Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 41869 + (Special Nuclear Materials Inventory Discovers a Fuel Pin Missing)
- NL-03-146, Special Nuclear Materials Report - October 2002 Through July 2003 + (Special Nuclear Materials Report - October 2002 Through July 2003)
- ML19319B499 + (Special Nuclear Matl:Authority for Access to or Control, 10CFR11,50 & 70 Proposed Rules.Proposed Program Protects Against Internal & External Threats)
- ML20125B462 + (Special Operating Procedure R-2-79-22 to Simulate Operation of Air Operated Condensate Polisher Valves W/Water in Instrument Air Line to Polisher Main Control Panel)
- ML19338B851 + (Special Operating Procedure R-2-79-22, Testing of Condensate Polisher Control Air Sys & Air-Operated Valves W/Water in Instrument Air Supply)
- ML19309A259 + (Special Operating Procedure R-2-79-52)
- ML19309A260 + (Special Operating Procedure R-2-79-53)
- ML19221A446 + (Special Operating Procedure Re Hydrogen Recombiner Operation)
- ML19221A180 + (Special Operating Procedure Re Pressure Reduction During Regassification)
- ML19221A535 + (Special Operating Procedure Z-10 Re Venting Mu-tank Gas Space)
- ML19221A539 + (Special Operating Procedure Z-103 Re Water/Water Cooling for once-through Steam Generator B)
- ML19221A450 + (Special Operating Procedure Z-12 Re Hydrogen Recombiner Operation,Specifying Proper Procedures for Operation of Both Recombiners)
- ML19221A215 + (Special Operating Procedure Z-48 Re Condensate Pump Flow Test Through Emergency Feed Pumps.Operational Summary Encl)
- ML19221A069 + (Special Operating Procedure Z-57 Re Pressure Reduction During Degassification.Operations Support Plans Encl)
- ML19221A252 + (Special Operating Procedure Z-57,Revision 3 Re Pressure Reduction During Degassification Operations Support Data)
- ML19221A525 + (Special Operating Procedure Z-6 Re Pressurizer Degas Procedure)
- ML19221A528 + (Special Operating Procedure Z-8 for Waste Gas Troubleshooting for Valve Leaks)
- ML19253A448 + (Special Operating Procedure Z-81,Revision 0, Chemical & Radiochemical Sampling & Analysis Procedure for Air & Water Samples)
- ML19221A532 + (Special Operating Procedure Z-9 Re Sampling Makeup Tank Mu T-1)
- ML20136B629 + (Special Operating Procedure, H2 Recombiner Operation. H2 Recombiner Sequence Encl)
- ML19276G556 + (Special Operating Procedures & Emergency Procedures,For 790430-0604)
- ML19221A294 + (Special Operating Procedures EP-1 to EP-33 for Period 790328-0501)
- ML19221A507 + (Special Operating Procedures Summary 790331-0404)
- ML19221A452 + (Special Operating Procedures for Chemical Radioactive Analyses for Air & Water Samples)
- ML19224A770 + (Special Operating Procedures for TMI)
- ML19221A257 + (Special Operating Procedures,Notes & info,790331-0411)
- ML19221A237 + (Special Operations Procedure Z-28 Re once-through Steam Generator Level Control During Natural Circulation W/Level Higher than Normal)
- ML18249A355 + (Special Package Authorization Request for One-time Shipment - USA/9297/AF-96 for Model No. Traveller Std, Xl, and Vver Packages)
- ML23208A147 + (Special Package Authorization for the CR3 Middle Package(CR3MP) - Docket No. 71-9393)
- ML061310155 + (Special Permit for Shipment of Reactor Vessel Closure Heads to Race LLC in Memphis, Tn (DOT Docket No. PHMSA-2006-23643), Supplemental Information)
- ML20133N808 + (Special Physical Security Insp Rept 50-352/85-22 on 850417- 19 & 22.Major Areas Inspected:Training of Security Personnel,Including Reexams of Selected Personnel & Util 850403 Response to Violations in Insp Rept 50-352/85-12)
- IR 05000266/1985014 + (Special Physical Security Insp Repts 50-266/85-14 & 50-301/85-14 on 850712-17 in Region III Ofc & 850715-16 Onsite.Violation Noted:Unauthorized Firing of Weapon.Details Withheld (Ref 10CFR73.21(c)(2)))
- ML17303A887 + (Special Plant Event Evaluation Rept 87-02-019 & Mods to Valves Sga UV 134 & Sga UV 138 Render 2AFA-P01 on 871127)
- ML19262A948 + (Special Plant Procedure for Test of Masonry Bond Tension- to-Concrete Core in Masonry Block Walls)
- ML20235R380 + (Special Post-Startup Training Program to Satisfy Requirements of NUREG-1021,Section ES-109,Parts B.2.e & B.2.f for Reactor Operator Licensed Personnel & Parts D.2.e & D.2.f for Senior Reactor ..)
- ML20126L788 + (Special Prehearing Conference Brief Re Principal Concerns of Lake County,Oh.Adequacy of Emergency Response Plans, Independent Radiological Monitoring & Burden of Financing Response Plans Discussed.Certificate of Svc Encl)
- ML20033C999 + (Special Prehearing Conference Memorandum & Proposed Order. Addresses Necessity for Schedule Consistent W/Nrc Request That Proceeding Be Completed by 820918 & Burden of Going Forward W/Evidence.Certificate of Svc Encl)
- ML20155G728 + (Special Prehearing Conference Memorandum & Order Granting Case & M Gregory 860407 Petitions to Intervene & Admitting Condition 1 Re Applicant Failure to Prove Delay in Const Not Due to Applicant Conduct.Served on 860506)
- ML20009F221 + (Special Prehearing Conference Memorandum & Order Re Party Status,Motions to Dismiss & to Stay,Admissibility of Contentions & Adoption of Special Discovery Procedures)
- ML20010E035 + (Special Prehearing Conference Memorandum & Order Granting Citizens for Nuclear Reactor Safety,Inc 801210 Petition to Intervene.Also Rules on Contentions)
- ML19326B070 + (Special Prehearing Conference Order Admitting E Stebbins & Coalition for Safe Electric Power as Intervenor in Proceeding & Admitting 8 Contentions in 730410 Petition to Intervene Issues in Proceeding.Certificate of Svc Encl)
- ML19290B959 + (Special Prehearing Conference Order Directing Parties to Commence Discovery & Trial Preparation Immediately & to Complete Discovery by 790108.Certificate of Svc Encl)
- ML18043B034 + (Special Prehearing Conference Order Granting Great Lakes Energy Alliance Petition to Intervene,Adopting Preliminary Schedule for Discovery & Hearing & Denying Intervenor Request for Financial Assistance.Order Subj to Appeal)
- ML20053D057 + (Special Prehearing Conference Order Re 820106-08 Conference Ruling on Petitions to Intervene & Admissibility of Proposed Contentions)
- ML20151G596 + (Special Prehearing Conference Order.* Discusses ASLB Rulings from 880721 Special Prehearing Conference.Served on 880727)
- ML19281A608 + (Special Prehearing Conference Order.Grants Four Intervention Petitions,Adopts Preliminary Schedule & Denies Requests for Financial Assistance)
- ML19289C274 + (Special Prehearing Conference Provided for in ASLBs Memo & Order of 781026 Will Commence at 2:30 on 790129 in Fed Bldg & Us Courthouse,Wilkes-Barre,PA.Conference Will Consider All Intervention Petitions and Identify Key Issues)
- ML19347E254 + (Special Prehearing Conference Ruling on Intervention Petitions,Requests for Hearings & Contentions.Some Petitioners Admitted as Intervenors & Others Denied.Reed & Joint Intervenors Contentions Revised)
- ML19276E500 + (Special Prehearing Conference for Limited Appearances Rescheduled for 790315-16 for Evening Appearances)
- ML19207C455 + (Special Procedure for Ultrasonic Examination of Austenitic Welds)
- ML17006A267 + (Special Proceeding)