SUBJECT:
Technical Specification 5.6.7 - IP2 Steam Generator Tube Inspection Report -
Spring 2012 Refueling Outage Indian Point Unit No. 2 Docket No. 50-247 License No. DPR-26
Dear Sir or Madam:
Technical Specification, 5.6.7, requires that a report be submitted to the NRC 180 days after the initial entry into Mode 4 following completion of a steam generator program inspection. This letter documents that Entergy Nuclear Operations, Inc. was not required to perform any inspection in the spring 2012 refueling outage, and therefore no formal report is required to be submitted in accordance with Technical Specification 5.6.7.
The next planned steam generator tube integrity inspection for Indian Point Unit 2 is scheduled for spring 2014, Refueling Outage 2R21. The previous inspection was performed during the spring 2010, Refueling Outage 2R19.
There are no new commitments contained in this letter. If you have any questions or require additional information, please contact me at 914-254-6710.
Sincerely, RW/mb cc: next page A- 0.
" UL
NL-12-024 Docket No. 50-247 Page 2 of 2 cc:
Mr. William Dean, Regional Administrator, NRC Region 1 Mr. John Boska, Senior Project Manager, NRC NRR DORL Mr. Peter Habighorst, Material Control and Accounting Branch, NRC IPEC NRC Resident Inspector's Office Mr. Francis J. Murray, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Department of Public Service