Technical Specification Amendment 209 Indian Point 3
ML020180029
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 01/17/2002
From: Milano P
NRC/NRR/DLPM/LPD1
To: Kansler M
Entergy Nuclear Generation Co
References
TAC MB3356
Download: ML020180029 (1)


Text

DC Sources - Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage on float charge 31 days is within the following limits:

a. > 125.7 V for battery 31;
b. _>123.5 V for battery 32; and
b. > 127.8 V for batteries 33 and 34.

SR 3.8.4.2- --------------------NOTE ---------------------

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.

Verify each battery charger supplies its 24 months associated battery at the voltage and current adequate to demonstrate battery charger capability requirements are met.

SR 3.8.4.3 - --------------------NOTES .....................

This Surveillance shall not be performed in MODE 1, 2, 3, or 4.*

Verify battery capacity is adequate to supply, 24 months and maintain in OPERABLE status, the required emergency loads for the design duty cycle when subjected to a battery service test or a modified performance discharge test.

(continued)

  • This battery surveillance may be performed on a one-time only basis during replacement of Station batteries 31 and 32 when the unit is in Mode 1, 2, 3, or 4 in order to support the one-time allowed outage time change of 10 days, as indicated in section 3.8.4.B. This testing shall be done when the battery is disconnected from the DC bus.

INDIAN POINT 3 3.8.4 - 2 Amendment 209