ML090700305
| ML090700305 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/10/2009 |
| From: | Spina J Constellation Energy Group, Nuclear Generation Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML090700305 (2) | |
Text
James A. Spina Vice President 0:::::
Con$ie~latlon Energy Nuclear Generation Group U. S. Nuclear Regulatory Commission Washington, DC 20555 March 10,2009 Calvert Cliffs Nuclear Power Plant, Inc.
1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax ATTENTION:
SUBJECT:
REFERENCE:
Document ControI Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Additional Information -
License Amendment for Measurement Uncertainty Recapture Power Uprate - Calvert Cliffs Nuclear Power Plant Unit Nos. I and 2 (a)
Letter from Mr. J. A. Spina (CCNPP) to Document Control Desk (NRC),
dated February 17, 2009, Response to Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 In Reference (a), Calvert Cliffs Nuclear Power Plant, Inc. provided information to support the Nuclear Regulatory Commission (NRC) review of our submittal for a measurement uncertainty recapture power uprate.
Following receipt of Reference (a), a phone call was held between the NRC staff and Calvert Cliffs staff to clarify our response to RAI 2 (Reference a).
Attachment (1) contains the clarifying information requested during the phone call with the NRC staff.
Document Control Desk March 10,2009 Page 2 Should you have questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219.
STATE OF MARYLAND TO WIT:
COUNTY OF CALVERT I, James A. Spina, being duly sworn, state that I am Vice President - Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other CCNPP employees and/or consultants.
Such information has been reviewed in accordance with company practice and I believe it to be reliable.
Subscribed and sworn before me, a Notary Public i);l and for the State of Maryland and County of
- y. I1)Cl.rJ :0
, this ~ day of 7Y')aAc.fI.---'
,2009.
WITNESS my Hand and Notarial Seal:
.r:
cr£JrA Notary PublicJ My Commission Expires:
JAS/PSF/bjd
/
DJO!/
D~te
Attachment:
(1)
Additional Information -
License Amendment for Measurement Uncertainty Recapture Power Uprate cc:
D. V. Pickett, NRC S. J. Collins, NRC Resident Inspector, NRC S. Gray, DNR