Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DCL-18-112, Technical Specification 5.6.8 PAM Instrumentation Report + (Technical Specification 5.6.8 PAM Instrumentation Report)
- ML19289E556 + (Technical Specification 5.6.8 Special Report: Inoperable Containment Isolation Valve Indication)
- ML19353A409 + (Technical Specification 5.6.8 Special Report: Inoperable Containment Isolation Valve Indication Supplemental Report)
- ML23276B455 + (Technical Specification 5.6.8 – Post Accident Monitoring (PAM) Report)
- NL-15-097, Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2015 Refueling Outage (3R18) + (Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2015 Refueling Outage (3R18))
- NL-19-060, Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2019 Refueling Outage (3R20) + (Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2019 Refueling Outage (3R20))
- CNL-14-178, Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program + (Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program)
- ML072070547 + (Technical Specification 6.12, High Radiation Area (TAC MD38895))
- ML11189A066 + (Technical Specification 6.7.2(2) (a) Change in Operating Organization)
- ML15055A596 + (Technical Specification 6.7.2(2)(a), Change in Operating Organization)
- LR-N11-0010, Technical Specification 6.9.1.5 - Annual Report + (Technical Specification 6.9.1.5 - Annual Report)
- LR-N09-0033, Technical Specification 6.9.1.5 - Annual Report for the Period from January 1, 2008 Through January 1, 2009 + (Technical Specification 6.9.1.5 - Annual Report for the Period from January 1, 2008 Through January 1, 2009)
- LR-N10-0021, Technical Specification 6.9.1.5 - Annual Report - January 1, 2009 - January 1, 2010 + (Technical Specification 6.9.1.5 - Annual Report - January 1, 2009 - January 1, 2010)
- LR-N06-0248, Technical Specification 6.9.1.5 Annual Reports + (Technical Specification 6.9.1.5 Annual Reports)
- LR-N03-0077, Technical Specification 6.9.1.5 Annual Reports + (Technical Specification 6.9.1.5 Annual Reports)
- LR-N23-0018, Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b - 2022 Annual Report of SRV Challenges)
- LR-N21-0002, Technical Specification 6.9.1.5.b 2020 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b 2020 Annual Report of SRV Challenges)
- LR-N22-0019, Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b 2021 Annual Report of SRV Challenges)
- LR-N25-0023, Technical Specification 6.9.1.5.b 2024 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b 2024 Annual Report of SRV Challenges)
- LR-N13-0221, Technical Specification 6.9.1.5.b, 2012 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b, 2012 Annual Report of SRV Challenges)
- LR-N14-0030, Technical Specification 6.9.1.5.b, 2013 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b, 2013 Annual Report of SRV Challenges)
- LR-N15-0027, Technical Specification 6.9.1.5.b, 2014 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b, 2014 Annual Report of SRV Challenges)
- LR-N18-0020, Technical Specification 6.9.1.5.b, 2017 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b, 2017 Annual Report of SRV Challenges)
- LR-N20-0012, Technical Specification 6.9.1.5.b: 2019 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b: 2019 Annual Report of SRV Challenges)
- LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges + (Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges)
- L-07-006, Technical Specification 6.9.7 - Steam Generator Inspection Report + (Technical Specification 6.9.7 - Steam Generator Inspection Report)
- ENS 57445 + (Technical Specification Abnormal Occurrence)
- ENS 58063 + (Technical Specification Abnormal Occurrence)
- 05000346/LER-2005-006, Technical Specification Action Missed Due to Improper Valve Positioning by Operator + (Technical Specification Action Missed Due to Improper Valve Positioning by Operator)
- 05000250/LER-2020-005-01, Technical Specification Action Not Taken for Unrecognized Inoperable Source Range Channel (Rev 1) + (Technical Specification Action Not Taken for Unrecognized Inoperable Source Range Channel (Rev 1))
- 05000250/LER-2020-001, Technical Specification Action Not Taken for Unrecognized Inoperable Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrument Channel Functional Units + (Technical Specification Action Not Taken for Unrecognized Inoperable Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) Instrument Channel Functional Units)
- 05000250/LER-2020-005, Technical Specification Action Not Taken for Unrecognized Inoperable Source Range Channel + (Technical Specification Action Not Taken for Unrecognized Inoperable Source Range Channel)
- 05000305/FIN-2009004-01 + (Technical Specification Action Requirements During a Leak in a Containment Fan Coil Unit Service Water Line)
- 05000255/LER-2007-010, Technical Specification Action Requirements Not Met for Battery Cell Parameter Outside Allowable Limits + (Technical Specification Action Requirements Not Met for Battery Cell Parameter Outside Allowable Limits)
- ML20058L552 + (Technical Specification Action Statements Requiring Shutdown.A Risk Perspective with Application to the Rhr/Ssw Systems of a BWR)
- 05000499/LER-2015-001, Technical Specification Action Statement Time Exceeded Due to Turbine-Driven Auxiliary Feedwater Pump Test Failure Not Recognized + (Technical Specification Action Statement Time Exceeded Due to Turbine-Driven Auxiliary Feedwater Pump Test Failure Not Recognized)
- 05000423/LER-2020-001, Technical Specification Allowed Outage Time Exceeded by Accident Monitoring Instrument + (Technical Specification Allowed Outage Time Exceeded by Accident Monitoring Instrument)
- 05000458/FIN-2015010-01 + (Technical Specification Allowed Outage Time During Loss of Non-Technical Specification Supported Systems)
- 05000341/FIN-2017003-02 + (Technical Specification Allowed Outage Time Exceeded for Electrical Power Distribution Systems Due to Auxiliary Equipment Out of Service)
- ML020530556 + (Technical Specification Amend Re Containment Penetration)
- ML021930233 + (Technical Specification Amend, Primary Containment and Drywell Isolation Instrumentation)
- ML040550514 + (Technical Specification Amendment 123 & 101 for Vogtle Units 1 & 2)
- ML040760345 + (Technical Specification Amendment 133)
- ML040760339 + (Technical Specification Amendment 189)
- ML15076A019 + (Technical Specification Amendment 19)
- ML15076A018 + (Technical Specification Amendment 19 - Use of 6% Enriched Fuel)
- ML020180029 + (Technical Specification Amendment 209 Indian Point 3)
- W3F1-2010-0063, Technical Specification Amendment 226 Editorial Error + (Technical Specification Amendment 226 Editorial Error)
- ML022950381 + (Technical Specification Amendment 235 - 2.3 Limiting Safety System Settings Pages 2.3-1, 2.3-2, 2.3-4, 2.3-5, 2.3-6, 3.1-1, 3.1-7, 3.10-2, 3.10-3, and 3.10-4)
- ML040550518 + (Technical Specification Amendment 96 & 74 to Vogtle Units 1 &2)
- ML062710022 + (Technical Specification Amendment No. 210 - H.B. Robinson, Unit 2 - Issuance of Amendment and Partial Denial Reactor Protection System and Engineered Safety Feature Actuation System Instrumentation Tables)
- ML020440332 + (Technical Specification Amendment No. 223, Re Removal of Containment Isolation Valve Lists from Technical Specifications)