Twelfth Motion for Summary Disposition of Contention Necnp I.D.1 Re Compliance W/Gdc 1.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence
ML20070W231
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/11/1983
From: Dignan T, Gad R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE, ROPES & GRAY
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20070W233 List:
References
ISSUANCES-OL, NUDOCS 8302180355
Download: ML20070W231 (3)


Text

-.

. O co'm"'O'mmry Filed: Fcbrunry 11, 1983 kc[80 UNITED STATES OF AMERICA 17 N0:56 NUCLEAR REGULATORY COMMISSION ,

g ,.

,iftjt, "

before the ATOMIC SAFETY AND LICENSING SOARD

)

In the Matter of )

)

PUBLIC SERVICE COMPANY OF NEW ) Docket Nos. 50-443 OL HAMPSHIRE, et al. ) 50-444 OL

)

(Seabrook Station, Units 1 & 2) )

)

APPLICANTS' TWELFTH MOTION FOR

SUMMARY

DISPOSITION (CONTENTION NECNP I.D.1)

Pursuant to 10 CFR S 2.749, the Applicants hereby move for summary disposition of contention NECNP I.D.1.

This motion is submitted upon the affidavit of John L. Lance, attached hereto. As is set forth in Mr.

Lance's affidavit, the ultrasonic testing of reactor vessel welds during preservice and inservice examination will be pursuant to ASME Section XI as D

, 8302180355 830211 {U PDR ADOCK 05000443 .

Q PDR

, 4 specified in the PSI /ISI programs and per the requirements of Reg. Guide 1.150 as modified by the Recore:nended Changes to Regulatory Guide 1.150 presented to NRC in August of 1982.

This will assure compliance with GDC 1 inasmuch as the testing will be to identified, applicable and sufficient generally recognized codes and standards and thus there remains no factual issue to be heard in connection with NECNP 1.D.l.

Respectfully submitt'-,

(2K G d au Thomas G. Dignan, Jr.

R. K. Gad III Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 Telephone: 423-6100 l Dated: February 11, 1983 I

1 I

1

[

, s STATMENT OF MATERIAL FACTS AS TO WHICH THERE IS NO DISPUTE

1. Seabrook reactor vessel welds will be examined during preservice and inservice examinations using the requirements of ASME Section XI as specified in the PSI /ISI programs and per the requirements of Reg. Guide 1.150 as modified by Recommended Changes to Regulatory Guide 1.150 as presented to NRC in August of 1982.
2. The PSI contractor, NES of Danbury, CT has the demonstrated ability to carry out inspections in accordance with the above-named codes and standards.

l t

l l

l i

l

[

( -

l 1

-.. __ -_ . _ - - -