Technical Specification Amend Re Containment Penetration
ML020530556
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/20/2002
From:
NRC/NRR/DLPM
To:
References
Download: ML020530556 (2)


Text

Containment Penetrations 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Containment Penetrations LCO 3.9.4 The containment penetrations shall be in the following status:

a. The equipment hatch closed and held in place by four bolts, or if open, capable of being closed;
b. One door in the emergency air lock closed and one door in the personnel airlock capable of being closed; and
c. Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:
1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or
2. capable of being closed by an OPERABLE containment ventilation isolation valve.

Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere may be unisolated under administrative controls.

APPLICABILITY: During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more containment A.1 Suspend CORE Immediately penetrations not in required ALTERATIONS.

status.

AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

COMANCHE PEAK - UNITS I AND 2 3.9-7 Amendment No. 9, 93

Containment Penetrations 3.9.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.4.1 Verify each required containment penetration is in the 7 days required status.

SR 3.9.4.2 --------------------- NOTE-----------------

Only required for an open equipment hatch Verify the capability to install the equipment hatch. 7 days SR 3.9.4.3 Verify each required containment ventilation isolation 18 months valve actuates to the isolation position on an actual or simulated actuation signal.

COMANCHE PEAK - UNITS 1 AND 2 3.9-8 Amendment No. 64, 93