Text
PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 1>s1<1 Nuclear.LLC Technical Specification 6.9.1.5.b LR-N 15-0027 FEB 2} 2015 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 Technical Specification 6.9.1.5.b 2014 Annual Report of SRV Challenges This report is being submitted in accordance with Hope Creek Technical Specification 6.9.1.5.b, which requires the documentation of all challenges to main steam line safety/relief valves (SRVs) be provided on an annual basis.
For 2014, the SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
There are no regulatory commitments contained in this letter.
Should you have any questions, please contact Mr. Philip Duca at 856-339-1640.
Eric S. Carr Plant Manager - Hope Creek pjd
Document Control Desk LR-N 15-0027 Page 2 of 2 cc Mr. Dan Dorman, Regional Administrator - Region 1 Nuclear Regulatory Commission Ms. Carlene Sanders-Parker-Project Manager Hope Creek USNRC NRG Senior Resident Inspector - Hope Creek (X24)
Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering PO Box 415 Trenton, NJ 08625 Mr. Thomas MacEwen - Hope Creek Commitment Coordinator (H02)
Mr. Lee Marabella - Corporate Commitment Coordinator (N21)