Technical Specification 4.4.5.5a Report of Steam Generator Tube Plugging
ML050530314
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/17/2005
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3125
Download: ML050530314 (2)


Text

FENOC 5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax. 419,321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3125 February 17, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001

Subject:

Technical Specification 4.4.5.5a Report of Steam Generator Tube Plugging Ladies and Gentlemen:

This letter is submitted in accordance with the requirements of the Davis-Besse Nuclear Power Station (DBNPS) Unit Number 1, Operating License, Appendix A, Technical Specifications.

Technical Specification 4.4.5.5a requires FirstEnergy Nuclear Operating Company (FENOC) to report to the Nuclear Regulatory Commission (NRC) the number of tubes plugged in each steam generator (SG) following each inservice inspection of steam generator tubes.

As a result of the Cycle 14 Mid-Cycle Outage SG tube inservice inspection findings and outage activities, 76 tubes wvere newly plugged in SG 1-B and 7 tubes were newly plugged in SG 2-A.

No regulatory commitments are made in this letter. Should you have any questions or require additional information, please contact Mr. Henry L. Hegrat, Supervisor - Licensing, at (330) 315-6944.

Very truly yours, MAR