Revises Util Re Item 2.1.4 of NUREG-0578, Deleting Ref to Temporary Disabling of Automatic Valve Logic Reset Function.Permanent Logic Mods Will Be Implemented within 30 Days of Receipt of Parts
ML19260C542
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/28/1979
From: Kelly R
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0578, RTR-NUREG-578 NUDOCS 8001070388
Download: ML19260C542 (2)


Text

'

Georgia Power Cornpany 230 Peachtree Street Post Office Box 4545 Attanta. Georgia 30302 Teiephone 404 522-6060 m

R. J. Kelly vice prescent and General Manager December 28, 1979 Qg[bQ }k)gye[

Power Generabon

%: mfw e,ce,c gre,n Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC DOCKET 50-366 OPERATING LICENSE NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNIT 2 IMPLEMENTATION OF ITEM 2.1.4, CONTAINMENT ISOLATION PROVISIONS, OF NUREG 0578 Gentlemen:

The U. S. Nuclear Regulatory Commisssion's letter of September 13, 1979, as supplemented by the letter of October 30, 1979, directed the implementation of diverse containmnet isolation by January 1, 1980. Georgia Power Company's responses of October 19, and November 21, 1979, to those letters committed to meet those requirements by the disabling of the automatic valve logic reset function as a temporary measure by January 1, 1980. However, no satisfactory method of disabling the switch has been found which does not require the use of parts which are unavailable. A wiring modification as was discussed in our letter of December 20, 1979, on the Plant Hatch Unit I docket (Docket Number 50-321) can be installed on Unit 2 as a satisfactory solution which meets the requirements of NUREG 0578. This fix will require the use of certain qual-ified switches and relays which were available and installed on Unit 1,but were in insufficient supply to implement the same change on Unit 2.

These parts are expected to be delivered to the site in early January 1980.

Therefore, the discussion of the proposed solution to item 2.1.4 of NUREG 0578 contained in our letter of November 21, 1979, is hereby revised to delete any reference to the temporary disabling of the function of auto-matic reset of valve logic circuits, and to commit to permanent logic modifica-tions which will be implemented within thirty days of receipt of the necessary parts. This logic modification will meet the requirements of NUREG 0578 item 2.1.4 as supplemented by the subsequent NRC letter of October 10, 1979.

The fix which can be installed per the schedule discussed above is a fully satisfactory solution in accordance with NUREG 0578.

It is, how-ever, less than the optimum permanent fix.

Parts required for such an optimum fix are expected to be available on a schedule which would allow the installation of this optimum permanent fix during a planned outage scheduled to begin the first of March 1980. This outage is to be conducted

[]

as part of a previous commitment to the '!RC made in conjunction with

/'ON discussions on technical specification, rveillance requirements. We s

1696 159

//D sootovo M P

~

GeorgiaPower A Director of Nuclear Reactor Regulation December 28, 1979 Page Two thereby request an extension in the implementation of item 2.1.4 for Unit 2 until the March 1980 outage. This extension would allow the implementation of the optimum permanent fix and avoid the situation of a four to five day shutdown within the one month period from the end of January until the first of March.

Your earliest review of this change is requested.

If this revision to the commitments of our November 21, 1979, letter is not acceptable, please contact this office at your earliest opportunity.

Yours very truly, R. J. Kelly WEB /eb xc: Ruble A. Thomas G. F. Trowbridge, Esquire R. A. Rogers, III 1696 160