Text
Dale K. Atkinson ENERGUY Vice President, Operational Support ENERGYP.O.
Box 968, PE03 Richland, WA 99352-0968 Ph. 509.377.4302 1 F. 509.377.4098 dkatkinson @ energy-northwest.com August 10, 2009 G02-09-1 10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 LICENSEE EVENT REPORT NO. 2009-S01-00
Dear Sir or Madam:
Transmitted herewith is 60-Day Follow-up Report No. 2009-S01 -00 for Columbia Generating Station. This report is submitted in consideration of anticipated interest in Energy Northwest's investigation of the event reported in Event Report 45131 on June 13, 2009. The enclosed report contains security related information and is requested to be withheld from public disclosure under 10 CFR 2.390.
There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Mr. GV Cullen at (509) 377-6105.
Respectfully, DK Atkinson Vice President, Operational Support
Enclosure:
Licensee Event Report 2009-SO1 -00 cc: EE Collins, Jr. - NRC RIV NJ DiFrancesco - NRC NRR INPO Records Center (w/o)
NRC Sr. Resident Inspector - 988C (2)
RN Sherman - BPA/1399 (w/o)
WA Horin - Winston & Strawn (w/o)
WCWalker-NRCRIV
.