Transmittal of 2024 Owners Activity Report
ML25013A193
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/13/2025
From: Blankenship J
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML25013A193 (1)


Text

Constellation.

January 13, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 R.E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 James D. Blankenship Site Vice President R.E. G1nna Nuclear Power Plant 1503 Lake Rd.

Ontario. NY 14519 315-791-5205 Office 1ames.blankensh1p'f\\'constellat1on.com www.constellation.com

Subject:

Transmittal of 2024 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2024. This report is submitted as specified by ASME Code Section XI.

There are no regulatory commitments contained in this letter.

If you have any questions, please contact Claire Schmittinger at (315) 791-3203.

Respectfully, - -

James D. Blankenship : SIXTH INSERVICE INSPECTION (ISi) INTERVAL and THIRD CONTAINMENT INSPECTION INTERVAL (CISI), SECOND INSPECTION PERIOD (ISi AND CISI); 2024 OWNER'S ACTIVITY REPORT for RFO-45 INSERVICE EXAMINATIONS (October 1, 2024, through October 15, 2024) cc:

NRC Regional Administrator, Region 1 NRC Project Manager, Ginna NRC Resident Inspector, Ginna

ATTACHMENT 1 SIXTH INSERVICE INSPECTION (ISi) INTERVAL AND THIRD CONTAINMENT INSPECTION INTERVAL (CISI),

SECOND INSPECTION PERIOD (ISi AND CISI) 2024 OWNER'S ACTIVITY REPORT FOR RFO-45 INSERVICE EXAMINATIONS (October 1, 2024, through October 15, 2024)

R.E. Ginna Nuclear Power Plant, LLC January 13, 2025

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number:....,G.,_1:..:.R..,_4.,_,5.__ _________________________________ _

Plant _______

....,R-".=E"'". =G=in""n=a""'N'""u=c=le=a=r....,P....,oa.aw""'e""r'""P'""la=n..,_,t,_,..,_.,15:..;0=3._,L;:aa=k=e'-'R~o==a,..,d=,--'!O""n.,_,,ta=r""io...,.... N""'ea.awa....,..Y=or,.,_k,_1"""4'""'1-=5=9-------

(Name and Address of Plant)

Unit No.-~--

Commercial service date June 1, 1970 Refueling outage no.~G~1'""R~4~5 _______ _

Applicable inspection interval ___

S=ix=th"""l=n-sp=e=c=ti"'o""n..,_,ln..,_,t="'e'-'rv""a"=I..,0-;a,S...,l}:-';&"'"T""=h=""i-;-ard~l'"'n=s=pe=c=t=io~n--'l~nt=e~rv=a~l """(C=l-=S"'l}~--------

(1st, 2nd, 3rd, 4th, Other)

Applicable inspection period __

___,,S,_,.e'-"c=on'-'-d::....:.:.ln..,,s.,.p=ec"-'t,..,io""'n'--'P_,e""r.,_,io,_,.d:.....,,..:11..,.S,._I _,.,&....,C"-'o=n,_,,ta,,,i'"""nm"-"-"e.:..:.nt.,_l,_,,S'"'"I},__ ___________ _

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans _....,A

.... S=M~E'-'S=e=c~ti=o~n.... X=l-=2=0....

13=-=E=d.,_,,it=io~n ______ _

Date and revision of inspection plans ER-Gl-330-1001, Rev. 118/18/2021), Rev. 2 /9/23/2024)

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same as above Code Cases used for inspection and evaluation: N-716-1 N-722-1 N-729-6 N-731 N-864 (if applicable)

Remarks None CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of G1 R45 conform to the requirements of the ASME Section XI.

(refueling outage number)

Signed C}1(11{,/ /411:i/"t't1d,,/Jimd, f,a(Q::t?~

, S:sr tng f\\£.ef" Owner's Desi nee Date (JI fr.Y1~5 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford. CT have inspected the items described in this Owner's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluations described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or co~

1 e!i:ted w,ith this l!Jspection.

I 1

\\

1, 1 1

/

Commissions ANIA 17483 NY 5742

~ /

V (Inspector's Signature)

(National Board Number and Endorsement)

Dale I,:'.j 'tel S

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item and Flaw or Relevant Condition EVALUATION DESCRIPTION Number Description B-P / B15.10 Dry Boric Acid Residue found on AOV-427 Accepted by evaluation (Issue Report:

(Reference IR 04809085). No evidence of 04809085) substrate materials wastage (Ref. E-Health 04809085).

TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE CODE ITEM DESCRIPTION OF WORK DATE REPAIR/REPLACEMENT PLAN CLASS DESCRIPTION COMPLETED NUMBER N/A N/A N/A N/A N/A