Thomas D. Gatlin Vice President, Nuclear Operations 803.345.4342 March 6, 2013 A SCANA COMPANY RC-1 3-0026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir/Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 TWENTIETH REFUELING INSERVICE INSPECTION (ISI) REPORT Attached is the Virgil C. Summer Nuclear Station Refueling Outage 20 Inservice Inspection Report required by Subsection IWA-6200 of the ASME Boiler and Pressure Vessel Code. The attached report summarizes the inspections of plant piping, components and supports performed during the interval from the end of Refueling Outage 19 to December 7, 2012. Document reviews, approvals, and certifications that were not completed by the end of the reporting period will be reported either by amendment or will be included in the next report.
The report contains the required Form NIS-1 (Owner's Data Report for Inservice Inspection) and a summary of the ASME Inservice Examination activities. The examination and repair activities are provided in the following tabbed sections:
Tab A -
Pre-Service Examination Summary Tab B -
Inservice Examination Summary Tab C - IWE/IWL Containment Inspection Report Tab D - Repair and Replacement Summary (NIS-2, Owner's Data Report for Repair or Replacements)
Tab E -
Reactor Vessel Head Examination and Repair Summary Should you have any questions concerning the details of this report, please call Mr. Mel Browne, Manager of Quality Systems, at (803) 345-4141; Mr. Furman Miller, Supervisor of Quality Control, at (803) 345-4132; or Mr. Edward Colie IV, ISI Coordinator, at (803) 345-4154.
Very truly yours, Thomas D. Gatlin JG/TDG/bj Attachment c:
(Without Attachments unless noted)
K. B. Marsh E. A. Brown S. A. Byrne NRC Resident Inspector J. B. Archie K. M. Sutton N. S. Cams NSRC J. H. Hamilton RTS (LTD-323)
J. W. Williams File (810.19-3, RR 5300)
W. M. Cherry PRSF (RC-13-0026) (w/att.)
V. M. McCree (w/att.)
Virgil C. Summer Station - Post Office Box 88
- Jenkinsville, SC. 29065
- F (803) 345-5209 kAtz
INSERVICE INSPECTION REPORT # 18 Interval 3, Period 3, Outage 2 (Refuel 20)
FOR VIRGIL C. SUMMER NUCLEAR STATION (Unit #1)
P.O. Box 88 Jenkinsville, S. C. 29065 SOUTH CAROLINA ELECTRIC & GAS COMPANY Cayce, S.C. 29033 Commercial Service Date Report Completion Date 01-01-1984 03-04-2013 PAGE 1 of 14
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules I
- 1. Owner
- 2. Plant South Carolina Electric & Gas Company - Cayce, S. C. 29033 (Name and Address of Owner)
V '
Q-p q ctatinn - 1) (1 11^v 2
- lPnI-inclwillPQ (~ ' )AA (Name and Address of Plant)
- 3. Plant Unit 1
- 4. Owner Certificate of Authorization N/A
- 5. Commercial Service Date 01/01/1984
- 6. National Board Number for Unit N/A
- 7. Components Inspected:
Manufacturer Manufacturer or State or National Component or Appurtenance or Installer Installer Serial No.
Province Board No.
No.
COMPONENT COOLING DCC CC N/A N/A FEEDWATER DCC FW N/A N/A REACTOR COOLANT DCC RC N/A N/A RESIDUAL HEAT REMOVAL DCC RH N/A N/A SAFETY INJECTION DCC SI N/A N/A REACTOR BUILDING SPRAY DCC SP N/A N/A SERVICE WATER DCC SW N/A N/A CHILLED WATER DCC VU N/A N/A PAGE 2 of 14
FORM NIS-I (back)
NW
- 8.
Examination Dates 2-2011 to 2-2013
- 9.
Inspection Period Identification:
a
- 10.
Inspection Interval Identification:
III
- 11.
Applicable Edition of Section XI 1998 Addenda 2000
- 12.
Date/Revision of Inspection Plan ISE-5. Dated 03-24-2011. Revision 4
- 13.
Abstract of Examination and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan.
See Page 4
of 12 of Summary Report # 18
- 14.
Abstract of Results of Examination and Tests.
See Page A
of J2,*
of Summary Report # 18
- 15.
Abstract of Corrective Measures See Page A
of 1J.
of Summary Report # 18 We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code Section XI.
Certificate of Authorization No. (if applicable)
NWA xp 15 i nj tN/A Date 9~PiL?41Z Signed S. C, E. &G.
By
.A I-Owvner CERTIFICATE OF INSERVICE INSPFCTI-ON I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by HSBCT Company_ of HARTFORD. CONNECTICUT have inspected the components described in this Owner's Report during the period September 2011 to Febrar 2013 and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
aos a UA Commissions Inspector's Signature National Board, State, Province, and Endorsements Date f23 0
/2013 PAGE 3 of 14
ABSTRACT This report presents the results of the Inservice Inspection for the twentieth refueling outage, the second outage of the third period in the third interval at the Virgil C.
Summer Nuclear Station, Unit 1. Examinations of piping welds, piping system components, bolting and component supports were conducted in accordance with ASME Section XI. Repair and replacement efforts included maintenance component items along with planned modifications. The inspection of the Reactor Building Containment structure was performed in accordance with the IWE/IWL program manual, ISE-4, and is discussed separately in Section 4.0 of this report and Tab C.
Pressure testing of ASME code systems and their associated components was performed in accordance with the requirements of ASME Section XI, IWA-5000, IWB-5000 and IWC-5000. No flaws which exceeded the acceptance criteria established by ASME Section XI were accepted for continued operation during the scheduled preservice or inservice examinations of pressure retaining components during this reporting period.
1.0 INTRODUCTION
The Inservice Inspection of the twentieth refueling outage at the Virgil C. Summer Nuclear Station, Unit 1 was conducted in accordance with the site Technical Specifications and the Final Safety Analysis Report. These documents describe the extent to which the American Society of Mechanical Engineers, Boiler and Pressure Vessel Code,Section XI, 1998 Edition 2000 Addenda applies to the Virgil C.
Summer Nuclear Station Inservice Inspection program. The Containment Inservice Inspection program for American Society of Mechanical Engineers, Boiler and Pressure Vessel Code,Section XI, Subsections IWE and IWL is governed by the 2001 Edition through the 2003 Addenda. This report contains a detailed item-by-item summary of examination results performed by South Carolina Electric and Gas Company personnel and their approved vendors since the last reporting of refuel nineteen. Examination reports, sketches and data sheets for the Class 1 and Class 2 system component inspections, visual examination data, examination limitations, consumable testing materials, personnel qualifications and calibration standard design criteria are retained by South Carolina Electric and Gas Company for archival review. Information for the following categories may be obtained through the South Carolina Electric and Gas Company, Virgil C. Summer Station, Unit 1, plant record system.
- 1. Personnel Certification
- 6.
Pressure Test Documentation
- 2. Examination Procedures
- 7.
Examination Data Reports
- 3. Consumable Certification
- 8. Ultrasonic Calibration Block
- 4. Inservice Inspection Drawings Material Certification
- 5. Corrective Action Reports
- 9.
Repair & Replacement Records PAGE 4 of 14
2.0 INSERVICE EXAMINATION EVALUATION 2.1 The twentieth Inservice Examination (ISE) outage, identified as Interval 3, Period 3, Refueling Outage 20 for the South Carolina Electric and Gas Company (SCE&G) and the Virgil C. Summer Nuclear Station, Unit 1, was performed in accordance with the Inservice Inspection Program prepared by SCE&G. The program manual and procedures (Manual ISE-5, Procedures SAP-1294, ES-439, QSP-210 and QSP-211) detail the description of examination areas, extent of examination, frequency of examination, percentages of components selected for examination and code specified category relative to each. All Inservice Examinations performed were conducted by the use of site-approved procedures and documented on procedural data reports. Each data report details the component or system examined, examination method employed, the procedure used to perform the test and all pertinent equipment settings or examination conditions. Recordable indications were documented and evaluated on the individual examination data reports. The reports are retained by the Virgil C. Summer Nuclear Station permanent records system for retrieval and review for the life of the component. A summary of examinations, attached herein, contains listings of the examinations performed detailing the component identification, code class, code category, code item number, exam or test method, work document, program type (PSI or ISI), examination result and other amplifying information.
2.2 The ultrasonic examinations performed revealed flaws requiring repair in 4 reactor vessel head-to-control rod drive mechanism penetration j-groove welds. These repairs were carried out by Engineering Change Request 50846 in accordance with the requirements stipulated in request for alternative RR-III-09 under 10CFR50.55a(g)(6)(ii)(D). These repairs were based on the NRC approved Westinghouse repair process in WCAP-15987-P-A, as modified by the approved relief request [ML12325A432]. No other ultrasonic examinations performed revealed flaw indications exceeding the acceptance criteria of ASME Section XI, 1998 Edition 2000 Addenda that apply to the Virgil C. Summer Nuclear Station.
2.3 Visual or surface examinations which revealed indications requiring evaluation have been dispositioned, repaired or replaced and re-inspected in accordance with the associated Code requirements to ensure those components have been returned to their design condition.
2.4 The results of examinations performed at the Virgil C. Summer Nuclear Station during the twentieth refueling outage have been classified in one of the following manner:
A. No Recordable Indications, NRI B. Procedurally recordable but Code acceptable indications, RI C. Indications evaluated and repaired or dispositioned, RI&E PAGE 5 of 14
2.5 The attached ISI Examination Summary itemize the components examined for the Virgil C. Summer Nuclear Station, Unit 1, Interval 3, Period 3, Refuel 20. The following is a brief explanation of the type of information included in the ISI Examination Summary.
A. Component Description - Brief description of the type exam performed.
B. Weld/Component ID - Component identification number for components examined or tested as detailed in the SCE&G Inservice Examination Program for the third interval. Component identifications with an asterisk (*) are listed to show the component has multiple examination categories being credited. Where the examination method is the same for a specific component with multiple categories, only one examination report may be referenced.
C. System - Major piping system designation or plant equipment identification number for the component examined.
D. Code Class - Component ASME Code Classification.
E. Code Category - ASME Section XI, IWX-2500 component category.
Augmented inservice examination programs required by 10CFR50.55a(g)
(6)(ii)(D,E,F) are AUG-06, and those for thermal fatigue requirements are listed as AUG-07.
F. Code Item - ASME Section XI, IWX-2500 component item number.
AUG-06 Code Item is the designation per Table 1 of ASME Section XI Code Cases N-722-1, N-729-1 or N-770-1.
G. NDE Type - The required non destructive examination listed from the ASME Section XI, IWX-2500 tables, Code Case Table 1, regulatory requirement, or industry commitment document.
H. Work Document - Station work document used to schedule and implement examinations.
I. Results - Individual results of the examination.
J. Remarks - Amplifying information about the performance of the examination.
2.6 Status of the Current Interval The scheduling of examinations for the third period of the third interval is in accordance with the guidelines established in ASME Section XI, Table IWX-2412-1. The current percentage of completed NDE examinations for Interval 3 is listed by code category and tabulated for reference on pages 12-13 of this report. Some code categories which have small populations of components may have deviated from the established values shown in Table IWX-2412-1 of the code due to relief requests, or component availability in accordance with code requirements. Refuel 20 was the final outage of the 3rd interval, originally scheduled to end December 31, 2013. The 3rd PAGE 6 of 14
interval will be extended into the Spring of 2014, just prior to Refuel 21.
The purpose of the extension is to capture one missed exam on one remaining valve type body, Category B-M-2, and the associated bolting Category B-G-2 for this valve type. This has been captured in the station corrective action program as CR-12-05434.
The number and percentages for completion of the third inservice inspection program plan vary for the reasons listed below.
A. Category B-A - Pressure retaining welds in reactor vessel. All of these exams were originally planned for the once per interval (10-year) examination of the reactor vessel scheduled for Refuel 20. The NRC granted the extension to the inspection interval of the reactor vessel examination requirements for category B-A and B-D welds from 10 years to 20 years with the SER for RR-III-07 dated July 19, 2012
[ML12191AI63].
B. Category B-D - Full penetration welded nozzles in vessels. All of these exams were originally planned for the once per interval (10-year) examination of the reactor vessel scheduled for Refuel 20. The NRC granted the extension to the inspection interval of the reactor vessel examination requirements for category B-A and B-D welds from 10 years to 20 years with the SER for RR-III-07 dated July 19, 2012
[ML12191A163].
C. Category B-M Valve bodies exceeding NPS 4.
Only 50% of the valve types have been disassembled for maintenance. One B-M-2 valve type was removed and disassembled for maintenance with no documentation of the VT-3 being performed. The third interval is being extended to capture this exam on a valve of the same group scheduled for the Spring of 2014.
D. Category B-N Welded core support structures and interior attachments to reactor vessels. These exams were planned for Refuel 20 originally due to the core barrel pull required for inspecting the reactor vessel welds. These exams took place during Refuel 18, but were not taken credit for due to Interval percentage requirements. The exams during RF18 were documented as Internal Vessel Visual Inspection (IVVI) items. During Cycle 21, these exam videos will be reviewed to document the VT-3 exams which were performed for item B13.60, Reactor Vessel Interior Attachments Beyond the Beltline Region. The third interval is being extended for these items.
E. Category B-N Removable core support structures. This issue is the same as is discussed in D above, except for Category B-N-3, item number B13.70, Core Support Structure. The third interval is being extended for these items.
PAGE 7 of 14
3.0 REPAIR AND REPLACEMENT PROGRAM 3.1 The Virgil C. Summer Nuclear Station repair and replacement program for the period beginning August 1, 2011 through February 1, 2013 involved corrective maintenance replacements and scheduled engineering design changes.
3.2 The work documents for those components affected by the repair and replacement program undergo extensive evaluation and review by station organizations and the Authorized Nuclear Inservice Inspection Agency.
Work package information included within this summary report are those which have completed all required reviews, final engineering approval and the required "ANTI" NIS-2 certification prior to the close of the reporting period specified in ASME Section XI, IWA-6230 and the ISE program Manual ISE-5. The station has established February 1, 2013 as the end of the reporting period for Refuel 20 and the document closing date for this reporting period. Work evolutions performed during the twentieth refueling outage whose document review, approval and certification process which was not finalized by the established closing date shall be reported either by an amendment to this original Refuel 20 NIS-2 summary or shall be included in the next report for Refuel 21 within the guidelines of ASME Section XI, IWA-6230.
3.3 The enclosed repair and replacement summary and the attached original ASME Section XI, NIS-2 forms (attached as Tab D) detail the system, component, component description, work document and a description of the work activity. Complete repair and replacement documentation for the specific component is maintained at the Virgil C. Summer Nuclear Station permanent records facility and is retrievable through the work document package.
PAGE 8 of 14
4.0 REACTOR CONTAINMENT BUILDING EXAMINATION PROGRAM A Containment Inservice Inspection (CISI) Program Plan (ISE-4) was developed for the Virgil C. Summer Nuclear Station (VCSNS) Unitl which details the requirements for the examination and testing of ASME Section XI Class MC and Class CC components. This Program Plan was developed in accordance with the requirements of the 2001 Edition (with Addenda through 2003) of the ASME Boiler and Pressure Vessel Code,Section XI, Division 1, Subsections IWE and IWL, as modified by NRC final rulemaking to 10 CFR 50.55a published in the Federal Register on October 1, 2004. This Program Plan was developed using the guidance in EPRI's Containment Inspection Program Guide, (ASME Section XI, Subsections IWE and IWL), GC-110698. Implementation of the CISI Program Plan was conducted in accordance with Quality Services Procedure STP-803.006, IWE and IWL Visual Examination.
The inspections performed during the Refuel 20 cycle included field inspections and engineering evaluation of the Containment structure to include the post-tensioning system, Class MC pressure retaining components and Class CC reinforced concrete containment.
The engineering report detailing the inspection activities performed and the responsible engineer evaluation is attached as Tab C to this report.
PAGE 9 of 14
5.0 REFUEL 19 HYDRO/LEAK TEST
SUMMARY
Leak test inspections were performed in accordance with ASME Section XI, plant technical specifications and station procedure SAP-145, "Containment Leakage Rate and Inservice Testing Programs". Performance of system and component pressure test is in accordance with station procedure GTP-304, "Inservice Inspection System Pressure Testing, Third Ten Year Interval". Also included within GTP-304 are the relief requests utilized in the conduct of the credited pressure tests. The table below lists those tests performed since the last summary report of Refuel 19.
SYSTEM SYSTEM DESCRIPTION CODE PROCEDURE WORK CLASS DOCUMENT MC Containment Liner MC GTP-304 1114364 SW Service Water Sys.
2 / 3 GTP-304 1116279 EF Emerg. Feedwater 2 / 3 GTP-304 1201697 SW Service Water Sys.
2 / 3 GTP-304 1210657 CVCS Chem. Volume Control 2/ 3 GTP-304 1211906 Sys.
RC Reactor Coolant I
STP0250.001 1209726 B
SI/CVCS Safety Injection 2 / 3 STP-250.002 1116304 RHR Residual Heat Removal 2
STP-1116326 250.004A CCW Component Cooling 2 / 3 STP-1112187 Water 250.006A EF Emerg. Feedwater 2 / 3 STP-1200263 250.010A MS Main Steam 2
STP-250.012 1112608 VU Chilled Water Sys.
3 STP-250.013 1116322 1116363 HR Hydrogen Removal 3
STP-250.016 1116364 CS Boric Acid 2/3 STP-250.017 1116325 PAGE 10 of 14
6.0 AUGMENTED EXAMINATION PROGRAM The Augmented Examination Program included in this summary document the inspections performed to satisfy regulatory documents other than ASME Section XI.
During this reporting period, examinations were conducted in accordance with plant technical specifications, engineering documents and the Nuclear Regulatory Commission required examinations of the Reactor Vessel exterior for evidence of boric acid residue. These examinations and data reports are not subject to the interface review by the Authorized Nuclear Inservice Inspection Agency for compliance with ASME Section XI requirements for personnel and examination, as is required by 10CFR50.55a, or other industry commitments.
The Augmented exams are summarized in Tab B on the Inservice Examination Summary.
PAGE I Iof14
7.0 INTERVAL EXAMINATION NUMBERS AND PERCENTAGES R-A F-A D-A C-C C-B II II I
II 05%
00%
00%
00%
00%
IIi I
I ii C
0 D
E C
A T
E G
0 R
Y C-A B-O B-N-3 B-N-2 B-N-1 B-M-2 B-L-2 B-K B-G-2 B-G-1 B-D B-B B-A II Im 0)I II 50%
II 100%
100%
100%
100%
100%
113%
100%
100%
II II II II 60%
II 0%
10%
20%
300A 40%
50%
60%
70%
80%
90%
100%
PERCENT COMPLETE
- B-A, B-D, B-N1, B-N-2, B-N-3 percentages were impacted by RR-Il-07 for Rx Vessel inspection extension to 20 years
- RF20 B-N-1 item is of the inside of the Upper Head on the stand
- RF-20 B-G-1 number of 58 = 58 B6.10, 58 B6.30, 58 B6.40, 58 B6.50 - actually 232 individual code items
- B-G-2 extra done to correct for valve type requirement
- B-M-2 Only required if valve is disassembled - Only 50% have been disassembled PAGE 12 of 14
O 7.0 INTERVAL EXAMINATION NUMBERS AND PERCENTAGES ASME SECTION XI INTERVAL III COMPLETION STATUS BREAKER OPEN DATE 4/12/2005 10/14/2006 4/25/2008 10/17/2009 4/15/2011 10/13/2012 BREAKER CLOSED DATE 6/1/2005 11/22/2006 6/14/2008 12/10/2009 5/31/2011 12/7/2012 TOTAL SP 2005 Fall 2006 SP 2008 Fall 2009 SP 2011 Fall 2012
% COMPLETE SELECTED RF-15 RF-16 RF-17 RF-18 RF-19 RF-20
- DONE
- LEFT RX VESSEL B-A 0%
18 0
0 0
0 0
0 0
18 OTHER VESSELS B-B 100%
5 2
0 0
1 2
0 5
0 NOZZLE/SHELL B-D 60%
30 5
0 0
11 0
2 18 12
> 2" BOLTS B-G-1 100%
82 0
0 24 0
0 58 82 0
< 2" BOLTS B-G-2 113%
244 92 0
0 68 30 86 276
-32 INTEGRAL (CC 509)
B-K 100%
2 0
1 0
0 0
1 2
0 PUMP CASING B-L-2 100%
1 1
0 0
0 0
0 1
0 VALVE BODY B-M-2 50%
8 2
1 0
0 0
1 4
4 RX INTERIOR B-N-1 100%
3 0
1 0
1 0
1 3
0 RX ATTACHMENTS B-N-2 0%
1 0
0 0
0 0
0 0
1 CORE SUPPORTS B-N-3 0%
1 0
0 0
0 0
0 0
3 0
0 0
0 0
3 3
0 VESSELS C-A 100%
6 0
2 0
2 0
2 6
0 NOZZLES C-B 100%
5 0
2 0
1 0
2 5
0 INTEGRAL C-C 100%
17 4
2 4
1 2
4 17 0
INTEGRAL D-A 100%
11 3
0 0
4 2
2 11 0
SUPPORTS F-A 100%
203 32 32 32 35 33 39 203 0
RISK PIPING R-A 105%
98 16 18 31 7
18 13 103
-5 738 157 59 91 131 87 214 739
- B-A, B-D, B-N-i, B-N-2, B-N-3 percentages were impacted by RR-111-07 for Reactor Vessel inspection extension to 20 years. ML
- R-A category exceeded due to Risk Informed ISI being a living program
- RF-20 B-G-1 number of 58 = 58 B6.10, 58 B6.30, 58 B6.40, 58 B6.50 - actually 232 individual code items
- B-G-2 extra done to correct for valve type requirement
- B-M-2 Only required if valve is disassembled - Only 50% have been disassembled PAGE 13 of 14
INSERVICE INSPECTION REPORT #18 REFUEL 20 INDEX OF EXAMINATIONS TAB EXAMINATION ACTIVITY A
PRE-SERVICE EXAMINATION
SUMMARY
B INSERVICE EXAMINATION
SUMMARY
C IWE/IWL CONTAINMENT INSPECTION REPORT D
REPAIR & REPLACEMENT
SUMMARY
E REACTOR VESSEL HEAD EXAMINATION
SUMMARY
PAGE 14 of 14
Document Control Desk RC-1 3-0026 Attachment VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INSERVICE INSPECTION REPORT #18 REFUEL 20 TAB A PRE-SERVICE EXAMINATION
SUMMARY
Pre Service Examination Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 DRA WING COMPONENT SYSTEM CATEGORY ITEM NDE WORK ORDER #
REMARKS S-321-671-0219 S-321-671-0934 S-321-671-0941 S-321-671-0944 S-321-671-0946 S-321-671-1801 S-321-671-1899 S-321-671-4037 S-321-671-4038 S-321-671-5055 S-321-671-5056 S-321-671-5057 S-321-671-5058 S-321-671-5059 S-321-671-5060 S-321-671-5061 S-321-671-5062 S-321-671-5063 S-321-671-5064 S-321-671-5065 S-321-671-5066 S-321-671-5073 CSH-0219 CSH-0934 CSH-0941 CSH-0944 CSH-0946 CSH-1801 CSH-1899 CSH-4037 CSH-4038 CSH-5055 CSH-5056 CSH-5057 CSH-5058 CSH-5059 CSH-5060 CSH-5061 CSH-5062 CSH-5063 CSH-5064 CSH-5065 CSH-5066 CSH-5073 RC RC CS CS CS CS CS RC RC CS CS CS CS CS CS CS CS CS CS CS CS CS F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.10 F1,10 F1.10 F1.10 F1.10 F1.20 F1.20 F1.10 F1.10 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 1113202 1113202 1113202 1113202 1113202 0705691 1103681 1113202 1113202 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1203743 SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE RE-INSTALLED PIPE SUPPORT ADDED NEW SUPPORT TO SYSTEM SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM Thursday, February 28, 2013 Inspection Report Retrievable with Work Order in PRS Page) of 2 Thursday, February 28, 2013 0
Inspection Report Retrievable with Work Order in PRS Page I of 2 0
DRA WING COMPONENT SYSTEM CATEGORY ITEM ADE WORK ORDER #
REMALRKS DRA WING COMPONENT SYSTEM CATEGORY ITEM NDE WORK ORDER U REMARKS S-321-671-5074 S-321-671-5075 S-321-671-5076 S-321-671-5078 S-321-671-5081 S-321-671-5082 S-321-671-5083 S-321-671-5087 S-321-671-5088 S-321-671-5089 S-321-671-5090 S-321-671-5091 S-321-671-5092 S-321-671-5094 S-321-671-5095 S-321-085-0047 S-321-271-5192 302-602 S-321-601-0002 S-321-601-0004 S-321-691-1189 1 MS-07-136 1 MS-07-136 1 MS-07-136 1 MS-07-136 CSH-5074 CSH-5075 CSH-5076 CSH-5078 CSH-5081 CSH-5082 CSH-5083 CSH-5087 CSH-5088 CSH-5089 CSH-5090 CSH-5091 CSH-5092 CSH-5094 CSH-5095 EFH-0047 IAH-5192 PCV00444C-R RCH-0002 RCH-0004 SIH-1-189 XRE-0001-19 XRE-0001-31 XRE-0001-37 XRE-0001-52 CS Cs CS CS CS Cs CS Cs Cs Cs CS Cs Cs CS Cs SW IA RC Cs CS SI RC RC RC RC F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A B-G-2 F-A F-A F-A AUG-06 AUG-06 AUG-06 AUG-06 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.20 F1.30 F1.30 B7.70 F1.10 F1.10 F1.20 B4.20 B4.20 B4.20 B4.20 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-1 VT-3 VT-3 VT-3 PT PT PT PT 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1016476 1200504 1211920 1113202 1113202 1213735 1212234 1212232 1212233 1212229 ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM ADDED NEW SUPPORT TO SYSTEM RE-INSTALLED PIPE SUPPORT REPLACED PIPE SUPPORT REPLACED BOLTING SUPPORT RETURNED TO SERVICE SUPPORT RETURNED TO SERVICE RE-INSTALLED PIPE SUPPORT PT OF WELD OVERLAY REPAIR, BASELIN PT OF WELD OVERLAY REPAIR, BASELIN PT OF WELD OVERLAY REPAIR, BASELIN PT OF WELD OVERLAY REPAIR, BASELIN Thursday, February 28, 2013 Inspection Report Retrievable with Work Order in PRS Page2of2 Thursday, February 28, 2013 0
Inspection Report Retrievable with Work Order in PRS Page 2 of 2 is
Document Control Desk RC-13-0026 Attachment VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INSERVICE INSPECTION REPORT #18 REFUEL 20 TAB B INSERVICE EXAMINATION
SUMMARY
ISI Examination Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Component ID System Code Code Code Class Category Item RC 1
AUG-06 BMV OF S/G INLET NOZZLE TO SAFE END WELD BMV OF S/G INLET NOZZLE TO SAFE END WELD BMV OF NOZZLE WELD BMV OF S/G OUTLET NOZZLE TO SAFE END WELD BMV OF S/G OUTLET NOZZLE TO SAFE END WELD BMV OF NOZZLE WELD Rx VESSEL BMI NOZZLE,BMV,WCAP-1 6388-P-R2 UPPER HEAD & ALL PENETRATIONS UPPER HEAD TO CRDM TUBE, J GROOVE WELD BIMETAL (INCONEL) WELD. R.V.
LOOP C OUTLET NOZZLE TO SAFE END INCONEL WELD. SAFE END/PIPE BIMETAL (INCONEL) WELD. R.V.
LOOP B OUTLET INCONEL WELD. SAFE END/PIPE PIPE TO ELBOW AND ELBOW BASE METAL PIPE AND ELBOW AT WELD #3 PER MRP-146, 2.4.2.2 1-41 OOA-31 (DM) 1-4200A-28(DM) 1-4300A-29(DM) 1-41 OOA-32(DM) 1-4200A-29(DM) 1-4300A-30(DM) 1-1100B-BMI NOZZLES 1-1100-XRE1 1-1100-XRE1 1-4300A-1 (DM) 1-4300A-2 1-4200A-1 (DM) 1-4200A-2 1-4103A-14 1-4308-3 RC RC RC RC RC RC RC RC RC RC RC RC Sl CS AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-06 AUG-07 A-2 A-2 A-2 B
B B
B15.80 B4.10 B4.20 D
D E
VE, N-770-1 VE, N-770-1 VE, N-770-1 VE, N-770-1 VE, N-770-1 VE, N-770-1 VE, N-722-1 VE, N-729-1 UT-PDI, N-729-1 UT/ET-PDI, N-770-1 UT/ET-PDI, N-770-1 UT/ET-PDI, N-770-1 NRI 1200462-003 NRI 1200463-003 NRI 1200464-003 NRI 1200462-007 NRI 1200463-007 NRI 1200464-007 NRI 1200461-020 NRI 1200461-024 RI&E 1200461-015 RI 1200461-004 RI 1200461-004 RI 1200461-004 RR-III-08 RR-III-08 RR-III-08 RR-III-08 RR-III-08 RR-III-08 Nozzle Exterior Surfaces 4 nozzle repairs per WCAP-15987-NP-2A; RR-III-09 UT & ET; NO CHANGE UT & ET; NO CHANGE UT NRI; ET NO CHANGE UT NRI; ET NO CHANGE MRP-146 E
UT/ET-PDI, N-770-1 N/A UT-PDI/88-08-2 N/A VT-2/BMV RI NRI NRI 1200461-004 1200465-032 1200465-025 1
AUG-07 Thursday, February 28,2013 0
Page ) of 7 0
ISI Examination Summary V. C. Summer Nuclear Station Interval 111, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Component ID Code Code Code System Class Category Item PIPE BASE METAL AT WELD #3 PER MRP-146, CR-06-02167-005 PIPE AND ELB3OW AT WELD #4 PER MRP-146, 2.4.2.2 PIPE BASE METAL AT WELD #4 PER MRP-146, CR-06-02167-005 PIPE TO ELBOW PIPE TO ELBOW PIPE TO ELBOW AND ELBOW BASE METAL PRESSURIZER SURGE LINE NOZZLE TO VESSEL WELD PRESSURIZER SURGE LINE NOZZLE INNER RADIUS R.V. CLOSURE HEAD HYDRANUTS
- 01-58 R.V. CLOSURE HEAD STUD #01-58 R.V. FLANGE THREADS #01 -58 R.V. CLOSURE HEAD WASHERS
- 01-58 R.C. PUMP SEAL INJECTION LINE FLANGE BOLTING, 4 STUDS & 8 NUTS SAFETY VALVE XVS-801 OA INLET FLANGE BOLTING, 12 STUDS & 12 NUTS REACTOR COOLANT PUMP 'C' - #1 SEAL HOUSING BOLTS - 12@
Thursday, February 28, 2013 1-4308-3 1-4308-4 1-4308-4 1-4103A-12 1-4103A-13 1-4103A-15 1-2100A-8 1-2100A-8-IR 1-1400-XRE1-NUT-01 1-1400-XRE1-SRM-01 1-1100A-THRD-01 1-1400-XRE1-WSHR-01 1-4114-FLANGE 1 1-4501-FLANGE 1 1-5100A-1C CS CS CS Sl Sl SI RC RC RC RC RC RC CS AUG-07 AUG-07 AUG-07 AUG-07 AUG-07 AUG-07 B-D B-D B-G-1 B-G-1 B-G-1 B-G-1 B-G-2 N/A N/A N/A R.1.11 R1.11 R1.11 B3.110 B3.120 B6.10 B6.30 B6.40 B6.50 B7.50 B7.50 B7.60 UT/PDI/MRP-146 VT-2/BMV UT/PDI/MRP-146 UT-PDI/88-08-2 UT-PDI/88-08-2 UT-PDI/88-08-2 UT UT VT-1 UT-PDI W/UT-PDI VT-1 VT-1 VT-1 VT-1 NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI 1200465-025 1200465-025 1200465-025 1200465-032 1200465-032 1200465-032 1200466-004 1200466-004 1200461-009 1200461-009 1200461-003 1200461-009 1200467-001 Scanned according to MRP-146.24.2.2 MRP-146 Scanned according to MRP-146.24.2.2 Ltd coverage due to heaters/insul - 75.5%
residue - tested - dried oil RC I
B-G-2 RC 1
B-G-2 NRI 1117192-001 NRI 1110097-011 Page 2 of 7
ISI Examination Summary V. C. Summer Nuclear Station Interval 111, Period 3, Outage 2 Refuel 20 Work Results Document Remarks Component Description Weld Number or Component ID Code Code Code System Class Category Item NDE Type CHECK VALVE BOLTING, 16 STUDS
& NUTS CHECK VALVE BOLTING, 16 STUDS
& NUTS CHECK VALVE BOLTING, 18 STUDS
& NUTS RX HEAD VENT BOLTING NOZZLE-BUTTER TO PIPE-BUTTER WELD.
WELDED ATTACHMENT (SIH-413 ANCHOR)
SAFETY VALVE INTERNALS RX HEAD VENT VALVE BODY INTERNALS R.V. INTERIOR, UPPER HEAD ON STAND CRDM HOUSING WELD CRDM HOUSING WELD CRDM HOUSING WELD
'C' STEAM GENERATOR SHELL TO UPPER HEAD WELD
'C' STEAM GENERATOR SHELL TO TUBESHEET 1-4203A-8988B*
1-4203A-8993B*
1-4301-8948C*
XVT08096B-RC 1-41 OOA-35 1-4311-WS-1 1-4501-8010A XVT08096B-RC 1-1100- XRE1 1-1300A-16 1-1300A-25 1-1300A-9 2-1100-20C SI SI SI RC RC Sl RC RC RC RC RC RC S/G 'C' B-G-2 B-G-2 B-G-2 B-G-2 B-J B-K B-M-2 B-M-2 B-N-1 B-O B-O B-O C-A B7.70 B7.70 B7.70 B7.70 B9.11 B10.20 B12. 50 NA B13.10 B14.10 B14.10 B14.10 C1.20 VT-1 VT-1 VT-i VT-1 UT/ET-PDI, N-770-1 VT-I VT-3 VT-3 VT-3 PT PT PT UT NRI NRI NRI NRI RI NRI NRI NRI NRI NRI NRI NRI 1200468-002 1200469-002 1200470-001 1201166-001 1200461-004 1200471-001 CR-12-05434 1201166-001 1200461-018 1200461-016 1200461-016 1200461-016 1200464-015
- Bolting
- Bolting
- Bolting UT NRI; ET NO CHANGE 3rd Interval extension to Spr 2014 NPS 2 valve resealed RV Head Interior Surface change from 1-1300A-15 RF20 due to shield access change from 1-1 300A-20 RF20 due to shield access change from 1-1300A-7 RF20 due to shield access 2-1100-15C S/G 'C' 2
C-A C1.30 UT NRI 1200464-011 Thursday, February 28, 2013 is Page 3 of 7 0
ISI Examination Summary V. C. Summer Nuclear Station Interval II1, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Component ID Code Code Code System Class Category Item
'C' STEAM GENERATOR SHELL TO FEEDWATER NOZZLE WELD
'C' STEAM GENERATOR SHELL TO FEEDWATER NOZZLE INNER RADIUS WELDED ATTACHMENT (RHH-0223 RIGID)
WELDED ATTACHMENT (RHH-4037 RIGID)
WELDED ATTACHMENT (CSH-0131 RIGID)
WELDED ATTACHMENT (SPH-01 11)
INTEGRAL ATTACHMENT INTEGRAL ATTACHMENT ANCHOR RIGID RIGID RIGID RIGID SPRING SPRING SPRING SPRING 2-1100-23C S/G 'C' 2
C-B 2-1100-231R-C 2-2521-WS-2 2-2521-WS-8 2-2522B-WS-4 2-3000-WS-3 CCH-0149*
CCH-0379" SIH-0413 SIH-0298 SIH-0387 SIH-0396 SIH-0444 RCH-0002 RCH-0178 RCH-0209 RHH-0182 S/G 'C' 2
C-B SI 2
C-C SI 2
C-C CS 2
C-C SP CC CC Sl SI Sl SI SI RC RC RC SI C-C D-A D-A F-A F-A F-A F-A F-A F-A F-A F-A F-A C2.21 C2.22 C3.20 C3.20 C3.20 C3.20 D1.20 D1.20 Fl.10A F1.10R F1.10R F1.10R F1.10R F1.10SP F1.10SP FI.10SP F1.10SP UT NRI/NRI 1200464-019 VT-1 VT-1 VT-i VT-1 VT-1iNT-3 VT-1 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 NRI 1200472-003 NRI 1200472-003 NRI 1200467-002 UT/MT NRI 1200464-019 NRI NRI/NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI RI&E 1200473-001 1200474-001 1200474-012 1200471-001 1200471-001 1200471-007 1200471-006 1200471-009 1200465-027 1200465-028 1200465-028 1200472-005 RI - Jam nut loose; tightened on WO 1212452-001 Thursday, February 28,2013 0
Page 4 of 7 0
ISI Examination Summary V. C. Summer Nuclear Station Interval I11, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Component ID Code Code Code System Class Category Item SPRING SPRING SPRING ANCHOR RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID RIGID SPRING SPRING SPRING SIH-0195 SIH-0395 SIH-0422 XRP-304 CSH-0131 CSH-01 36 RHH-0007 RHH-0223 RHH-4017 RHH-4037 SIH-0019 SIH-0020 SIH-0053 SIH-0101 SIH-0179 SPH-001 1 SWH-0104 RHH-0276 SIH-0393 SPH-0295 SI SI SI SW CS CS RHR RHR RHR RHR SI SI SI SI SI SP SW RHR SI SP F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.10SP F1.10SP F1.10SP FI.20A FI.20R FI.20R FI.20R F1.20R F1.20R F1.20R FI.20R F1.20R F1.20R FI.20R FI.20R FI.20R F1.20R FI.20SP FI.20SP F1.20SP VT-3 VT-3 Vr-3 Vr-3 Vr-3 Vr-3 Vr-3 VT-3 Vr-3 VT-3 Vr-3 Vr-3 Vr-3 VT-3 VT-3 VT-3 VT-3 VT-3 Vr-3 VT-3 NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI 1200471-006 1200471-006 1200471-008 1200475-001 1200467-002 1200467-002 1200472-005 1200472-003 1200472-005 1200472-003 1200471-002 1200471-002 1200471-003 1200471-004 1200471-005 1200473-001 1200476-006 1200472-006 1200471-006 1200473-001 100% of accessible areas 100% of accessible areas Thursday, February 28,2013 9
Page 5 of 7
ISI Examination Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Component ID Code Code Code System Class Category Item SPRING RIGID RIGID RIGID RIGID RIGID RIGID RIGID COMPONENT SUPPORT (REACTOR BLDG COOLER 2A)
COMPONENT SUPPORT (CCW HEAT EXCHANGER A)
COMPONENT SUPPORT (CCW PUMP A)
PIPE TO VALVE (XVC-8998B),
PIPE TO ELBOW PIPE TO ELBOW ELBOW TO PIPE-RISK BASED ISI BIMETAL(INCON EL)WELD.RV NOZZLE BUTTER WELD.
BIMETAL(INCONEL)WELD.PIPE BUTTER WELD.
PIPE TO ELBOW SPH-0296 CCH-0146 CCH-0379 SWH-4015 VUH-0088 VUH-0089 VUH-0090 VUH-0091 XAA-0002A XHE-0002A XPP-0001A 1-4202A-15 1-4202A-1 6 1-4202A-17 2-2302-33 1-41 OOA-33(DM) 1-4100A-34(DM) 1-4201A-11 SP CC CC SW VU VU VU VU SW 2
3 3
3 3
3 3
3 3
F-A F-A F-A F-A F-A F-A F-A F-A F-A F1.20SP F1.30R F1.30R F1.30R F1.30R F1.30R F1.30R F1.30R F1.40 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 NRI NRI NRI NRI NRI NRI NRI NRI NRI 1200473-001 1200474-001 1200474-012 1200476-006 1200477-002 1200477-002 1200477-002 1200477-002 1200478-001 100% of accessible areas 100% of accessible areas 100% of accessible areas 100% of accessible areas 100% of accessible areas 100% of accessible areas CC 3
CC 3
F-A F1.40 F-A F1.40 SI SI SI FW RC 2
1 R-A R-A R-A R-A R-A R1.1 1 R1.11 R1.11 R1.1 1 R1.15 VT-3 VT-3 UT-PDI UT UT UT-PDI UT/ET-PDI, N-770-1 NRI 1200479-001 100% of accessible areas NRI 1200480-001 100% of accessible areas NRI NRI NRI NRI RI 1200465-010 1200465-010 1200465-010 1200481-003 1200461-004 Single-Sided PDI UT NRI; ET NO CHANGE RC 1
SI 1
R-A R1.15 UT/ET-PDI, N-770-1 RI 1200461-004 UT NRI; ET NO CHANGE NRI 1200465-004 R-A R1.20 UT-PDI Thursday, February 28, 2013 0
Page 6 of 7 0
ISI Examination Summary V. C. Summer Nuclear Station Interval 111, Period 3, Outage 2 Refuel 20 Work NDE Type Results Document Remarks Component Description Weld Number or Code Code Code Component ID System Class Category Item PIPE TO ELBOW.RISK BASED ISI.
PIPE TO ELBOW.RISK BASED ISI PIPE TO ELBOW.RISK BASED ISI PIPE TO ELBOW.RISK BASED ISI PIPE TO ELBOW.RISK BASED ISI PIPE TO TEE 1-4201A-12 1-4302-2 1-4302-3 1-4304-2 2-2521-12 2-2557A-2 Sl Sl 1
1 SI 1
R-A R-A R-A R-A R-A R-A R1.20 R1.20 R1.20 R1.20 R1.20 R1.20 UT-PDI UT-PDI UT-PDI UT-PDI UT-PDI UT-PDI NRI 1200465-004 NRI 1200465-015 NR Geometry - Supplemented by 60 deg scan NRI 1200465-015 NR Geometry - Supplemented by 60 deg scan SI SI SW 1
2 2
NRI NRI RI 1200465-020 1200472-003 1200476-004 Geometry - Root geometry seen intermittently w/70 Thursday, February 28, 2013 Page 7 of 7 Thursday, February 28, 2013 Page 7 of 716
Document Control Desk RC-1 3-0026 Attachment VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INSERVICE INSPECTION REPORT #18 REFUEL 20 TAB C IWE I IWL CONTAINMENT INSPECTION REPORT
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL VIRGIL C. SUMMER NUCLEAR STATION RESPONSIBLE ENGINEER EVALUATION REPORT February 21, 2013 Prepared By:
Dale D. Krause, P.E.
IWE/IWL Responsible Engineer
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT TABLE OF CONTENTS SECTION DESCRIPTION INTRODUCTION PAGE 1.0 2.0 3.0 4.0 5.0 6.0 1
1 SCOPE INSPECTION PERSONNEL IWE/IWL INSPECTIONS INSPECTION PHILOSOPHY RESPONSIBLE ENGINEER EVALUATION 2
3 3
3 5
5 7
8 9
6.1 6.1.1 6.1.2 6.1.3 6.1.4 IWE Evaluation IWE Augmented Inspections IWE Pressure Test Connections to Leak Chases IWE Reportable Conditions IWE Reportable Conditions Requiring Augmented Inspections IWL Evaluation IWL Augmented Inspections IWL Reportable Conditions IWL Reportable Conditions Requiring Augmented Inspections
SUMMARY
AND CONCLUSIONS 6.2 9
6.2.1 6.2.2 6.2.3 9
10 10 11 7.0 PAGE i
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT
1.0 INTRODUCTION
This report evaluates the Containment Inservice Inspections which were conducted in accordance with the requirements of 10CFR50.55a at the Virgil C.
Summer Nuclear Station (VCSNS) during the period of October-November, 2012 concurrent with RF 20.
2.0 SCOPE The Containment Inservice Inspection (CISI) Program Plan (ISE-4) details the requirements for the examination and testing of ASME Section Xl Class MC and Class CC components at the VC Summer Nuclear Station (VCSNS). This Program Plan was developed in accordance with the requirements of the 2001 Edition (with Addenda through 2003) of the ASME Boiler and Pressure Vessel Code, Section Xl, Division 1, Subsections IWE and IWL, as modified by NRC final rulemaking to 10 CFR 50.55a published in the Federal Register on October 1, 2004. This Program Plan was developed using the guidance in EPRI's Containment Inspection Program Guide, (ASME Section Xl, Subsections IWE and IWL, GC-1 10698).
The components subject to ASME Section Xl, Subsection IWE and IWL requirements are those that make up the containment structure, its leak tight barrier (including integral attachments) and those that contribute to its structural integrity.
Specifically included are Class MC pressure retaining components and their integral attachments, (including metallic shell and penetration liners of Class CC pressure retaining components and their integral attachments), per IWE-1 100; and Class CC reinforced concrete containments and post-tensioning systems, per IWL-1100.
The terms "Class MC" and "Class CC" are used in Section XI to identify components which meet the functional definitions in IWE-1 100 and IWL-1 100; these terms should not be equated with components and items that are designed per ASME Section III, Class MC and Class CC rules. Typically, the scope of components and items subject to ASME Section III rules for Class MC Containment vessels and Class CC pre-stressed and reinforced concrete containments extends beyond that of ASME Section Xl, Subsections IWE and IWL.
This Program Plan is effective from January 1, 2007 to December 31, 2016 for Subsection IWE and Subsection IWL activities. IWE and IWL inspections will be Page 1 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT performed according to the schedules shown on Tables 4.1.2.4-1 and 4.2.2.4-1 in ISE-4.
This report includes Period 2 IWE and IWL Inspections performed during the Planned Outage for RF-20 during the Fall of 2012.
The scope of inspections in accordance with the ISE-4 RF-20 Outage Plan for Interval 2, Period 2 included the following component inspections:
Entire Accessible Steel Cylinder and Dome Liner Moisture Barrier at 412' Basement slab perimeter concrete to steel liner.(Augmented)
Concrete Tendon Access Gallery (Augmented)
Valve Chambers and Guard Pipes for "A" and "B" RHR and Spray (Augmented)
Penetrations and Hatches Leak Chase Pressure Test Connections (special inspections)
Design Guideline ST-07, Containment Inservice Inspection Evaluation Criteria, was developed to support this program, and provides inspection criteria used to identify degradation mechanisms requiring documentation as "Recordable Indications". Also included are descriptions of suspect conditions which require evaluation and resolution by the Responsible Engineer.
3.0 INSPECTION PERSONNEL Detailed inspections were conducted by or under the supervision of Quality Control (QC) Personnel and the Responsible Engineer. Each inspector was qualified to meet the requirements of the VCSNS CISI Program Plan ISE-4 or an equivalent vendor program.
The IWE/IWL Responsible Engineer participated interactively with the QC supervision and inspection personnel. The Responsible Engineer, Dale D.
Krause, has a BS Degree in Civil Engineering from Lehigh University, with over 15 years of experience in the design, modification, and inspection of Virgil C.
Summer Nuclear Station and over 30 years experience in structural engineering in the field of nuclear power plants. The Responsible Engineer is a Registered Professional Engineer in the State of Pennsylvania (PE-020392-E) and is the Principal Civil Engineer at Virgil C. Summer Nuclear Station.
PAGE 2 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT 4.0 IWE I IWL INSPECTIONS The 2012 IWE and IWL inspections were conducted as an ongoing assessment of the condition of the containment structure. The IWE/IWL inspections and tests were started in October and completed in November 2012.
The IWE inspections included a combination of General Visual, VT-3, and VT-1 examinations using QC inspector walk downs. Inspections were made of all accessible containment liner surface areas using direct line of sight from permanent vantage points. The QC inspector walk downs were used for all containment liner surfaces (including penetrations) as well as the containment liner surfaces in the dome above the spring line. QC inspections were also made on the containment isolation valve containers and guard pipes for the RHR and Reactor Building Spray Systems which are defined as extensions of containment located in the Auxiliary Building at Elevation 397'.
It is noted that the exterior surfaces of the carbon steel guard pipes within the penetration sleeves were prepared and recoated during RF 20. The surface of the guard pipes was visually inspected by fiber scope prior to and after recoating.
In addition to the required visual Augmented Inspections of the RHR and Containment Spray Penetrations, the augmented inspection of the recoated guard pipe surfaces during RF 20 included visual examination by fiber scope of the recoated guard pipes within the penetration sleeves.
5.0 INSPECTION PHILOSOPHY The 2012 inspection is an ongoing inspection and assessment program in compliance with ASME Section XI Subsections IWE and IWL. Previous examinations had identified areas for augmented examination. The augmented examinations were conducted to determine whether continued degradation had occurred or if the degradation had stabilized relative to the results of the previous inspection.
6.0 RESPONSIBLE ENGINEER EVALUATION Based on the inspections and examinations during RF-20, no degraded conditions were identified by the Responsible Engineer evaluation which are considered to be abnormal degradation or of structural function significance.
Additionally, no new conditions which exceeded the ST-07 threshold criteria (i.e.
PAGE 3 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT are likely to experience accelerated degradation or aging) were identified during the inspections.
6.1 IWE Evaluation For the IWE inspections, accessible areas are defined as visible using direct line of sight from permanent vantage points. On the inside of containment there were containment liner surface areas which were previously determined to be inaccessible either due to high radiation or obscured by direct line of sight from permanent vantage points. These inaccessible areas are a small fraction of the total surface area inspected and are also subject to the same environmental and/or service conditions as the much larger representative areas that were inspected.
6.1.1 IWE Augmented Inspections Augmented inspections of the following components have been conducted since their identification during the baseline inspection in 2000 and were performed during this 2012 inspection.
Moisture Barrier Integrity RHR and RB Spray Penetration Guard Pipes Augmented inspections of the following components were not performed during RF 20 because these items had been deleted previously from the Augmented Inspection list:
Liner Plate Bulges (Deleted from Augmented Inspection list after RF 17 Inspection because no change in the condition since first observed in 2000.
Liner Plate Dome Coatings (Deleted from Augmented Inspection list after RF 18 Inspection because no change in the condition since first observed in 2000.)
6.1.1.1 Moisture Barrier Integrity:
All accessible areas of the Containment Moisture Barrier between the perimeter of the basement floor slab at Elevation 412' and the Containment liner were examined during RF 20. The Containment Moisture Barrier seals the small gap between the perimeter of the concrete floor slab and the containment steel liner PAGE 4 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT plate. This sealant joint has been subject to inspections and maintenance over the years because it has been observed that minor degradation has occurred at the sealant detail along with some light rusting in a few local areas of the RB liner plate typically where the sealant loses adhesion to the liner. This location has been the subject of NRC Information Notice 2004-09 Corrosion of Steel Containment and Containment Liner because typical minor degradation in the sealant and minor rusting on the adjacent liner has been identified at a number of plants. None of the inspection findings documented below reduced the design basis thickness of the RB liner plate nor reduced the capability of the liner to perform the required design basis containment function under the required loads and conditions. The examination was in accordance with the ISE-4 plan and specifically the ASME Code for IWE, Table 2500-1 in the 2001 Edition with the 2003 Addenda.
The Augmented Inspection of the moisture barrier seal performed during RF-20 identified a number of locations where the sealant detail required maintenance rework to continue to perform its design function. The local spots were reworked to the acceptable design condition as described in the NC/CR 12-05160.
It is noted that CER 04-1517,CR 08-01993, and CR 09-04879 documented similar observations found during previous IWE Inspections of the moisture barrier seal and the actions that were taken to perform the maintenance to rework the identified locations to meet design requirements.
Augmented Inspections will continue during each refueling outage to ensure the moisture barrier seal condition is maintained so that it serves its design function to protect the liner from corrosion.
6.1.1.2 RHR & Spray Guard Pipes Early during the RF-1 9 outage in 2011, the Augmented Inspection of the RHR and RB Spray Guard Pipes was performed by Quality Control and Design Engineering. The purpose of the inspection was to continue to monitor issues previously identified during the initial IWE / IWL inspections (Fall 2000). The interspace between the penetration Guard Pipes and the surrounding sleeve pipe has exhibited in leakage of groundwater with some corrosion on the exterior of the carbon steel Guard pipes. It had been confirmed that the guard pipe thickness met the minimum required design thickness. The completion of the implementation of ECR-50560, "Dewatering System Design and Installation" since the last Augmented Inspection during RF 17 had reduced to a large extent the groundwater in leakage at the guard pipes which facilitated the rework to prepare and recoat the guard pipes during RF18.
PAGE 5 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT The inspections performed during RF 19 including direct visual and remote visual by fiberscope found that groundwater in leakage was still occurring resulting in conditions that were found to be supporting corrosion of the guard pipes at some of the newly coated areas from RF 18. This condition was evaluated under CR-11-03206. The evaluation determined that the guard pipe wall thickness measurements from ultrasonic examination after the hydrolazing prior to recoating during RF 18 indicated thickness with adequate margin to meet design requirements until the next Augmented Inspection during RF 20 in consideration of the rate of corrosion that has been observed over a period of many years on the guard pipes. The proposed corrective actions from CR 11-03206 include performing maintenance work to prepare and recoat the pipe during RF 20. The QC fiber scope inspection of the guard pipes during the initial part of RF 20 identified that the guard pipes recoating to be done during RF 20 had not been completed. The condition was identified and evaluated by CR 12-05536.
Subsequently, during RF 20 the guard pipes were prepared, recoated and reinspected with a fiber scope with acceptable conditions observed.
There were no observable changes to the condition of the containment isolation valve containers compared to the previous inspection.
The following historical information is noted. Subsequent, to the early RF-18 Augmented Inspection of the guard pipes, the non-conformance CR-06-03337 Actions 7 and 9 were implemented during RF-1 8 to perform coating maintenance rework on the exterior surface of the guard pipes. The surface of the guard pipes within the penetration sleeves was prepared by removing existing coatings and corrosion. CR-06-03337 Actions 10 performed inspection to ensure the pipe thickness both locally and in general met the acceptance criteria established in the design basis calculations. The inspection consisted of 100% visual examination of the surface using a fiber scope. Local spots of pitting were identified and the thickness determined using measurements taken with a mechanical pit gauge. In addition accessible and representative locations on each guard pipe were identified and thickness measured by Ultrasonic Testing Method (UT at representative general locations. The Responsible Engineers Technical Work Record attached to CR06-03337 Action 10, documents the UT measurements of wall thickness for the guard pipes and compares the measurements to the minimum required thickness. In all cases there is a good margin between the measured wall thickness and the required wall thickness.
The current CR 12-05536 evaluation from RF 20 found the guard pipe thickness to be acceptable.
PAGE 6 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT 6.1.2 Pressure Test Connections to Leak Chases on Inaccessible Bottom Liner Plate During RF 19 it was determined that the IWE program did not include, and that there had never previously been, a General Visual examination of any of the pressure test connections to the bottom liner leak chases since they had been installed during plant construction over 30 years ago. This condition was identified and evaluated under CR1 1-02834. There are 51 leak chase zones over liner plate welds for the inaccessible containment bottom liner plate. The / inch thick carbon steel bottom liner plate is located directly beneath the 4 foot thick reinforced concrete interior basement floor slab at Elev. 412' and on top of the 12 foot thick Reactor Building foundation mat. The liner serves as the leaktight pressure boundary for the containment. The liner does not serve as a strength element in the containment design. The pressure test connections served during construction for pressure-drop testing of each leak chase test zone to demonstrate no leakage in the zone both before and after concrete placement.
Each test connection is located within a small junction box with cover plate whose top is flush with the floor surface. The junction box cover design does not include a gasket or sealant against potential ingress of miscellaneous wash down water from the floor into the boxes during refueling outages or other leakage should it occur during the cycle.
The pressure test connection details which include a threaded pipe plug closure were found to be installed and performing their function to preclude any water from getting from the junction box down into the leak chases to the containment liner for 47 of the 51 junction boxes. However, for the remaining 4 of the 51 junction boxes, the pipe plug closure was found not to have been installed during plant construction. Water was found in the leak chases for 3 of the 4. The water was removed to maximum extent. Remote visual examinations were attempted with limited success by flexible fiber scopes. Very little corrosion was observed on the inside surfaces of the leak chase channels. The liner surface and liner weld surfaces were generally not visible. The limited leak chase surfaces that could be seen indicated very little corrosion had occurred over the years in these areas. Pressure-drop tests performed on these four zones found no leakage.
The pressure test connections within the junction boxes were added to the IWE inspection program for RF 20 (Refer to ISE-4 Revision 1 B) as described in the actions in CR1 1-02834.
New stainless steel pipe plugs were installed in the 4 pressure test connections with missing plugs during RF 19. The condition evaluation then found all 51 to be in an acceptable condition capable of performing the required function to keep any water that gets into the junction boxes from getting to the containment liner PAGE 7 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT within the leak chase zones until the boxes could be permanently repaired during RF 20.
The limited visual inspections and pressure drop testing of the four leak chase zones demonstrated no abnormal degradation of the liner is occurring within the leak chases and that there is no impact on the capability of the containment liner to serve as a leaktight pressure barrier component in the overall containment design.
During RF 20 all 51 junction boxes were visually examined after the cover plate was removed to ensure all of the stainless steel pipe plugs remained properly installed in the test connections. The four zones which had been found with missing pipe plug closures during the RF 19 inspection were completely dried out by vacuum pump and visually reexamined to the extent possible by remote boroscope. Pressure drop leak testing was performed on these four zones again to ensure no leakage degradation. All 51 junction boxes were then cleaned out of any loose materials and completely dried. The boxes and pipe plugs were reinspected by QC to ensure pipe plus installed and the boxes were clean and dry. The boxes were then permanently filled with epoxy grout. New stainless steel cover plates were permanently epoxy bonded to the surface of the epoxy grout fill in each box. In this fully repaired configuration with each box filled to the top and the pressure test connection with pipe plug fully encased within the epoxy grout fill there is no possibility for any unobserved water to inadvertently get into the boxes. The cover plates are fully bonded to the underlying fill and are no longer removable. All of the above inspections and repairs were performed under NC/CR1 1-02834 It is noted that the pressure test connections and junction boxes are not within the defined code boundary of the ASME Section Xl examinations. However, the inspections described above and testing were performed under the Section XI program by the qualified Section Xl QC inspectors including the inspections of all of the 51 repairs. The ISE-4 program plan will be revised during the cycle between RF 20 and RF 21 to delete the Position Statement and any related information (refer to ISE-4 para. 3.1.4) regarding the inspections and repair of the 51 junction boxes because that permanent repair has been completed during RF
- 20. No further inspections in the future of the pressure test connections within the junction boxes are required or are physically possible.
6.1.3 IWE Reportable Conditions There are no IWE Reportable Conditions as a result of the RF-20 year 2012 inspections.
PAGE 8 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT 6.1.4 IWE Reportable Conditions Requiring Augmented Inspections None of the results of the IWE inspection were found to exceed the evaluation criteria of Design Guide ST-07 or determined to be of concern that could potentially progress to an unacceptable structural condition prior to the next regularly scheduled surveillance in approximately 18 months during RF-21 (Spring 2014).
6.2 IWL Evaluation 6.2.1 IWL Augmented Inspections Augmented Inspection of the Containment Tendon Access Gallery (TAG) has been conducted during each inspection following its identification for Augmented Inspection during the baseline inspection in 2000. Prior to the current inspection performed during RF 20, the Augmented Inspection of the Containment Tendon Access Gallery was performed by Quality Control and Design Engineering during RF 19 in 2011. The inspection included previously identified issues from the IWE
/ IWL inspections (Fall 2000) and subsequent Augmented Inspections (2002, 2003, 2005, 2008, and 2009). The following were examined:
Corrosion build-up on the outer TAG wall near Tendon V-15 Concrete leaching at several locations within the TAG Housekeeping of the TAG The corrosion build-up was inspected and determined to be continuing but comparable to that observed during the prior 2000-2008 inspections.
The entire TAG was inspected for any changes in the amount of concrete leaching. The amount of groundwater inflow leakage remained minimal and additional accumulation of leaching materials was determined to be unchanged.
Sumps remained clear of debris to allow for drainage if required. Because the condition of concrete leaching has been stable for the past three inspections, inspection of the TAG for concrete leaching will be removed from the IWL Augmented Inspection list which required VT-1 inspection. Similarly, the housekeeping in the TAG has been found to be acceptable for the past three inspections. The inspections for concrete leaching and general housekeeping will continue as general visual examinations using standard preventative maintenance work orders to document the inspection during each refueling outage but will not be performed as Augmented Inspections under the ASME Section Xl IWE/IWL program.
PAGE 9 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT Augmented VT-1 inspection of the Tendon Access Gallery performed immediately prior to RF 20 by Quality Control and Design Engineering identified several areas of leaching and discoloration but with no or minor increase from the previous inspection during RF 19. The inspection included the 3 small active leaks observed during RF 19 and observed no change. Therefore, the condition of leaching that has been evaluated previously is unchanged and acceptable.
Only minor traces of grease seepage were observed coming across the gasket at a few tendon end caps. The quantity was insignificant and did not represent any degradation of the tendon corrosion protection system.
Summarizing, the Tendon Access Gallery area was found to be acceptable. Only the corrosion near tendon V-1 5 on the outer wall will remain on the list for Augmented Inspections.
6.2.2 IWL Reportable Conditions No reportable items or items indicative of abnormal degradation were identified by the IWL inspections for:
(1) Augmented Inspection of the Tendon Access Gallery.
6.2.3 IWL Reportable Conditions Requiring Augmented Inspections None.
PAGE 10 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT 7.0
SUMMARY
AND CONCLUSIONS The ASME Section XI IWE inspections performed for VCSNS during period October-November 2012 concurrent with RF 20 are the continuation of the ongoing required inspection of the containment structure. These inspections provide the necessary basis for comparison with future surveillance results.
All recordable indications identified as meeting or potentially exceeding acceptance criteria were evaluated by the Responsible Engineer and found to be acceptable with no impact on the capability of the Reactor Containment Building to meet its design functions.
Minor areas of groundwater inflow leakage and some concrete leaching formation that have been observed during previous inspections were identified during the IWL Augmented Inspection of the Tendon Access Gallery. The observed conditions were unchanged compared to the previous examination during RF 19. None of these observations impact the design function of the reinforced concrete structures. The Tendon Access Gallery will be reinspected during the next Augmented Inspection but only for the corrosion buildup on the outer TAG wall near tendon V-1 5.
The Augmented Inspection performed during RF 20 found the Moisture Barrier seal required some rework to restore it to required condition in a number of local areas. The condition was evaluated and reworked under NC/CR12-05160. The observations and reworked locations were typical and comparable to previous inspection observations identified by CRs in the past. The observations included local spots of debonding of the sealant from the steel liner or the concrete floor and minor low spots to be filled with sealant.
The following areas shall remain on the Augmented Inspection list:
Moisture Barrier Integrity Guard Pipe Containment Boundary at Auxiliary Building Elevation 397' Tendon Access Gallery Corrosion Each of the Augmented Inspection areas shall be inspected during each refueling outage (at approximately 18 month intervals) to ensure that any structural degradation should it occur during the period between inspections will be examined and evaluated.
The four leak chase zones 16, 25, 44, and 56 found during RF 19 with missing pressure test connection pipe plug closures had the pressure-drop tests repeated during RF 20 with essentially the same pressure-drops (insignificant) as previously found during testing in RF 19.The leak chase zones for 16, 25, 44, PAGE 11 of 12
CONTAINMENT INSERVICE INSPECTION - 2012 ASME SECTION XI, SUBSECTIONS IWE AND IWL RESPONSIBLE ENGINEER EVALUATION REPORT and 56 were dried out by vacuum pumping method. The pipe plug closures were reinstalled in the test connections. All 51 leak chase zone test boxes were cleaned, dried, inspected to ensure pipe plug properly installed and not loose.
The 51 boxes were then permanently repaired by filling completely with epoxy grout and permanently securing a new stainless steel plate cover over each box by epoxy bonding over the entire surface. No future IWE/IWL inspection of the repaired 51 leak chase zone pressure test connection junction boxes is required.
It is noted that the pressure test connections and junction boxes although inspected under the IWE/IWL program during RF-20 were outside of the boundary of ASME Section Xl IWE/IWL inspections.
PAGE 12 of 12
Document Control Desk RC-13-0026 Attachment VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INSERVICE INSPECTION REPORT #18 REFUEL 20 TAB D REPAIR & REPLACEMENT
SUMMARY
Repair Replacement, NIS-2 Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 Plant System Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Associated Component CSH-5055 CSH-5056 CSH-5057 CSH-5058 CSH-5059 CSH-5060 CSH-5061 CSH-5062 CSH-5063 CSH-5067 CSH-5068 CSH-5069 Pipe Pipe Pipe Attachment Pipe Attachment XVC-18529 XVG-18523 CSH-5012 Work Order 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1103681 1202798 PSI, NDE Required VT-3 VT-3 VT-3 VT-3 VT-3 Vr-3 VT-3 Vr-3 VT-3 VT-3 VT-3 VT-3 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 Description ofActivity Pipe support installation Pipe support installation Pipe support installation Pipe support installation Pipe support installation Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Pipe support installation Replaced Valve, Associated Piping Replaced Valve, Associated Piping Replaced Valve, Associated Piping Replaced Valve, Associated Piping Check valve and piping modification Pipe cap installation Added New Support to System Monday, March 04, 2013 Work orders retrievable through plant records system Page 1 of 5 Monday, March 04, 2013 Work orders retrievable through plant records system Page I of 5
Repair Replacement, NIS-2 Summary V. C. Summer Nuclear Station Interval I1I, Period 3, Outage 2 Refuel 20 Plant System Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Associated Component CSH-5057 CSH-5058 CSH-5067 CSH-5087 CSH-5088 CSH-5089 CSH-5090 CSH-5091 CSH-5092 CSH-5093 CSH-5094 CSH-5095 XPP-0230 Pipe Pipe Attachment Round Bar CSH-5070 CSH-5071 CSH-5072 PSI, NDE Required Work Order Description ofActivity I
1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202798 1202799 1202799 1202799 1203743 1203743 1203743 VTr-3 VT-3 VT-3 Vr-3 VT-3 VT-3 VT-3 V-17-3 V-17-3 V-17-3 V'I-3 VT-3 Material VT-2 VT-2 VT-2 VT-3 VT-3 VT-3 Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Skid Installation Replaced Valve, Associated Piping Replaced Valve, Associated Piping Replaced Valve, Associated Piping Added New Support to System Added New Support to System Added New Support to System Monday, March 04, 2013 Work orders retrievable through plant records system Page 2013 Monday, Marcli 04,2013 Work orders retrievable through plant records system Page 2 of 5
0 Repair Replacement, NIS-2 Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 Plant System Associated Component PSI, NDE Required Work Order Description of Activity Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chemical & Volume Control Chilled Water Chilled Water Chilled Water Chilled Water Chilled Water Emergency Feedwater Emergency Feedwater Emergency Feedwater CSH-5073 CSH-5074 CSH-5075 CSH-5076 CSH-5077 CSH-5078 CSH-5079 CSH-5080 CSH-5081 CSH-5082 CSH-5083 PIPE Pipe Fitting XVA-36361 B XVA-36362B XVA-36363B XVG-01037A-EF XVG-01037A-EF XVG-01037A-EF 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1203743 1105215 1105215 1105215 1105215 1105215 1016476 1016476 1016476 VT-3 v`r-3 vr-3 VT-3 VT-3 v`r-3 v-r-3 VT-3 VT-3 vr-3 vr-3 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 MT MT Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Added New Support to System Replaced Valve, Associated Piping Replaced Valve, Associated Piping Replaced Valve Replaced Valve Replaced Valve Stud and Nuts Replaced Replaced Piping Replaced Piping Monday, March 04, 2013 Work orders retrievable through plant records system Page3ofs Monday, March 04,2013 Work orders retrievahle through plant records system Page 3 of 5
0 Repair Replacement, NIS-2 Summary V. C. Summer Nuclear Station Interval III, Period 3, Outage 2 Refuel 20 Plant System Emergency Feedwater Emergency Feedwater Emergency Feedwater Emergency Feedwater Emergency Feedwater Emergency Feedwater Instrument Air Main Steam Main Steam Main Steam Main Steam Main Steam RBCU RBCU Reactor Coolant Reactor Coolant Reactor Coolant Reactor Coolant Reactor Coolant Associated Component XVG-01036 XVG-01036 IFV03531-EF IFV03541-EF IFV03541 -EF IFV03551-EF Pipe Fitting XVT-02869C IPV-02010-MS IPV-02010-MS IPV-02000-MS IPV02020-MS Pipe Drain Pipe Fitting XVT-08095B-RC XV--08096B-RC PCV00444C-RC PCV00444C-RC XRE-0001-52 PSI, NDE Required Work Order Description ofActivity 1106059 1106059 1108077 1108774 1108774 1108775 1200504 0613556 0906451 0906451 1101435 1101436 1106194 1106194 1201164 1201166 1211920 1211920 1212229 VT-2 VT-2 Vr-2 VT-2 VT-2 VT-2 VT-2 VT-1, V-17-2 VT-2 VT-2 VT-2 V-17-2 Material Material V-17-2 V-r-2 Vr-2 Vl-i PT/UT Valve Removed Valve Installed Plug/stem replaced Plug/Stem Assembly(Corrected)
Replaced Valve Internals Replaced Valve Internals Added New Component to System Replaced/Repaired Valve Internals Replaced Bolting Replaced Valve Internals Replaced Valve Internals Replaced Valve Internals Condensate Drain/RBCU modification Condensate Drain/RBCU modification Replaced Valve Internals Replaced Valve Internals Replaced Valve Internals Stud and Nuts Replaced Weld Overlay Repair Monday, March 04, 2013 Work orders retrievable through plant records system Page4ofs Monda.v, March 04, 2013 Work orders retrievable through plant records system Page 4 of 5
Repair Replacement, NIS-2 Summary V. C. Summer Nuclear Station Interval I11, Period 3, Outage 2 Refuel 20 Plant System Reactor Coolant Reactor Coolant Reactor Coolant Reactor Coolant Residual Heat Removal Service Water Service Water Service Water Service Water Service Water Service Water Service Water Service Water Service Water Service Water Service Water Service Water Associated Component XRE-0001-31 XRE-0001-37 XRE-0001-19 XDO-0002 XVR08708A-RH XVB03123B-SW Pipe Pipe Attachment XVB-031071B-SW XVB03123A-SW XVB03107B-SW XVB 03129D XVB 03129D Pipe SWH-1127 XVG-03172B XVG-03172B PSI, NDE Required Work Order Description ofActivity 1212232 1212233 1212234 1213354 1112173 0612909 0717731 0717731 1000223 1001316 1012749 1118145 1118145 1205196 1210387 1210387 1210387 PT/UT PT/UT PT/UT VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-2 VT-3 VT-2 MT Weld Overlay Repair Weld Overlay Repair Weld Overlay Repair Tube Cap Installed Replaced Valve Replaced Valve, Associated Bolting Replaced Valve, Associated Piping Replaced Valve, Associated Piping Replaced Valve Replaced Valve Replaced Valve Piping Replacement/(Corrected)
Piping Replacement/(Installed)
Added New Component to System PIPE STRAP REMOVAL AND REINSTALLATION PIPING REPLACEMENT PIPING REPLACEMENT Monday, March 04, 2013 Work orders retrievable through plant records system Page 5of5 Monday, March 04,2013 Work orders retrievable through plant records system Page 5 of 5
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- 1. Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVlLLE, SC 29065 Date 2/28/
Sheet 1
of Unit
- 1 13 2
Work Order 1103681/ECR50780 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No.. etc.
Type Code Symbol Stamp N/A Address Authorization No.
Expiration Date _
N/A N/A
- 4. Identification of System (CS) Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971 Edition.,
S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
Addenda.
N/A Code Case ASMIE National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Support Component Maintenance N/A N/A CSH-5067 N/A Installed No SupportComponent! Maintenance N/A N/A CSH-5069.
N/A Installed No Support Component! Maintenance N/A N/A CSH-5068 N/A Installed No Support Components Maintenance N/A N/A CSH-5055-N/A Installed No Support Components Maintenance N/A N/A CSH-50565 N/A Installed No Support Components Maintenance N/A N/A CSH-5057.
N/A Installed No Support Components Maintenanc.e N/A N/A CSH-5058.
N/A Installed No
- 7. Description of Work Added new component Supports Per ECR50780-ALT Seal Ini.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (
Exempt (
Other (VT 3
Pressure N/A psi Test Temp.
N/A 0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code., Section xM.
T y p e C o d e S y m b o l S t a m p
,.1 3 -'E Certificate of Authorization No.
xpiration Signed /-ý 17 A*
/'vI.,',4-r**
Date
_l_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by of HSBCT Hartford, Connecticut have inspected the components described in this Owner's Report during the period
-Se 1)
-,II Ti,3 to
,and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~laYOUý-(
Commissions
-)
I 2) 3 Inspector's Signature Date I
toL3 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet 1
of.
2 Unit
- 1 Work Order 1103681/ECR50780 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (CS) Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Y
Tear (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 Year (c) Applicable Section X1 Code Cases N/A
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Nameof Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No) oSupport Sumponents Maintenance N/A N/A CSH5060 N/A Installed No Support N/A N/A N/A Installed No Components Maintenance CSH5061 Support N/A N/A N/A Installed No Components Maintenance CSH5062 Support N/A N/A N/A Installed No Components Maintenance CSH5063 Support N/A N/A N/A Installed No Components Maintenance CSH5059
- 7. Description of Work Added new component Supnorts Per ECR50780.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure C Exempt (
Other (
VT3 Pressure.
N/A -psi Test Temp.
N/A °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
ype Code Symbol Stamp
/
I /I Certificate of Authorization No.
Expiration Date Signed
- 111, I
la (r.
Date 3 -
It' Dat0 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of of South Carolina and employed by HSBCT Hartford, Connecticut have inspected the components described in this Owner's Report during the period
- .-*T*
I
~-,,-F L Y-.,
to r
~ur I-'
~
,and state that I
to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
R"*65TAA'-l "V'OUIA
- Commissions Inspector's Signature Date
- 'o If
,5 131Qý SIC F (t National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet 1
of_
Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1103681/ECR50780 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (CS)Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME II1 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XG Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X0 Code Cases N,*
"I*6"2 *"'
3
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Borg 62832 N/A XVG1 851980 Installed Yes Warner
ý141N4 Valve Rockwell 04ABS N/A XVC18529.,
1974 Installed Yes Edwards Pipe Maintenance N/A N/A Alternate Seal N/A Installed No Injection Pipe Maintenance N/A N/A Alternate Seal N/A Installed No Attachment Injection
- 7. Description of Work Alternate Seal Injection pining Modification.
- 8. Tests Conducted: Hydrostatic (4C:
Pneumatic (
Nominal Operating Pressure (4) toll to f 3
, and state that to the best of my knowledge and belief, the Owne" has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
aooýT6A Cv~lkyo Ins etor's Signature Date JI 5 3 Commissionsn) 1Jý
~53c'
_<X WrL AVE-'.
National Board, State. Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- 01.
Owner SOUTH CAROLINA ELECTRIC AND GAS Date 2/12/13 iName COLUMBIA. SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVlLLE, SC 29065 Address Sheet Unit 1
of _
- 1 2
ECR50780/Work Order 1103681 Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed by SCE&G Type Code Symbol Stamp N/A Name COLUMBIA. SOUTH CAROLINA 29218 Address Authorization No.
N/A Expiration Date N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XG Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X1 Code Cases A *J41*-ZJ
- Addenda, N/A Code Case
- 6. Identification of Components:
ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Pipe Maintenance N/A N/A XPP-0230 N/A Installed No Pipe Maintenance N/A N/A XPP-0230 N/A Installed No Attachment Valve Borg Warner 62832 N/A XVG18523.
1980 Installed Yes
-t I
+
4-4-
+
'1' t
-t 1
1 t
-I-
.4.
S
.4.
4 4
1
.5.
- 7. Description of Work Added new Stem Per ECR50780C
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (xci Exempt (
Other (
Pressure N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8'/, in. x 11 in., (2) information in
.items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI 0
FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance Test performed on Work Order 1103891-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp 4
Certificate i_
Expiration Date Signed *
&,t
/,7A/,d7T Date
?A?__
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province 5nith Carnlina and emnloved hv of H-SBICT Hqartford Co"n-ntti-tt ha ve inspected the components of nf y inpectd te coponnts
~~t ha described in this Owner's Report during the period k 2
&2a to v
OV5
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
RMSTW 100 LA",
~~~o4 Commnisiotns N6J D9V530 Insp ctor's Signature Date b'])q JZcll National Board. State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI 9
wner SOUTH CAROLINA ELECTRIC AND GAS Date 2/12/13 Name COLUMBIA, SOUTH CAROLINA 29218 Address Plant V. C. SUMMER STATION Na-e P.O. BOX 88, JENKINSVILLE, SC 29065 Address Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Sheet 1
of _
Unit
- 1 3
ECR50780/Work Order 1202798 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
Expiration Date _
N/A N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section X) Utilized for Repair/Replacement Activity 1998 Y 5 ear
- Addenda, N/A Code Case (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
ASMIE National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Co nt '
Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Support Components Maintenance N/A N/A CSH-5094 N/A Installed No Support Components Maintenance N/A N/A CSH-5095 N/A Installed No Pump Clyde Union PM110306AN-1 N/A XPP0230 N/A Installed Yes Support Components Maintenance N/A N/A CSH-5057 N/A Installed No Support Components Maintenance N/A N/A CSH-5058 N/A Installed No Support Components Maintenance N/A N/A CSH-5067 N/A Installed No Support Component! Maintenance N/A N/A CSH-5012 N/A Installed NO
- 7. Description of Work Added new Stem Per ECR50780C
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (4C:
Exempt (
Other (..-
I-- -- 3 Pressure N/A psi Test Temp.
N/A 5F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81'2 in. x 11 in., (2) information in
- items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI wner SOUTH CAROLINA ELECTRIC AND GAS Date 2/12/13 Name COLUMBIA, SOUTH CAROLINA 29218 Address Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Sheet 2
of Unit
- 1 3
ECRSO78O/Work Order 1202798 Address SCE&G Name Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A
- 3. Work Performed by COLUMBIA, SOUTH CAROLINA 29218 Address Authorization No.
Expiration Date N/A N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XM Code Cases N/A
- Addenda, N/A Code Case
- 6. Identification of Components:
ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped nt Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No) upport Components Maintenance N/A N/A CSH-5087 N/A Installed No Support Components Maintenance N/A N/A CSH-5088 N/A Installed No Support Components Maintenance N/A N/A CSH-5089 N/A Installed No Support Components Maintenance N/A N/A CSH-5090 N/A Installed No Support Components Maintenance N/A N/A CSH-5091 N/A Installed No Support Components Maintenance N/A N/A CSH-5092 N/A Installed No Support Component Maintenance N/A N/A CSH-5093 N/A installed NO
- 7. Description of Work Added new Supports per ECR 50780
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (
Exempt (
Other ("./-r Pressure N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81A in. x 11 in., (2) information in G items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASMIE Code,Section XI.
ype Code Symbol Stamp Certificate of Authorization No. _Expiration Date Signed w
&In t
07 A /-/, -7 Date
_/_,_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and employed by of of HSBCT HartfordConnecticut described in this Owner's Report during the period state that r> Vcý T:i2ýk fG ",
have inspected the components 13
- and I
to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions~ Wý\\V Inspector's Signature Date U
)ta13-National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTMITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/12/13 Sheet 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Unit
- 1 Name P.O. BOX 88, JENKINSVILLE, Sc 29065 Address ECR5078OC/Work Order 1202799 Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed by SCE&G Name Type Code Symbol Stamp N/A COLUMBIA, SOUTH CAROLINA 29218 Address Authorization No.
N/A Expiration Date N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section X1 Utilized for Repair/Replacement Activity 1998 Addenda.
N/A Code Case r-WZ&I
-WO*
4 1 G -;L VIL4 (c) Applicable Section XM Code Cases
- 6. Identification of Components:
ASME National Corrected, Code W
Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Pipe Maintenance N/A N/A XPP-0230 N/A Installed No Pipe Maintenance N/A N/A XPP-0230 N/A Installed No Attachment Round Bar Maintenance N/A N/A XPP-0230 N/A Installed No I
- 4.
4 I
F
+
I
- 7. Description of Work Added new Stem Per ECR50780C
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X-S Exempt (
Other (
Pressure N/A psi Test Temp.
N/A
'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8'!A in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance Test performed on Work Order 1201155-049 and 053 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section A3.
Type Code Symbol Stamp.------__,
Certificate of Authorization
__Expiration Date Signed InO
,64
^4/1AT Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and emnloved bv of of HSBCT Hartford.Connecticut I
have inspected the components described in this Owner's Report during the period Sp Y_ a I I to t-'Q.,'
5
,and state that to the best of my knowledge and belief, the Ownerhas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions L) 6 1*
f
,ýý M (r AVT-Inspector's Signature Date
)oJ?4 National Board, State, Province, and' Endorsements Dat U3 Q
)
to1
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Namt COLUMBIA, SOUTH CAROLINA 29218 Address Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/12/13 Sheet Unit 1
of 3
- 1 ECR5078OC/Work Order 1203743 Address SCE&G Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A
- 3. Work Performed by Name COLUMBIA, SOUTH CAROLINA 29218 Address Authorization No.
Expiration Date _
N/A N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME Ill 1971 Year
- Edition, S 1973
- Addenda, N/A Code Case (b).Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XM Code Cases N/A
- 6. Identification of Components:
ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No) upport Components Maintenance N/A N/A CSH-5070 N/A Installed No Support Components Maintenance N/A N/A CSH-5071 N/A Installed No Support Components Maintenance N/A N/A CSH-5072 N/A Installed No Support Components Maintenance N/A N/A CSH-5073 N/A Installed No Support Components Maintenance N/A N/A CSH-5074 N/A Installed No Support Components Maintenance N/A N/A CSH-5075 N/A Installed No Support Component Maintenance N/A N/A CSH-5076 N/A Installed NO
- 7. Description of Work Added new Supports per. ECR50780C
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (
Exempt (
Other ('\\,i1-3 Pressure N/A
.psi Test Temp.
N/A 0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81'/ in. x II in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- wner SOUTH CAROLINA ELECTRIC AND GAS Date 2/12/13 iName COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Sheet Unit 2
of 3
- 1 ECR5O78OC/Work Order 1203743 Address SCE&G Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A
- 3. Work Performed by iNamne COLUMBIA. SOUTH CAROLINA 29218 Address Authorization No.
Expiration Date N/A
'N/A
- 4. Identification of System Chemical And Volume Control
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 YearM
- Addenda, N/A Code Case (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No) upport Components Maintenance N/A N/A CSH-5077 N/A Installed No upport Components Maintenance N/A N/A CSH-5078 N/A Installed No Support Components Maintenance N/A N/A CSH-5079 N/A Installed No Support Components Maintenance N/A N/A CSH-5080 N/A Installed No Support Components Maintenance N/A N/A CSH-5081 N/A Installed No Support Components Maintenance N/A N/A CSH-5082 N/A Installed No Support Componenv Maintenance N/A N/A CSH-5083 N/A Installed NO
- 7. Description of Work Added new Supports per. ECR50780C
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (
Exempt (
Other (/'%-r-n-3 Pressure N/A psi Test Temp.
N/A 0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8'/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XM.
ype Code Symbol Stamp Certificate of AuthorizifNo.
Expiration Date Signed *nf "7-it I
,,n O 7 Date SA T_-_/,__'__
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and employed by of of UQM_1r u__Ir_,A (_
of hae inpectd thecompnent described in this Owner's Report during the period state that S'P*,
90*.i!
to
ýFe Yb)
Is
, and to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
e( ý4 o5'"
Commissions t5 1 151,.0
<; C U L(
Inspector's Signature National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065
- 1 Work Order 1105215/ECR50585J Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (VU) Chilled Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section )( Utilized for Repair/Replacement Activity 1998 (c) Applicable Section )( Code Cases *A N41&.2
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Identification Year Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Flowserve L7304-1 -1 N-1 562 XVA36361 B 1974 Installed Yes Valve Flowserve L7304-1-2 N-1562 XVA36362B 1974 Installed Yes "B" Chiller Pipe Maintenance N/A N/A Bypass N/A Installed No Modification "B" Chiller Pipe Maintenance N/A N/A Bypass N/A Installed No Fittings Modification Valve Flowserve L7304-1-3 N-1 562 XVA36363B 1974 Installed Yes 7.
8.
Description of Work Installed pipe and valves for "B" Chiller Bypass.
Tests Conducted:
Pneumatic (
Nominal Operating Pressure 4C>
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Leak Test Work order 1105125-023 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed /1",,.?
?".
MaJ,' ^ 4,
M r
Date 3-__/.2-,0_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I* /
HSBCT C-grJýL C-Zýý CJIICtýA 4
and employed by have inspected the components described of in this Owner's Report during the period to YX0 and state that to the best of my knowledge and belief., the Ownr has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions U ;
)2"o Inspector's Signature Date V)31 J Q t1-6 3
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As ReqUired by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit 1
Address
- 2. Plant V. C. SUMMER STATION 1of
- 1 2
Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1016476/ECR50695 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (EF) Emergency Feed & (SW) Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section )I Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases -*
N°+" &-,2
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Pipe Maintenance N/A N/A XVG1037A-EF N/A Installed No Pipe Maintenance N/A N/A XVG1037A-EF N/A Installed No Fittings Studs Maintenance N/A N/A XVG1037A-EF N/A Installed No Nuts
- 7. Description of Work Service Water "A" Train (EFW) system Flow control Enhancements.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure ()C>
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A 0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI I
FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testino on Work Order 1016476-014 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed A/V'/I '.6ZV..,
{/'*,'
/;r'i, r,
Date
.1-.2o/
Owner or Owner's Designee, Title CERTIFICATE OF INSERV'ICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
I and employed by of HSBCT 15&
- VAGL, F0 (AAA0-A.
C V-.
A have inspected the components described in this Owner's Report during the period
_to ZQ 0 and state that to the best of my knowledge and belief, the Ow er has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
@1ofl(W
- avzý,^
Commissions W
A 3**3a
'C26c It '
W Inspector's Signature Date (5310
__0 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
.Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Date 2/28/13 Sheet 1
of.
Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1106059 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (EF) Emergency Feed
- 5. (a) Applicable Construction Code ASME III 1971 Edition.
S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998
-ear (c) Applicable Section XI Code Cases N-416-2
- 6. Identification of Components:
Addenda.
N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Anchor E-6188-45-9 N/A XVG-01036 N/A Removed YES Darling Valve Flowserve BM542 N1562 XVG-01036 1974 Installed YES
- 7. Description of Work Valve Replacement
- 8. Tests Conducted:
Pneumatic C Nominal Operating Pressure 4X Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1201697-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed
ý
,~
/
0£ý 4i #**e,.
Date 3
/ -O
/
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina
_________,____and employed by of HSBCT d& Krl/.
(QwDE&,
I7 have inspected the components described in this Owner's Report during the period I? I J!
to X
( S, and state that to the best of my knowledge and belief, the Own r has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Inspector's Signature Date o
0o Commissions WJi a RO 5
266 N ýJl National Board, State, Province', and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI SJ wner SOUTH CAROLINA ELECTRIC AND GAS COLUMBIA, SOUTH CAROLINA 29218 Date 2/28/13 Sheet 1
of_
Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1108774 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (EF) Emergency Feed
- 5. (a) Applicable Construction Code ASME 111 1971
- Edition, S 1 973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 Ye-w (c) Applicable Section Xl Code Cases N/A
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
- sug/Stem Fisher N/A N/A I1FV03541 -EF N/A Corrected No S
+
S I
+/-
1-
- 7. Description of Work Reolaced Valve Internals
- 8. Tests Conducted: Hydrostatic (
Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
Pressure. N/Apsi Test Temp.
N/A F
NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI I
FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1110298-002 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed o7 WW 1
/y("-
Date 3-1-4",___
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Rnlah Carnlina and employed by of H'zBr-r
_ý 14AMrnQ6 rC)tUUZr,-TF1CVr have inspected the components described in this Owner's Report during the period o I I to f
Iand state that to the best of my knowledge and belief, the Owner hAs performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XU.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
&Aon-Af' FkYoc4A 2,19
ýc 'e-6tt Commissions Ins tors Signature Date (bO__
1__
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- Owner SOUTH CAROLINA ELECTRIC AND GAS COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit "1
9 Addres
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065
- 1 Work Order 1108775 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (EF) Emergency Feed
- 5. (a) Applicable Construction Code ASME III 1971 Edition.
S 1 973
- Addenda, N/A Code Case (b) Applicable Edition of Section XG Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XG Code Cases N/A
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
AlugStem Fisher N/A N/A IFV03551-EF N/A Corrected No
- 7. Description of Work Replaced Valve Intemals 8.. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (4C Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A TF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/A in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1110276-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section Ml.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A
-Expiration Date N/A Signed
'"','?"*
?"'
(7'44,
/In!t-Date 3"
-2"P-/?
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
I I/
and employed by of HSBCT bA v
, CL c
(*A..CLC*ZJ/
have inspected the components described in this Owner's Report during the period Sc.
DY-to
?Q*b
"*t")
and state that to the best of my knowledgeand belief, the Owier has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Qý05Tft\\% 1ByK0L4\\
Commissions
$J'
\\-3ýo
- YC A 1i AN)r Inspector's Signature Date D*3IIO0126i3 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet I Init 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1108077 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (EF) Emergency Feed
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XM Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XG Code Cases N/A
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped amponn Manufacturer No.
Board No.
Installed (Yes/No)
AIgStesy.
Fisher N/A N/A IFV03531-EF N/A Corrected No t
t
+
F F
F
+
+
+
+
I F
I 4-I
- 7. Description of Work - -FAL ST
-SJME A
S*
L
/4-
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 V2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1110276-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed
/n W
i-**6
}*
b i
'4I'
/-'e Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by of HSBCT
'k,-
C C
have inspected the components described in this Owner's Report during the period 2
to
) 3 and state that to the best of my knowledge and belief, the Owner hA performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
pk tA~fT R ou?-i Commissions w
1ý i ý1 ýo C & t Au r-
- 1w
- I I W-
- v w
- Injector's Signature Date National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code, Section X-
- Owner SOUTH CAROLINA ELECTRIC AND GAS COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet 1
of Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 1200504/ECR50768B Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (IA) Instrument Air
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XM Code Cases N-416-2
- 6. Identification of Components:
Name of Name of Manufacturer Serial National O
Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Other Identification Year Built Installed (Yes/No)
Pipe Fitting Maintenance N/A N/A ECR50768B N/A Installed No w
Sketch M-14
- 7. Description of Work Added new component to system
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (><
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8 2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance test performed on Work Order 1200504-114 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify' that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed r-Vi
( -M
(' 7 5r Date
-3 2 "
?
.7 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province Smonth Carolina and emnloverd hv of I-IRCT
(%~lAPC Lir~4~L~
have inspected the components described of
-------..B--C--
in this Owner's Report during the period
- e f) 2 1
to and state that to the best of my knowledge and belief, the Owner has lerformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
QOT-ic C-\\V uL4L Commissions P-b
_*i)?I
.C( &L/t(
Inspector's Signature Date J% 13 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address Plant V. C. SUMMER STATION NaPO Be P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet 1
of _
Unit
- 1 2
Work Order 0613556 Address SCE&G Repair/Replacement Organization P.O. No, Job No., etc.
Type Code Symbol Stamp N/A
- 3. Work Performed by Name COLUMBIA, SOUTH CAROLINA 29218 Address Authorization No.
Expiration Date _
N/A N/A
- 4. Identification of System
-wpeteWtr t
ST Af(\\
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 Year (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
I ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Disc Maintenance N/A N/A XVT-02869C-MS N/A Installed No
[
I I _____
I I ______
I ___
I I
F
+
I
~t
.t I
I
.1.
.1.
.5.
- 7. Description of Work Added new Disc to Valve XVT-02869C-MS
- 8. Tests Conducted:
Hydrostatic (4 Pneumatic (
Nominal Operating Pressure (*
Exempt (4 Other (
Pressure N/A psi Test Temp.
N/A 5F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/, in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance test performed on Work Order 1111471-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XM.
Type Code Symbol Stamp Certificate of Authorization No.
/"
Expiration Date V/I A Signed
,/,,.
Zý4,-
('-
A1A*,'
/01lt,-
Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by of HSBCT Hartford, Connecticut A
have inspected the components described in this Owner's Report during the period -*) !;t.,,X0 i)
),
t to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
'e"S A
Commissions SCA 4~L AeJT Inspector's Signature Date 0310 *o 13 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- 1. Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Date 2/12/13 Sheet 1
of Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 0906451 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Address Authorization No.
Expiration Date _
N/A N/A
- 4. Identification of System Main Steam
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 Year (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
Addenda.
N/A Code Case ASME National Corrected, Code I1 Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Valve Fisher N/A N/A IPVO2010-MS N/A Corrected No Nut Maintenance N/A N/A IPV02010-MS N/A Installed No All Thread Rod Maintenance N/A N/A IPV02010-MS N/A Installed No
- 7. Description of Work Added new Plug/Stem Assy.
- 8. Tests Conducted: Hydrostatic (
Pneumatic (
Nominal Operating Pressure (x Exempt (
Other (
Pressure N/A psi Test Temp.
N/A
'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top A
of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance Test performed on Work Order 10 11388-005 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code: Section X).
Type Code Symbol Stamp _
Certificate of Authorizati Expiration Date Signed
(.16,e fl4 t1'*"
Date
/______..7_,
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and employed by of of HSBCT HartfordConnecticut h
i have inspected the components described in this Owner's Report during the period
-so(>
ki state that to i 6O1 and
.f-I to the best of my knowledge and belief. the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or properly damage or a loss of any kind arising from or connected with this inspection.
QAo3Th
~Jao&
Commissions US 13SýO Inspector's Signature Date
)06 National Board, State. Province, and Endorsements I I
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI awner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Address
- 2. Plant V. C. SUMMER STATION Sheet 1
of 2
Unit
- 1 Work Order 1101435 Name P.O. BOX 88, JENKINSVILLE, SC 29065 Address Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Auth Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A orization No.
N/A Expiration Date N/A
- 4. Identification of System (MS) Main Steam
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No) lug/Stem Fisher SER. 784 N/A IPV02000-MS N/A Corrected No Assy.
Fihr2A-1
- 7. Description of Work PluW/Stem Assembly Replaced
- 8. Tests Conducted:
Hydrostatic (o Pneumatic (
Nominal Operating Pressure (C>
Exempt (4 Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/, in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1111471-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XM.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed
,?6A
- !2,*4
/t J
'f'-"'i"
,/
Date 3"/
".2"3 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
I r I,
and employed by of HSBCT
,-/
L, 0C s
r, i
have inspected the components described in this Owner's Report during the period S
.R
- Y-
\\
to 4o-) J1 t3 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
1_2_*_s___
kY_
o Commissions t
\\ý'1 ec
,6 I
ins ector's Signature National Board, State, Province, and Endorsements Date __
__i_
__F,_.l,-
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet 1
of _
Unit
- 1 2
Work Order 1101436 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (MS) Main Steam
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section X) Utilized for Repair/Replacement Activity 1998
-'ear (c) Applicable Section '3 Code Cases N/A
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component -*
ý Manufacturer No.
Board No.
Installed (Yes/No) ilot Plug Fisher R0303112 NR87 IPV02020-MS N/A Corrected No W Assy.
1A
- 7. Description of Work 'RZPLAC.Ž_
VAL'I-_
Epj-T*,kAL.-,tCvI3
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X Exempt (4 Other (
Pressure.
N/A psi Test Temp.
N/A
-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8'/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1111471-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE F
I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section MI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed V/"J), A-
'r 1-*' 4 rt*".
Date 3-/
.20/3 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province SouIth C.arlin.
I a and emnlnved hv of of HSBC tnc W VhVIoE tiDroxv have inspected the components described in this Owner's Report during the period
¶21 Q\\'
7 U
to Q--L-,
)_O1 3
,and state that to the best of my knowledge and belief, the Owner hls performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
OW~
~1 1
"6 VIOAA Commissions N R
( K45qw A-yr Inspector's Signature Date I !
13 National Board. State. Province. and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
¶. Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28113 Sheet Unit 1
of 2
Work Order 1106194/ECR50756 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RD) RBCU Drain
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X0 Code Cases +4AW-t"'
0 t
5/c*/i;
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Other Identification Year Built CorceRmedr AMEoeStpd Component Manufacturer No.
Board No.
Installed (Yes/No)
~Condensate Pipe Maintenance N/A N/A Drain N/A Installed No Modification Condensate Pipe Maintenance N/A N/A Drain N/A Installed No Fittings Maintenance Modification
- 7. Description of Work Installed access port for A and B train 6"RBCU condensate drain line.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure 4C4 Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Leak Test exempted per IWA-5222.g of ASME X0 "PT" required for root pass and final welds ASME Class-3 welds.
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XM.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed -z4,
,W'l
/0 1,
(,
/'A"/t4, f
Date 3
-/
/
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
i i
and employed by of HSBCT o0 i' i CQ.,A C_ U C4t V have inspected the components described in this Owner's Report during the period _
_ P_"-_I I to 4
')
i3 and state that to the best of my knowledge and belief, the Owner has Ierformed examinations and taken corrective measures described in this Owner's Report i accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
CR ýios,,-ý I&Y6 L,(k Commissions C*
f5o 2S
?I 4Q A)"L In pector's Signature Date 2oj3 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
.Owner SOUTH CAROLINA ELECTRIC AND GAS COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065
- 1 Work Order 1201164 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XM Code Cases N/A
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Kit,trim Copes N/A N/A XVT08095B-RC N/A Installed No Assembly Vulcan
+
1-t t
t t
- 7. Description of Work Replaced Valve Internals
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance test performed on Work Order 1110081-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section X).
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed/?
(T
- d
.*ie9 "f",
jAt T
/" a /t -
Date 3 I-,Zo/l3 Owner or Owner's Designee, Title CERTIFICATE OF INSERV]CE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina A
I and employed by of HSBCT b0 (1A11E.(-e L A
have inspected the components described in this Owner's Report during the period 2_
(I to Al
&I
, and state that to the best of my knowledge and belief, the Owner has Ilerformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Plt6Y31* a*va U Commissions N1*
5
- ýo Avr-Inspector's Signature Date
,oo National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- 1. Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet Unit I
of 2
Work Order 1201166 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XG Code Cases N/A
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Trim Copes N/A N/A XVT08096B-RC N/A Corrected No Kit Vulcan
+
+
4 4
i
- 7. Description of Work Replaced trim kit on valve XVT08096B-RC due to leaking past seat,
- 8. Tests Conducted: Hydrostatic (
Pneumatic (
Nominal Operating Pressure (C Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Leak Test on Work Order 1110086-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed/"',Af'
",J2.L 6 r A/,'
' //J7 n
Cr
-Date 3'J
-2o /? -,
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
I I
and employed by of HSBCT 0,
ký"
V-C4
- tAvx e--/
Lk 6, F have inspected the components described in this Owner's Report during the period "QD Y
\\
1 to
, and state that to the best of my knowledge and belief, the Owne" has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
GL T*'
)*:e']
4[ U< V\\
Co m m issions VV 0- )
E" o-d94, A.) k Inspector's Signature National Board, State, Province, and Endorsements Date CA I
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
.wner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet
- of _
Unit
- 1 2
Work Order 1211920 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME II1 1971
- Edition, S 1973
'ear (b) Applicable Edition of Section X] Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Vsalve p
sembly Fisher N/A N/A PCV00444C-RC N/A Corrected No
-ee Ball Stud Maintenance N/A N/A PCV00444C-RC N/A Corrected No Nut
+
I.
- l
-1 I
- 7. Description of Work Replaced Valve Intemals, Studs and Nuts
- 8. Tests Conducted:
Hydrostatic C Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8/
in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: LeakTest Work order 1110081-001 and 1211920-004 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed /Z 1
P
",*-- ?'p"
,/jr' Date
/
o Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina I
J I
and employed by of HSBCT i'4,v2
('X-I( W L-V have inspected the components described in this Owner's Report during the period Se to
,RtJ
_M5 and state that to the best of my knowledge and belief, the Owner ha) performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Eko-
{V layn V9-D 4
Commissions P
G5`)
5C W(
AVyr lnspcetor's Signature National Board, State, Province, and Endorsements Date
- o* 0
- , I___
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- o.
owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Date 2/28/13 Sheet Unit 1
of 2
- 1 Name P.O. BOX 88, JENKINSVILLE, SC 29065 ECR50846 /Work Order 1212229-001 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases 729-1
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Corrected, Removed or ASME Code Stamped Other Identification Year Built Cretd tmvdo SECd tme Component Manufacturer No.
Board No.
OtherIdentifiction JYearBuiltInstalled (Yes/No)
PRWelcd epair CBI T39 N/A XRE-0001 N/A Corrected No 4
4 4
4 1
4 4
4 4
4 4
4 4
4 4-4 4
4 4
4
8-Tests Conducted:
Pneumatic (
Nominal Operating Pressure (<>
Exempt (
Other ( PT/UT Pressure.
N/A psi Test Temp.
N/A *F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
J FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance leakage test performed on Work Order 1112301-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No.
--,N/A Expiration Date N/A Signed __
Date _
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by of HSBCT 6 f $vf 1U
- w c
' t.'c L C1 have inspected the components described in this Owner's Report during the period -
--Sp to F"6 q0 1
, and state that to the best of my knowledge and belief, the Owner h performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissio~ns N\\J 6 I33 Sr ?66 4117-Ij!T Inspector's Signature Date In, National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI 01 Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet 1
of _
Unit
- 1 2
ECR50846 /Work Order 1212232-001 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME II1 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1 998 (c) Applicable Section XI Code Cases 729-1
- 6. Identification of Components:
Addenda.
N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
SWeld Repair CBI T39 N/A XRE-0001 N/A Corrected No
- 7. Description of Work Weld repair on Reactor Vessel upper head penetration ID#3] per ECR 50846.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
PT/UT Pressure.
N/A psi Test Temp.
N/ATF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance leakage test oerforrned on Work Order 1112301-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section XU.
Code Symbol Stamp N/A Certificate oNo Expiration Date N/A Signed Date ___
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION L, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by of HSBCT
(
klc" 'Aoll have inspected the components described in this Owner's Report during the period_ _
to
- L 1,0/
and state that to the best of my knowledge and belief, the Owner as performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XG By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
fi-m m/o(A, Commissions AV3 t31 o
5CF k 4-Inspector's Signature National Board, State, Province, and Endorsements Date
)-
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit 1
nf 2
Address
- 2. Plant V. C. SUMMER STATION
- 1 Name P.O. BOX 88, JENKINSVILLE, SC 29065 ECR50846 /Work Order 1212233-001 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases 729-1
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Identification Year Bul Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Weld CBI T39 N/A XRE-0001 N/A Corrected No Repair
- 7. Description of Work Weld repair on Reactor Vessel upper head penetration ID#37 per ECR 50846.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (<>
Exempt (
Other (PT/UT Pressure.
N/A psi Test Temp.
N/A"F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance leakage test performed on Work Order 1112301-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No N/A Expiration Date N/ A Signed -
Date 3
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province I.nuth tsrnliria
,and er-lnIn.A hu of of I
k, -. 1
.7 HSBCT have inspected the components described 0
A
,-..I fl in this Owner's Report during the period 2e ('* 10 1 to
_-r'ka -W.1
)
, and state that to the best of my knowledge and belief, the Ownerlhas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
n-r"T/-w in vovýk Commissions ti & I 3'2 SryC2 G AV r Inspector's Signature Date (3)?t1 24,~3~
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Date 2/28/13 Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Address Sheet 1
nf 2
Unit
- 1 ECR50846 /Work Order 1212234-001 RepairlReplacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Authorization No.
N/A Address Expiration Date N/A
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971 Year
- Edition, S 1 973
- Addenda, N/A Code Case (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X1 Code Cases 729-1
- 6. Identification of Components:
Component Manufacturer No.
Board No.
Installed (Yes/No)
Weld Repair CBI T39 N/A XRE-0001 N/A Corrected No
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (<>
Exempt (
Other ( PT/LUT Pressure.
N/A psi Test Temp.
N/A °F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/
in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance leakage test performed on Work Order 1112301-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A iration Date N/A Signed _
Date _
_P1_1112 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina T4~rtC'T n-C PaVtJ1;,A 6c>ýVeh t:J;;7 and employed by have inspected the components described of H-,RrT in this Owner's Report during the period SQ
_ e ol' to 4
0 3
, and state that to the best of my knowledge and belief, the Ownedhas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
(a~tf4ThA ayou(24 Commissions N63 r~-1
-SC ?ýZ fAJT___
Inspector's Signature Date P3 n~ikl Y.-
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Date 2/28/13 Sheet 1
of 2
Unit
- 1 Work Order 1213354 Name P.O. BOX 88, JENKINSVILLE, SC 29065 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RC) Reactor Coolant
- 5. (a) Applicable Construction Code ASME III 1971 Edition.,
S 1973 Year (b) Applicable Edition of Section X1 Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X1 Code Cases-NR tJ 4:V -13
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No) ube Cap Maintenance N/A N/A XDO-0002 N/A Installed No
- 7. Description of Work Installed Swagelok Caps at seal table locations A-9 and F-13
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (.
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section Xl.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A
-Expiration Date N/A Signed /t1A./
ý,J0 br fJ4,A,'/0(
Date 1'/[-..*/3 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina 4
and employed by of HSBCT Ot 4P OaA(AAV3A 0IA CX V
have inspected the components described in this Owner's Report during the period _
_ 40k_
__l to to15 and state that to the best of my knowledge and belief, the Owner hU* performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
qt6fA W
a~l a.
Commissions 05 13530 Isr? 9g(
Inspector's Signature Date _____
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet 1
of Unit
- 1 2
Work Order 1112173 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (RH) Residual Heat Removal
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973 Addenda.,
N/A Code Case year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section M Code Cases 4N4 2
- 6. Identification of Components:
Name of Name of Manufacturer Serial National Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Maintenance N56904 N/A XVR08708A-RH N/A Removed YES 0046 Valve Flow Serve N56904 N/A XVRO8708A-RH N/A Installed YES 0002
- 7. Description of Work Valve Replacement
- 8. Tests Conducted:
Hydrostatic (4 Pneumatic (4 Nominal Operating Pressure (<
Exempt (4 Other (
Pressure. N/A psi Test Temp.
N/A 0F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 8V/2 in. x II in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1109977-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed /,,ýZ/
L'O-j7Ze",6" 41 h o'-'-
/'h b
K"'
Date 3-. / "2-3 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province Snuth arolin I
and ermnlo-ved by of Al'
' I A
14' ni-T
,n"Pcf. V have inspected the components described of tZ>'i i~L~
in this Owner's Report during the period I
to 4,
X 3
and state that to the best of my knowledge and belief, the Owner h6s performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code.Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~R4A6cs EIAV04A
-Commissions _________k sc MU( 4j Inspector's Signature Date 631t 0 Zo National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI owner SOUTH CAROLINA ELECTRIC AND GAS Date 2/28/13 Name COLUMBIA, SOUTH CAROLINA 29218 Sheet 1
of 2
Address
- 2. Plant V.C. SUMMER STATION Unit
- 1 N1ame P.O. BOX 88, JENKINSVILLE, SC 29065 Work Order 0612909 Address Repair/Replacement Organization PO No, Job No., etc.
- 3. Work Performed by SCE&G Type Code Symbol Stamp N/A Name COLUMBIA, SOUTH CAROLINA 29218 Authorization No.
N/A Address Expiration Date N/A
- 4. Identification of System Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
1 i
- 1 1
7 Name of Component Name of Manufacturer-Manufacturer
..r-il N,.
National Board Year Corrected, Removed, or ASME Code Stamped U..,.
Uther Iuenuticanon Built I
Installed I
(Yes or No)
Valve Valve Henry Pratt Henry Pratt D-0092-7-4 923565DD-1-1 N/A N/A XVB-3123B XVB-3123B 1974 1974 Bolting Bolting I Maintenance Maintenance N/A N/A N/A N/A
-t 4-1
.1 XVB-3123B N/A N/A Removed Installed Removed Installed Yes Yes No No A. ______
L ______!.
j ________
I ___
I ______
I _____
- 7. Description of Work AJJý 4 ý-q~V~v V~ CM
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X>
Exempt (
Other (
Pressure....
N/A psi Test Temp.
N/A
-F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top
'of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI 0
FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance test performed on Work Order 1111471-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section X1.
Type Code Symbol Stamp
/ (/
Certificate of Authorization No.
-/'
IA'Expiration Date v ),4 Signed *,,7 r/ 0
-74*-IO,4-1h' t4 Date _
___.___/__7 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and employed by of of NqR("T 14nrtfard i°nnn@t'lie))!
I have inspected the HSBCT~ ~
~ Hatfr Conciu components described in this Owner's Report during the period
'tCZ)Z to
,Q_-6 YOI.0 and state that To the best of my knowledge and belief, the Owner has performed examirations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
mic5i-v* ý)-yo U%
U 6 )55 3; Commissions Inspector's Signature Date e
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
. Owner SOUTH CAROLINA ELECTRIC AND GAS COLUMBIA. SOUTH CAROLINA 29218 Date 2/12/13 Sheet 1
of _
Unit
- 1 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, Sc 29065 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 ECR 50585/Work Order 0717731 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Address Authorization No.
Expiration Date N/A N/A
- 4. Identification of System Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973
- Addenda, N/A Code Case Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section X0 Code Cases 4-11t,- -*1/(/,
- 6. Identification of Components:
ASME National Corrected, Code Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Pipe Maintenance N/A N/A XVA-13147 N/A Removed No Pipe Maintenance N/A N/A XVA-13147 N/A Installed No Pipe Maintenance N/A N/A XVA-13147 N/A Installed No Attachment
- 7. Description of Work Added new component per ECR50585B
- 8. Tests Conducted:
Pneumatic (o Nominal Operating Pressure (C:
Exempt (4 Other (
Pressure N/A psi Test Temp.
N/A
'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may'be used, provided (1) size is 8 /A in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions ofthe ASME Code,Section XI I
FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance Test performed on Work Order 1011388-005 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp Certificate of Authorizatio
__o.
Expiration Date Signed *
-&A In,4 /,J7, ate a/7*
_T-_7
-Datet_
//_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and emnloved bv of of HSBCT Hartford Connecticut hv n
have inspected the components described in this Owner's Report during the period se 0a to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~oS~f4'
~Wall Commissions NJ Au -
Inspector's Signature Date tLLW kL.
National Board, State, Province, and Endorsements I,
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI 9 Owner SOUTH CAROLINA ELECTRIC AND GAS 2.
Name COLUMBIA, SOUTH CAROLINA 29218 Address Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet of Unit
- 1 2
Work Order 1000223 Address
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System (SW) Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1 973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:.
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Flow Serve BG749 N/A XVB03107B-SW N/A Removed YES Valve Flow Serve BA328 N/A XVB03107B-SW 1974 Installed YES
- 7. Description of Work Valve Replacement
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (.
Exempt (
Other C Pressure. N/A psi Test Temp.
N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form,
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1000223-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section X).
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed - /ý1,7 4W
/ý4,,-
I Date 3?
/.-"/_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina A
t and employed by of HSBCT O
- Xa'fI'O (1VLA eCL.,uV-have inspected the components described in this Owner's Report during the period SE!
- I to ]
ial
,and state that to the best of my knowledge and belief, the Owner has rderformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section X).
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~aonMA GYc i Comssos k)~ 6.q?
AtT Inspector's
-:*ignature Date
- 2)lOq
! *1*
Inspector's ~ignature Date
__K--_____
National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- wner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date Sheet I mnif 2/28/13 1
of _
- 9/1 2
Work Order 1001316 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (SW) Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XG Utilized for Repair/Replacement Activity 1998 (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Valve Maintenance N/A N/A XVB03123A-SW N/A Removed YES Valve Henry NXL 1100 N1030 XVB03123A-SW 1974 Installed YES Pratt
- 7. Description of Work Valve Replacement
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (>
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (I) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post Maintenance Testing on Work Order 1109861-001 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section X0.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed V 0 (O
'- /hci,"#.
Date _
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina 8'
and employed by of HSBCT VDV&
NAW CO(AA A*C
_V have inspected the components described in this Owner's Report during the period J'
4.)
to tQ1
,ý Z 3
and state that to the best of my knowledge and belief, the Ow er has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
c- "*fY V
- O'A'\\
/\\-)3" Inspector's Signature National Board, State, Province, and Endorsements Date
__--_____ri
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI
- 1. Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA, SOUTH CAROLINA 29218 Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Date 2/28/13 Sheet I mni 1
of 2
Work Order 1118145 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O. No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (SW) service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998 Yewr (c) Applicable Section XM Code Cases MW A"l2-,,(p
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Bult Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yes/No)
Pipe Maintenance N/A N/A XVB-03129D N/A Corrected No Pipe Maintenance N/A N/A XVB-03129D N/A Installed No Fittings
- 7. Description of Work Replacement due to nin wall concerns.
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (<>
Exempt (
Other (
Pressure.
N/A psi Test Temp.
N/A oF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x I1 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Leak Test (VT-2) on Work Order 1118145-020 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code, Section X1.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed Z
^
&c-Mg*
- S',
-tA rC',
Date
_--_/_-_._.,__/_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina *and employed by of HSBCT e
1A L-tkL-4&L/
have inspected the components described in this Owner's Report during the period s
?
t>
l I to 3
,and state that to the best of my knowledge and belief, the Owner hal performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XM.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
QHCOW RV-n LAA Commissions K) 9 k5qr;D
<;Z U U Inspector's Signature Date 036
-1 National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/12/13 Sheet 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065 Address Unit Work Order 1205196-004 Repair/Replacement Organization P.O. No., Job No., etc.
- 3. Work Performed by SCE&G Name COLUMBIA, SOUTH CAROLINA 29218 Address Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A
- 4. Identification of System Service Water
- 5. (a) Applicable Construction Code ASME Ill 1971
- Edition, S 1 973 year (b) Applicable Edition of Section XG Utilized for Repair/Replacement Activity 1998 yearV=
- Addenda, N/A Code Case (c) Applicable Section XI Code Cases N/A
- 6. Identification of Components:
ASME National Corrected, Code S
Name of Name of Manufacturer Board Year Removed, or Stamped Component Manufacturer Serial No.
No.
Other Identification Built Installed (Yes or No)
Pipe Maintenance N/A N/A XVG-03181B N/A Removed No Pipe Maintenance N/A N/A XVG-03181B N/A Installed No I
F 1-1 1
t t
- 7. Description of Work Added new component per NC-12-01836
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (X Exempt (
Other (
Pressure N/A psi Test Temp.
N/A
'F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/, in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks:
Post Maintenance Test performed on Work Order 1205196-008 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section XI.
Type Code Symbol Stamp Certificate of Authorizatiqn~rY _Expiration Date Signed A
Q(wý A-o 4 "A 1,,17-Date Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carolina and employed by of of HSBCT Hartd described in this Owner's Report during the period state that
'rdLConnecticut
-. I
<.-, ID 7'r, I I t.4 1 C 1~~3 have inspected the components
,and
)
to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
"AcSTHAf LWO
ý OAA Commissions V
k 2 &3)
S'1 Inspector's Signature Date ko I S National Board, State, Province, and Endorsements
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI Owner SOUTH CAROLINA ELECTRIC AND GAS Name COLUMBIA. SOUTH CAROLINA 29218 Date 2/28/13 Sheet Unit 1
of 2
Address
- 2. Plant V. C. SUMMER STATION Name P.O. BOX 88, JENKINSVILLE, SC 29065
- 1 Work Order 1210387 Address
- 3. Work Performed by SCE&G Name COLUMBIA. SOUTH CAROLINA 29218 Repair/Replacement Organization P.O, No., Job No., etc.
Type Code Symbol Stamp N/A Authorization No.
N/A Expiration Date N/A Address
- 4. Identification of System (SW) Service Water
- 5. (a) Applicable Construction Code ASME III 1971
- Edition, S 1973 Year (b) Applicable Edition of Section XI Utilized for Repair/Replacement Activity 1998
-- Ye-w (c) Applicable Section XM Code Cases W#4
,-"1/2
- 6. Identification of Components:
- Addenda, N/A Code Case Name of Name of Manufacturer Serial National Other Identification Year Built Corrected, Removed or ASME Code Stamped Component Manufacturer No.
Board No.
Installed (Yea/No)
Pipe Maintenance N/A N/A XVG-03172B N/A Installed No Pipe Maintenance N/A N/A XVG-03172B N/A Installed No Attachment Pipe Maintenance N/A N/A SWH-1 127 N/A Installed No Support
- 7. Description of Work XVG-03172B Piping Replacement..
- 8. Tests Conducted:
Pneumatic (
Nominal Operating Pressure (>
Exempt (
Other (4iAT Pressure.
N/A psi Test Temp.
N/A
°F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT FOR REPAIR/REPLACEMENT ACTIVITY As Required by the Provisions of the ASME Code,Section XI FORM NIS-2 (Back)
- 9. Remarks: Post maintenance test performed on Work Order 1210657-001 (VT-2) and VT-3 for the support performed on Work Order 120387-007 Applicable Manufacturer's Data Reports to be attached CERTIFICATE OF COMPLIANCE I certify that the statements made in the report are correct and that this conforms to the requirements of the ASME Code,Section X.
Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed 4"
Vl,-0"6'k.-
6'
'-M
/1
, T_,/,
Date' 3"_
Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province South Carnlina I
and emnloved bv of of I..
HSBCT
( b L,,t,, P r-have inspected the components described in this Owner's Report during the period sp_
4011 to f e, yk, 1
,and state that to the best of my knowledge and belief.the Owner has phrformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions J4}
S1Yo 5C 29.
Aiur tnspector's Signature Date
_________3 National Board, State, Province, and Endorsements
Document Control Desk RC-13-0026 Attachment VIRGIL C. SUMMER NUCLEAR STATION (VCSNS), UNIT I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 INSERVICE INSPECTION REPORT #18 REFUEL 20 TAB E REACTOR VESSEL HEAD EXAMINATION AND REPAIR
SUMMARY
Reactor Vessel Upper Head Examination and Repair Summary The VCSNS Unit 1 Reactor Pressure Vessel Upper Head (RPVUH) was examined during Refuel 20 through Ultrasonic Testing (UT), Eddy Current Testing (ET),
Dye Penetrant Testing (PT), and Visual Examination (VE).
During RF20, the reactor vessel head was examined in accordance with ASME Section Xl Code Case N-729-1 for the integrity of the 65 CRDM penetration and J-groove welds and 1 vent line. The CRDM penetrations were examined via UT, and the vent line was examined via ET. All personnel, procedures and equipment were qualified in accordance with the EPRI PDI program. The top of the head was examined visually per the VE requirements of Code Case N-729-1 with no indications of leakage.
During the UT examination, flaws were detected growing in the tube which appeared to be emanating from just below the toe of the J-groove welds of 4 CRDM Penetration nozzles. These penetrations were 19, 31, 37 and 52.
Subsequent PT of the outside diameter (OD) of these CRDM penetrations confirmed that the suspected nozzles did have Primary Water Stress Corrosion Cracking (PWSCC) emanating down the tube OD, with none of the PT showing the cracking growing into the J-groove welds.
The Westinghouse/PCI WCAP-15987-P Revision 2-P-A processes were followed for the embedded flaw repair, as amended by the request for alternative RR-III-09 and associated Verbal Authorization [ML12325A432]. The weld overlay embeds the flaw below a new surface and arrests the crack from growing any further. The pre-service examination of the weld overlay repairs consisted of PT examination and a new baseline UT examination for each penetration.