Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20249B509 + (SG ISI Results for Fourteenth Refueling Outage)
- ML17354A749 + (SG Insp Rept)
- ML17353A394 + (SG Insp Rept)
- ML20199J593 + (SG Insp Results,Fall 1996 Refueling Outage 14 (Z2R14))
- ML062560134 + (SG Inspection Report)
- ML062720201 + (SG Inspection Report, E-mail: Response to NRC Questions 1, 2, 3 and 4)
- ML051940033 + (SG Inspection Summary Report Draft RAI)
- ML051580325 + (SG Inspections)
- ML20203K536 + (SG Internals Degradation:Modes of Degradation Detected in Edf Units)
- ML070790023 + (SG Program, Comments on TSTF 449 Amendment)
- ML20064E993 + (SG Regulatory Guide 1.121 Evaluation)
- ML13053A347 + (SG Replacement Meeting Confirm to FENOC)
- ML20155F867 + (SG Secondary Side Corrosion Problems in Doel 4)
- L-97-215, SG Secondary Side Loose Object Safety Evaluation + (SG Secondary Side Loose Object Safety Evaluation)
- ML061250370 + (SG Tub Integrity TS Amendment Request -TAC MD0209/MD0210)
- ML17263B052 + (SG Tube Degradation Due to Iga/Scc, Causing QA Manual Reportable Limits to Be Reached)
- ML020880161 + (SG Tube Failure Lessons Learned Task Group Summary)
- ML092810089 + (SG Tube ISI Conference Call for Fall 2009 RFO)
- ML102290532 + (SG Tube ISI RAIs)
- ML112170066 + (SG Tube ISI Report - RAIs - ME6102)
- ML17229A441 + (SG Tube ISI Special Rept)
- ML18066A306 + (SG Tube Inservice Insp)
- ML17229A996 + (SG Tube Inservice Insp Special Rept)
- ML17310B091 + (SG Tube Insp Plan)
- ML073331083 + (SG Tube Inspection Discussion During 2007 Palisades Outage)
- ML25349A095 + (SG Tube Inspection Report Review)
- ML062370007 + (SG Tube Inspection Summary, Discussion Points and Table 1)
- ML062370008 + (SG Tube Inspection Summary, Table 2 & 3)
- ML20211N463 + (SG Tube Integrity Evaluation)
- ML051580329 + (SG Tube Loads at Millstone Unit 3)
- ML20086U031 + (SG Tube Plugging Criteria for Outside Diameter Stress Corrosion Cracking (ODSCC) at Tube Support Plates)
- ML20141A042 + (SG Tube Rupture Induced from Operational Transients,Dbas & Severe Accidents)
- ML20059H593 + (SG Tube Rupture Recovery Guideline)
- 2CAN079205, SG Tubing Inservice Insp Rept, Mar 1992 Forced Outage (2F92-1) + (SG Tubing Inservice Insp Rept, Mar 1992 Forced Outage (2F92-1))
- ML20133B642 + (SG Tubing Outside Diameter Stress Corrosion Cracking at Tube Support Plates Database for Alternate Repair Limits)
- ML13308C340 + (SG Unit 3 Telephone Call)
- ML20135E531 + (SG a & D Isi)
- ML14224A576 + (SG-CCOE-14-1, Revision 0, Generic Letter 95-05 Tube Intersection Burst Test, Leakage Test, and Morphology Conclusions)
- ML15119A104 + (SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 1 of 4)
- L-15-091, SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4 + (SG-CCOE-14-4-NP, Revision 1, Examination of Steam Generator Tubes Removed, Part 2 of 4)
- ML070870123 + (SG-CDME-07-7, Revision 1, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 14, 90 Day Report, Sequoyah Unit 2)
- ML082480691 + (SG-CDME-08-24, Revision 0, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 15 90 Day Report, Sequoyah Unit 2)
- NL-10-0166, SG-CDME-09-4-NP, Examination of Steam Generator Tubes Removed from Vogtle Unit 1, Enclosure 2 + (SG-CDME-09-4-NP, Examination of Steam Generator Tubes Removed from Vogtle Unit 1, Enclosure 2)
- ML030860597 + (SG-SGDA-02-43-NP, Comanche Peak Steam Electric Station IRF09 Outage Condition Monitoring Report and Preliminary Cycle 10 Operational Assessment)
- ML030860602 + (SG-SGDA-03-03-NP, Comanche Peak Steam Electric Unit 1 Cycle 10 Operational Assessment)
- ML060670447 + (SG-SGDA-05-04-NP, Rev. 0, Comanche Peak Steam Electric Station 1RF11 Outage Condition Monitoring Report and Preliminary Cycle 12 Operational Assessment, October 2005)
- ML072670047 + (SG-SGDA-05-48-NP, Rev 1, WOG PA-MSC-0190, Rev 1: Test Results Related to Tig and Alloy 800 Sleeve Installation in 3/4 Inch and 7/8 Inch OD SG Tubing In-Service Inspection Requirements, Attachment E)
- CPSES-200600267, SG-SGDA-05-51, Rev 0, Cycle 12 Voltage-Based Repair Criteria 90-Day Report + (SG-SGDA-05-51, Rev 0, Cycle 12 Voltage-Based Repair Criteria 90-Day Report)
- ML100550773 + (SG-SGMP-10-2, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 16 - 90 Day Report, Enclosure 1)
- ML13028A471 + (SG-SGMP-13-2, Rev. 1, Beaver Valley Unit 2, End-of-Cycle 16 Voltage-Based Repair Criteria 90-Day Report)
- ML14224A577 + (SG-SGMP-14-17, Revision 1, Beaver Valley, Unit 2, End-of-Cycle 17 Analysis and Prediction for End-of-Cycle 18 Voltage-Based Repair Criteria 90-Day Report)