Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071E914 + (Transmittal of 2019 Annual Radioactive Effluent Release Report)
- JAFP-20-0034, Transmittal of 2019 Annual Radioactive Effluent Release Report + (Transmittal of 2019 Annual Radioactive Effluent Release Report)
- ML20113E861 + (Transmittal of 2019 Annual Radioactive Effluent Release Report)
- ML20120A430 + (Transmittal of 2019 Annual Radiological Environmental Operating Report)
- ML20143A255 + (Transmittal of 2019 Annual Radiological Environmental Operating Report)
- ML20143A254 + (Transmittal of 2019 Annual Radiological Environmental Operating Report)
- ML21077A120 + (Transmittal of 2019 Annual Report for the University of Texas Triga II Nuclear Research Reactor)
- ML19085A308 + (Transmittal of 2019 Biennial Decommissioning Funding Status Report)
- ML21055A020 + (Transmittal of 2020 Owners Activity Report)
- ML22019A260 + (Transmittal of 2021 Owners Activity Report for the R. E. Ginna Nuclear Power Plant)
- ML23132A153 + (Transmittal of 2022 Annual Financial Reports)
- ML23074A214 + (Transmittal of 2022 Annual Report for the University of Texas Triga II Nuclear Research Reactor)
- ML25132A065 + (Transmittal of 2024 Annual Radioactive Effluent Release Report)
- ML25114A262 + (Transmittal of 2024 Annual Radioactive Effluent Release Report)
- ML25132A064 + (Transmittal of 2024 Annual Radioactive Effluent Release Report)
- ML25013A193 + (Transmittal of 2024 Owners Activity Report)
- ML25240B502 + (Transmittal of 2025 Annual Report for the Wsu Nuclear Science Center)
- ML17270A424 + (Transmittal of 20th Refueling Outage Steam Generator Tube Inspection Report)
- EPID:L-2017-LRQ-0000 + (Transmittal of 20th Refueling Outage Steam Generator Tube Inspection Report)
- NOC-AE-09002408, Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing + (Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing)
- ML090970281 + (Transmittal of 2RE13 Inspection Summary Report for Steam Generator Tubing)
- NOC-AE-18003603, Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing + (Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing)
- ML18291B356 + (Transmittal of 2RE19 Inspection Summary Report for Steam Generator Tubing)
- ML082170288 + (Transmittal of 35-Day Response to Request for Additional Information NRC Bulletin 2007-01, Security Officer Attentiveness)
- JAFP-16-0144, Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 12 + (Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 12)
- GO2-09-110, Transmittal of 60-Day Follow-up Report LER 09-S01-00 + (Transmittal of 60-Day Follow-up Report LER 09-S01-00)
- ML15317A016 + (Transmittal of 60-Day Written Report 2015-008-00, Compensatory Measures Not Implemented Per Procedural Requirements)
- ML20092P598 + (Transmittal of 840629 Affidavit of Vs Boyer Re Estimated Date for Fuel Loading,Per ASLB 840620 Order.Certificate of Svc Encl)
- BYRON 2018-0130, Transmittal of 90-Day Inservice Inspection Report for Interval 4, Period 1, (B1R22) + (Transmittal of 90-Day Inservice Inspection Report for Interval 4, Period 1, (B1R22))
- 3F0308-01, Transmittal of 90-Day Inservice Inspection (ISI) Summary Report + (Transmittal of 90-Day Inservice Inspection (ISI) Summary Report)
- ML082971024 + (Transmittal of ACRS Feedback on the July 10, 2008, Briefing on Browns Ferry Extended Power Uprate Containment Overpressure (COP) Credit)
- ML083570338 + (Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241)
- NRC 2008-0085, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 + (Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241)
- ML20153A360 + (Transmittal of ASME Section III, Division 5 Design Tool for Advanced Non-Light Water Reactor High Temperature Metallic Components)
- ML041900062 + (Transmittal of Abnormal Operation Instruction S023-13-25, Rev 2, Tcn 2-1, Operator Actions During Security Events)
- ML11276A135 + (Transmittal of Accident Sequence Precursor Analysis for Event on July 16, 2010)
- ML112660497 + (Transmittal of Accident Sequence Precursor Analysis for Calvert Cliffs Nuclear Power Plant, Unit No. 2)
- ML24262A227 + (Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles)
- ML090700305 + (Transmittal of Additional Information - License Amendment for Measurement Uncertainty Recapture Power Uprate)
- RS-05-063, Transmittal of Additional Information Related to Extended Power Uprate (EPU) Operation at Dresden and Quad Cities Nuclear Power Stations + (Transmittal of Additional Information Related to Extended Power Uprate (EPU) Operation at Dresden and Quad Cities Nuclear Power Stations)
- NL-08-122, Transmittal of Additional Information Tone Alert Radios + (Transmittal of Additional Information Tone Alert Radios)
- ML20092K973 + (Transmittal of Additional Items for Acceptance Review of WCAP-18641)
- ML23291A302 + (Transmittal of Additional Presentation Slides for the September 21st, 2023 Fuel Performance Update Meeting at the Westinghouse Columbia Fuel Fabrication Facility)
- ML15204A767 + (Transmittal of Additional Surveillance Plan Information in Support of the NRC Review of WCAP-15942-P-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies)
- ML20032D118 + (Transmittal of Addl Info in Support of Previous Motions for Postponement & Setting Dates of Prehearing Conference. Related Correspondence)
- ML20080L086 + (Transmittal of Addl Matl Re Contentions V-3a & V-3b Concerning Ability of safety-related Structures to Withstand Effects of Postulated Detonation Resulting from Pipeline Ruptures.Certificate of Svc Encl)
- BSEP 02-0022, Transmittal of Addressee Changes to Service/Distribution List for Brunswick Steam Electric Plant Unit 2 + (Transmittal of Addressee Changes to Service/Distribution List for Brunswick Steam Electric Plant Unit 2)
- ML18227D848 + (Transmittal of Affidavit for Proposed Amendment to Facility)
- ML15037A048 + (Transmittal of Affidavit from Areva for RAI Response to Relief Request 52)
- ML13186A186 + (Transmittal of Affidavit of Friends of the Coast/New England Coalition Pro Se Representative, Raymond Shadis, Certifying All Relevant Materials Have Been Disclosed, in the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1))
- ML12342A001 + (Transmittal of Affidavit of Raymond Shadis, Certifying That All Relevant Materials Have Been Disclosed and That Documents Are Accurate and Complete as to Documents Identified by November 15, 2012 in the Matter of Seabrook Station, Unit 1)