Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revisied Emergency Plan Implementing Procedures". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20056C332  + (Revises TS Change Requests 92-11 & 92-10,reflecting Changes Agreed Upon Between Util & NRC During Review of Ts.Ts 92-11 Replaces Existing Outdated Terra Technology Corp Seismic Monitoring Instrumentation W/Kenemetrics Sys)
  • ML20155A471  + (Revises Target Date from 981023 to 981123 to Respond to NRC 980821 RAI Re Conversion to Improved TS for Plant,As Result of 980923 Telcon,Followed by Meeting in Washington,Dc on 981014)
  • ML20032D218  + (Revises Tech Spec 3/4.8 Re Electrical Power Sys.Safety Evaluation Encl)
  • W3P86-2733, Revises Tech Spec Change Request NPF-38-23,implementing Bypass for nonsafety-related High Steam Generator Level Trip.Request Revised to Limit Trip Bypass to 20% Power & Below,Per NRC Request  + (Revises Tech Spec Change Request NPF-38-23,implementing Bypass for nonsafety-related High Steam Generator Level Trip.Request Revised to Limit Trip Bypass to 20% Power & Below,Per NRC Request)
  • ML20248C837  + (Revises Time for 890819 Mgt Meeting W/Util in Region II Ofc to Discuss Operator Requalification Program)
  • ML20072P967  + (Revises Toed Commmitments Re Plant IPEEE Effort & Explains Reasons for Doing So.Toed Changing Seismic Margin Study from focused-scope to reduced-scope for Performance of Seismic Portion of IPEEE & Extending Submittal Date as Stated)
  • ML19242A133  + (Revises Util 790618 Response to Re Fabrication History of Feedwater Piping)
  • ML19337A827  + (Revises Util 791106 Schedule for Shipment of Motor Generator Sets to Be Installed as Part of LPCI Sys Power Supply Mods. Generator Sets Will Be Installed During Fall 1980 Unit 3, Spring 1981 Unit 1 & Spring 1982 Unit 2 Outages)
  • ML18053A656  + (Revises Util 801219 Commitment Made in Response to NUREG-0737,item I.C.2, Shift & Relief Turnover Procedures. Util Will Maintain Sys Which Evaluates Effectiveness of Shift & Relief Turnover Procedure on Periodic Basis)
  • ML20004F598  + (Revises Util 810422 Response to NRC Re Violations Noted in IE Insp of License 34-13317-02 on 810309-10. Technologist Was Trained in Procedures Prior to Performing Such.Files Did Not Reflect Training)
  • ML17297B781  + (Revises Util 810818 Response to Open Item 50 of 810408 Auxiliary Sys Independent Review.Emergency Cooling Water Sys Adequately Designed.Tube Break Need Not Be Considered as Basic Design Event)
  • ML18139B775  + (Revises Util 810824 Response to Safety Evaluation Rept for Environ Qualification of safety-related Electrical Equipment Per IE Bulletin 79-01B.Remaining Cable Terminations Will Be Modified During May & Fall 1982 Maint Outages)
  • 1CAN048708, Revises Util 840815,850830 & 861020 Requests for Exemption from Requirements of App R of 10CFR50 Re Suppression & Separation in Emergency Feedwater Pump Room.Credit of Partial Suppression in Room Requested  + (Revises Util 840815,850830 & 861020 Requests for Exemption from Requirements of App R of 10CFR50 Re Suppression & Separation in Emergency Feedwater Pump Room.Credit of Partial Suppression in Room Requested)
  • ML20235V210  + (Revises Util 851118 Response to Violations Noted in Insp Rept 50-285/85-15.Corrective Actions:Combustible Matls Removed from UF6 Storage Area & Signs Posted in Area Warning Personnel Against Storing Combustibles or Flammables There)
  • ML20245J400  + (Revises Util 880802 Response to Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. NRC Positions on IGSCC Will Be Incorporated Into Inservice Insp Program)
  • TXX-8879, Revises Util 881007 Comments on Draft Environ Protection Plan.Requests That Item 2 Under Section 2.1 Re Aquatic Issues Be Deleted.Section 4.2.1 Re Groundwater Levels & Station Water Use Monitoring Be Revised to Read as Stated  + (Revises Util 881007 Comments on Draft Environ Protection Plan.Requests That Item 2 Under Section 2.1 Re Aquatic Issues Be Deleted.Section 4.2.1 Re Groundwater Levels & Station Water Use Monitoring Be Revised to Read as Stated)
  • ML20111B046  + (Revises Util 960205 Response to NRC RAI Question 2.C.1, Addressing Degree of Compliance W/Augmented Exam Established by NRC When Added Assurance of Structural Integrity Deemed Necessary)
  • B16364, Revises Util Commitment Re Steam Supply Lines to Turbine Driven AFW Pump  + (Revises Util Commitment Re Steam Supply Lines to Turbine Driven AFW Pump)
  • ML20091M333  + (Revises Util Commitment in SER Item 5, QA for Test,Maint & Surveillance. FSAR Will Be Updated to Include Explanation of Atws/Rts Diversity Requirements)
  • ML20082P342  + (Revises Util Commitments,Contained in in Response to Generic Ltr 88-17 Re Loss of Dhr.Shutdown Cooling Low Flow Alarm Will Still Be Installed.Pressure Indication on Suction of LPCI Pumps Will Not Be Installed)
  • ML20039D072  + (Revises Util Position,Presented in ,Re Requested Tech Spec Change for Gaseous Effluents.Minor Changes Are for Sake of Clarity)
  • ML19260C542  + (Revises Util Re Item 2.1.4 of NUREG-0578, Deleting Ref to Temporary Disabling of Automatic Valve Logic Reset Function.Permanent Logic Mods Will Be Implemented within 30 Days of Receipt of Parts)
  • ML20154D534  + (Revises Util to NRC Transmitting Safeguards Info Re Door Hatch & Blowout Panel Monitoring.Interlock Devices on Airlock Doors Will Be Used Instead of Posted Guards to Ensure Secondary Containment Integrity)
  • ML20065P567  + (Revises WO Parker Re Schedule for Submission of Info Needed to Resolve Concerns Identified in DG Eisenhut & NUREG-0612.Info Requested in Sections 2.2 & 2.4 of Encl 2 to Be Submitted by 821124)
  • ML19294B150  + (Revises to Nrc.During Fuel Loading & Low Power Testing,Util Will Provide Supplemental Onshift Coverage by Persons W/Significant Experience in Loading Large PWR Plants.Westinghouse Will Supply Some Personnel)