Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PLA-7910, Submittal of Unit 2 Cycle 21 Fuel Rod Design Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7910 + (Submittal of Unit 2 Cycle 21 Fuel Rod Design Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7910)
- PLA-7861, Submittal of Unit 2 Cycle 21 Reload Licensing Documents to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7861) + (Submittal of Unit 2 Cycle 21 Reload Licensing Documents to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7861))
- PLA-7929, Submittal of Unit 2 Cycle 21 Reload Safety Analysis Report + (Submittal of Unit 2 Cycle 21 Reload Safety Analysis Report)
- PLA-7881, Submittal of Unit 2 Cycle 21 Safety Limit Minimum Critical Power Ratio Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7881) + (Submittal of Unit 2 Cycle 21 Safety Limit Minimum Critical Power Ratio Report to Support License Amendment Requesting Application of Advanced Framatome Methodologies (PLA-7881))
- PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 + (Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078)
- PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) + (Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060))
- CPSES-200501615, Submittal of Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, 1999 and 2000 Addenda, Interval Start Date - August 3. 2004, Second Interval) + (Submittal of Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, 1999 and 2000 Addenda, Interval Start Date - August 3. 2004, Second Interval))
- CP-201000061, Submittal of Unit 2 Eleventh Refueling Outage (2RF11) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date-August 3, 2004 + (Submittal of Unit 2 Eleventh Refueling Outage (2RF11) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date-August 3, 2004)
- CP-201400933, Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date: August 2, 2014 + (Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date: August 2, 2014)
- CP-200900848, Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11 + (Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11)
- CPSES-200700127, Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval) + (Submittal of Unit 2 Ninth Refueling Outage (2RF09) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval))
- CPSES-200400143, Submittal of Unit 2 Seventh Refueling Outage (2RF07) Inservice Inspection (ISI) Summary Report (Unit 2:1986 Edition of ASME Code, Section XI, No Addenda, Interval Start Date - August 3, 1993, First Interval) + (Submittal of Unit 2 Seventh Refueling Outage (2RF07) Inservice Inspection (ISI) Summary Report (Unit 2:1986 Edition of ASME Code, Section XI, No Addenda, Interval Start Date - August 3, 1993, First Interval))
- CPSES-200602137, Submittal of Unit 2, Cycle 10 Core Operating Limits Report + (Submittal of Unit 2, Cycle 10 Core Operating Limits Report)
- ML052220339 + (Submittal of United States Maritime Administration Answer to July 19,2005 Generic Order (EA-05-007) Issued by Office of Nuclear Reactor Regulation (NRR))
- ML23250A319 + (Submittal of University of Illinois Topical Report, Event Sequence Identification and SSC Safety Classification Methodology)
- ML24101A414 + (Submittal of University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Micro Modular Reactor (Mmr) Principal Design Criteria Topical Report, Release 02 (Revision 1), Dated April 10, 2024)
- ML23319A408 + (Submittal of University of Illinois Urbana-Champaign High Temperature Gas-cooled Research Reactor: Micro Modular Reactor (Mmr Tm) Principal Design Criteria Topical Report)
- ML020650184 + (Submittal of University of Michigan Occupational Safety & Environmental Health Report of Occupational Dose in Excess of 10 CFR 20.1201(a)(2)(ii) Limits)
- ML19267A041 + (Submittal of University of New Mexico AGN-201M Facility Response to Request for Additional Information Regarding the Operator Requalification Program for Aetojet General Nucleonics Reactor)
- ML17165A297 + (Submittal of University of New Mexico AGN-201M Facility Response to Request for Additional Information Regarding Amendment to Facility Operating License No. R-102 for the University of New Mexico Aerojet General Nucleonics AGN-201M Reactor)
- ML052210072 + (Submittal of University of New Mexico AGN-201M Facility Answer to July 19, 2005 Order (EA-05-007) Issued by Office of NRR)
- ML052210070 + (Submittal of University of New Mexico AGN-201M Facility Answer to July 19, 2005 Order (EA-05-007) Issued by Office of NRR)
- ML16306A410 + (Submittal of University of New Mexico AGN-201M Facility Response to GL 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools)
- ML043640415 + (Submittal of University of New Mexico AGN-201M Facility Response to Request for Additional Information on the Operator Requalification Program)
- RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 + (Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10)
- EPID:L-2022-LLR-0056 + (Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10)
- NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI) + (Submittal of Update Foreign Ownership, Control or Influence (FOCI))
- ML23193A993 + (Submittal of Update Foreign Ownership, Control or Influence (FOCI))
- NOC-AE-19003629, Submittal of Update Foreign Ownership, Control, or Influence (FOCI) + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- NOC-AE-18003561, Submittal of Update Foreign Ownership, Control, or Influence (FOCI) + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI) + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML21011A070 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML22083A186 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML22083A193 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML23222A279 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML19079A241 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- ML18107A246 + (Submittal of Update Foreign Ownership, Control, or Influence (FOCI))
- NOC-AE-15003235, Submittal of Update Foreign Ownership, Control, or Influence (Focl) + (Submittal of Update Foreign Ownership, Control, or Influence (Focl))
- ML15139A045 + (Submittal of Update Foreign Ownership, Control, or Influence (Focl))
- ML18033A150 + (Submittal of Update Report STI-NLF-RPT-040 for the Fort St. Vrain (Fsv) Independent Spent Fuel Storage Installation Emergency Response Plan)
- ML18348A895 + (Submittal of Update of Inservice Inspection Program)
- ML19316C979 + (Submittal of Update to the Monticello Technical Specification Bases)
- ML19316C980 + (Submittal of Update to the Monticello Technical Specification Bases)
- ML090330140 + (Submittal of Update to the Service & Distribution Lists)
- ML22074A167 + (Submittal of Updated ACRS Subcommittee Presentation Slides for NEDO-33914, BWRX-300 Advanced Civil Construction and Design Approach Licensing Topical Report)
- NOC-AE-15003232, Submittal of Updated Casa Grande Input for Stp'S Risk-Informed GSI-191 Licensing Application + (Submittal of Updated Casa Grande Input for Stp'S Risk-Informed GSI-191 Licensing Application)
- ML15072A092 + (Submittal of Updated Casa Grande Input for STPs Risk-Informed GSI-191 Licensing Application)
- RS-13-064, Submittal of Updated Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate + (Submittal of Updated Clinton Power Station Site-Specific Safstor Decommissioning Cost Estimate)
- RA-16-026, Submittal of Updated Decommissioning Cost Analysis + (Submittal of Updated Decommissioning Cost Analysis)
- ML090430133 + (Submittal of Updated Distribution Lists)
- ML071030342 + (Submittal of Updated Distribution Lists of TVA Dockets for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants)
- ML19010A159 + (Submittal of Updated Draft Seep Monitoring Evaluation Report, Mexican Hat, Utah, Umtrca Title I Disposal Site)