2 Forms)
  • ML022120052  + (Twelfth Refueling & Inspection Outage ISI Summary Report)
  • ML022120110  + (Twelfth Refueling & Inspection Outage ISI Summary Report, Table of Contents - Appendix C)