Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000316/LER-2002-002, Technical Specification 3.9.4.c Was Violated During Core Alteration + (Technical Specification 3.9.4.c Was Violated During Core Alteration)
- ML031410594 + (Technical Specification 3/4.3.2 - Reduce Actuation Relay Test Frequency)
- W3F1-2010-0062, Technical Specification 3/4.9.7 Crane Travel - Fuel Handling Building Commitment Response + (Technical Specification 3/4.9.7 Crane Travel - Fuel Handling Building Commitment Response)
- ML070780059 + (Technical Specification 4.1.1 Regarding Control Rod System Surveillance Requirements)
- ML19093B350 + (Technical Specification 4.13D States, in Part, That a Final Report Summarizing the Results of Nonradiological Environmental Monitoring Program Be Submitted in 60 Days)
- ML061000237 + (Technical Specification 4.4.5.5(a) Report of Steam Generator Tube Plugging)
- ML062850098 + (Technical Specification 4.4.5.5.b and 6.9.1.5.b: Report of Steam Generator Tube Inservice Inspection Results)
- ML050530314 + (Technical Specification 4.4.5.5a Report of Steam Generator Tube Plugging)
- ML020850568 + (Technical Specification 4.4.5.5a Report of Steam Generator Tube Plugging)
- ML041980222 + (Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J)
- ML053420388 + (Technical Specification 5.5.6, Inservice Testing Program)
- ML081070049 + (Technical Specification 5.5.7, Inservice Testing Program Tac No. MD5713))
- L-MT-22-004, Technical Specification 5.6.4 Post Accident Monitoring Report + (Technical Specification 5.6.4 Post Accident Monitoring Report)
- BSEP 04-0077, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report + (Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report)
- NG-15-0315, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 2015 + (Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report, October 2015)
- NG-15-0344, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report December 2015 + (Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report December 2015)
- NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days + (Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days)
- BSEP 05-0067, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Instrumentation Report + (Technical Specification 5.6.6 Post Accident Monitoring (PAM) Instrumentation Report)
- BSEP 03-0130, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Instrumentation Report + (Technical Specification 5.6.6 Post Accident Monitoring (PAM) Instrumentation Report)
- NG-19-0077, Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report + (Technical Specification 5.6.6 Post Accident Monitoring (PAM) Report)
- RA-18-129, Technical Specification 5.6.6 Special Report, Inoperability of Post Accident Monitoring Instrument; Containment Sump Wide Range Water Level (CR 02218964) + (Technical Specification 5.6.6 Special Report, Inoperability of Post Accident Monitoring Instrument; Containment Sump Wide Range Water Level (CR 02218964))
- L-20-132, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report + (Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report)
- EPID:L-2020-LRO-0055 + (Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report)
- L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report + (Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report)
- EPID:L-2022-LRO-0115 + (Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report)
- ML24255A803 + (Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report)
- L-10-314, Technical Specification 5.6.6 Steam Generator Tube Inspection Report + (Technical Specification 5.6.6 Steam Generator Tube Inspection Report)
- L-12-276, Technical Specification 5.6.6 Steam Generator Tube Inspection Report + (Technical Specification 5.6.6 Steam Generator Tube Inspection Report)
- L-12-331, Technical Specification 5.6.6.1 - Steam Generator Inspection Report + (Technical Specification 5.6.6.1 - Steam Generator Inspection Report)
- L-11-269, Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report + (Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report)
- L-10-014, Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report + (Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report)
- L-08-320, Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report + (Technical Specification 5.6.6.2.1 - Steam Generator Inspection Report)
- ML12103A168 + (Technical Specification 5.6.7 - IP2 Steam Generator Tube Inspection Report - Spring 2012 Refueling Outage)
- NL-08-166, Technical Specification 5.6.7 - Steam Generator Tube Inspection Report - Spring 2008 Refueling Outage + (Technical Specification 5.6.7 - Steam Generator Tube Inspection Report - Spring 2008 Refueling Outage)
- NL-12-024, Technical Specification 5.6.7 -. IP2 Steam Generator Tube Inspection Report - Spring 2012 Refueling Outage + (Technical Specification 5.6.7 -. IP2 Steam Generator Tube Inspection Report - Spring 2012 Refueling Outage)
- NL-13-032, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage + (Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2013 Refueling Outage)
- NL-11-051, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2011 Refueling Outage + (Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2011 Refueling Outage)
- NL-09-125, Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2009 Refueling Outage + (Technical Specification 5.6.8 - IP3 Steam Generator Tube Inspection Report - Spring 2009 Refueling Outage)
- WO 16-0026, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report + (Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report)
- WO 15-0045, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report + (Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report)
- WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report + (Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report)
- ML23298A090 + (Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report)
- DCL-10-026, Technical Specification 5.6.8 PAM Instrumentation Report + (Technical Specification 5.6.8 PAM Instrumentation Report)
- DCL-18-112, Technical Specification 5.6.8 PAM Instrumentation Report + (Technical Specification 5.6.8 PAM Instrumentation Report)
- ML19289E556 + (Technical Specification 5.6.8 Special Report: Inoperable Containment Isolation Valve Indication)
- ML19353A409 + (Technical Specification 5.6.8 Special Report: Inoperable Containment Isolation Valve Indication Supplemental Report)
- ML23276B455 + (Technical Specification 5.6.8 – Post Accident Monitoring (PAM) Report)
- NL-15-097, Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2015 Refueling Outage (3R18) + (Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2015 Refueling Outage (3R18))
- NL-19-060, Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2019 Refueling Outage (3R20) + (Technical Specification 5.6.8, Unit 3 Steam Generator Tube Inspection Report - Spring 2019 Refueling Outage (3R20))
- CNL-14-178, Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program + (Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program)
- ML072070547 + (Technical Specification 6.12, High Radiation Area (TAC MD38895))
- ML11189A066 + (Technical Specification 6.7.2(2) (a) Change in Operating Organization)