Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17202U836 + (Reviews Util 900904 & 17 Commitments to Install Hardened Wetwell Vents,Per Generic Ltr 89-16,prior to 930101.NRC Should Be Notified of Any Changes in Commitment or Installation Schedule)
- ML17306B409 + (Reviews Util 920115 Response to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Adequate Assurance Not Provided for Continued Operation for Life of Plant Re Auxiliary Pressurizer Spray Sys)
- ML20044E299 + (Reviews Util Discussing Operator Performance Expectations During ATWS Conditions.Staff Agrees Operator Should Not Be Expected to Perform Corrective Actions Faster than Rps,But Refers to Bwog Guide Re Correct Procedures)
- ML17348A830 + (Reviews Util Final Implementation Program Per Generic Ltr 87-02 Re Verification of Seismic Adequacy of Equipment at Facilities.Implementation Program Not Totally Acceptable)
- ML20090A642 + (Reviews Util Proposed Criteria for Pipe Breaks within Primary Containment.Submits Addl Guidelines for Completeness & Clarification of Paragraph 2.2)
- ML20247B274 + (Reviews Util Proposed Inservice Testing Program & Inservice Testing Tech Specs Per Generic Ltr 89-04.Review of Rev 9 to Inservice Testing Program Discontinued,Based on NRC Approval of Relief Requests)
- ML17305B004 + (Reviews Util Providing Evaluation of Results of Gas Binding on Charging Pump Operability)
- ML20003E511 + (Reviews Util Re Classification of Application Fees.Application for Revision of Safety Limit for Core Operating Parameter, ,requires Class I & III Fee & Therefore Addl Remittance)
- ML17321A572 + (Reviews Util Re Method for Performing Monthly Pump Test Required by Tech Spec 4.7.1.2.a.2.b for Turbine Driven Pump.Nrc Questions Methods in Procedure for Measuring Pumped Fluid Temps)
- ML19329F314 + (Reviews Util Re Mitigating Circumstances Concerning Noncompliance Identified in NRC 760813 Notice of Violation)
- ML19329C018 + (Reviews Util Re Reactor Vessel Matl Surveillance Program for SER Suppl.Addl Info Required to Justify Higher Lead Factor & Withdrawal Schedule.Program Acceptable Through First Fuel Cycle.Evaluation & Request for Addl Info Encl)
- ML19317F151 + (Reviews Util Responding to AEC . Discusses Util & Vendor QA Personnel Ability to Work Independently.Recommends Independence Be Granted)
- ML17202U956 + (Reviews Util Responses to Generic Ltr 89-10, Safety-Related Motor-Operated Valve Testing & Surveillance. Proposed Schedule for Completion of First Stage Somewhat Lengthy)
- ML17227A549 + (Reviews Util Submittals Per 901220,911206 & s Responding to Generic Ltr 90-06 & Requests Resubmittal of Util Response Keeping W/Intent of GL Due to Listed Areas of Concern)
- ML20155J817 + (Reviews Waste Mgt Sections of Application for Agreement State Status by State of Il.Proposed State of Il Program Compatible W/Nrc Program for Mgt of Low Level Waste.Related Documentation Encl)
- ML20126M918 + (Reviews Westinghouse 1,000 Mwe NSSS Design.If Properly Developed,Proposed Design Could Satisfy Current Regulatory Guidance & Be Licensable.Addl Analyses Required to Satisfy Requirements of Severe Accident Policy Statement)
- ML19241B368 + (Reviews Westinghouse Rept, Qualification Testing of Barton Pressure & Differential Pressure Transmitters)
- ML20115G633 + (Reviews Written Exam Administered at Faclity on 920824 & Found No Questions Causing Applicants Problems)
- ML19317E036 + (Reviews a Gehrs Proposal That Cooling Lake at Dresden Not Be Included in Indemnity Location.No Definite Conclusions Reached)
- 05000255/LER-1981-050-03, Reviews of Documentation Associated W/Repair Work to Pressurizer power-operated Relief Valves Were Found to Be Incomplete.Caused by Personnel Error.Procedures to Be Reviewed + (Reviews of Documentation Associated W/Repair Work to Pressurizer power-operated Relief Valves Were Found to Be Incomplete.Caused by Personnel Error.Procedures to Be Reviewed)
- 05000336/FIN-2018011-01 + (Reviews of Incoming Industry Operation Experience Not Completed)
- ML19276G284 + (Reviews to Gao Re record-keeping Requirements Found in 10CFR40.61.Records Retained for Five Years Unless Part of Investigation)
- TSTF-329 + (Revise 3.4.17 Bases to Match Specification)
- TSTF-195 + (Revise 3.4.6 Action A.1 to Be Consistent with the Specification)
- TSTF-318 + (Revise 3.5.1 for One Lcpi Pump Inoperable in Each of Two ECCS Divisions)
- TSTF-546 + (Revise APRM Channel Adjustment Surveillance Requirement)
- TSTF-277 + (Revise Accumulator Boron Concentration Verification SR)
- TSTF-117 + (Revise Accumulator Pressure Reference from Pressurizer to RCS)
- TSTF-305 + (Revise Actions for Exiting Physics Tests)
- TSTF-566 + (Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-571 + (Revise Actions for Inoperable Source Range Neutron Flux Monitor)
- TSTF-220 + (Revise Actions for Inoperable, Misaligned Apsr)
- NL-17-0190, Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process + (Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater Pump Inoperable Using the Consolidate Line Item Improvement Process)
- TSTF-100 + (Revise Adv Action B to State Restore All But One Adv to Operable Status)
- TSTF-592 + (Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
- TSTF-514 + (Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-114 + (Revise Bases for 3.4.7 to Address DHR Via Natural Circulation)
- TSTF-350 + (Revise Bases for Rspt SR 3.1.5.4)
- TSTF-111 + (Revise Bases for SRS 3.3.1.16 and 3.3.2.10 to Eliminate Pressure Sensor Response Time Testing)
- TSTF-559 + (Revise Bases to Reflect Revised SL Pressure Limit)
- TSTF-202 + (Revise Battery Surveillance Weekly Frequencies)
- TSTF-193 + (Revise CE Analog CEA Position Indication Verification)
- TSTF-436 + (Revise Channel Calibration Definition to Address NON-ADJUSTABLE Sensors)
- L-MT-14-065, Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation + (Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation)
- L-MT-15-009, Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01. Managing Gas Accumulation + (Revise Commitment Date to Submit License Amendment Request for Adoption of TSTF-523, Revision 2, Generic Letter 2008-01. Managing Gas Accumulation)
- TSTF-095 + (Revise Completion Time for Reducing Power Range High Trip Setpoint from 8 to 72 Hours)
- TSTF-112 + (Revise Condition D in Tech Spec 3.2.3.A)
- TSTF-051 + (Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations)
- TSTF-123 + (Revise Control Rod Assemblies in Design Features to Match Definitions)
- TSTF-508 + (Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation)