Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248M056 + (Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique)
- ML20207L013 + (Rev 5 to CENPD-210, QA Program:Description of Nuclear Power Sys QA Program)
- ML20249C475 + (Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12)
- ML17313A452 + (Rev 5 to COLR for Pvngs,Unit 3)
- ML20059H735 + (Rev 5 to COLR, Updating Min Boron Concentration to 1900 to Reflect Core Changes Prior to Cycle 15 Operation)
- ML20216J115 + (Rev 5 to CP&L-CED-M-01, Mlsb Analysis CR Dose Analysis to Support Power Uprate)
- ML20202A946 + (Rev 5 to CP-QAP-12.1, Insp Criteria & Documentation Requirements Prior to Sys N-5 Certification)
- ML20078R637 + (Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval)
- ML20198L818 + (Rev 5 to Calculation 95-011, Control Room Thyroid Dose from Main Steam Line Break Event)
- ML20078B928 + (Rev 5 to Calculation C122-93-01-01, CNS Control Room Operator Thyroid Dose Calculation)
- ML18010A851 + (Rev 5 to Calculation SC-N-062, RCS Wide Range Pressure Loop 3 P-402)
- ML20093M737 + (Rev 5 to Calibr Rept for Model RD-52 Offline Beta Detector)
- ML20196H187 + (Rev 5 to Callaway Cycle 9 COLR Rept, for Jul 1997)
- ML20024G988 + (Rev 5 to Callaway Records Info Sys General Rules for Records Indexing)
- ML20058E557 + (Rev 5 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program)
- ML20115D582 + (Rev 5 to Chapter 1.0 of South Texas Project Electric Generating Station Operations QA Plan,Organization)
- ML20216G135 + (Rev 5 to Chapter 12 of Zion Annex Odcm)
- ML20094D322 + (Rev 5 to Chapter 13.0 of Operations QA Plan,Deficiency Control)
- ML20094D318 + (Rev 5 to Chapter 9.0 of Operations QA Plan,Control of Matl)
- ML20237G999 + (Rev 5 to Chemical Operating Procedure COP-851004, Shipment of UF6 Cylinders in Protective Overpaks)
- ML20235T690 + (Rev 5 to City of Taunton Radiological Emergency Response Plan for Pilgrim Nuclear Power Station.* Related Info Encl)
- ML20134N325 + (Rev 5 to Colr)
- ML20244A958 + (Rev 5 to Comanche Peak Steam Electric Station Startup Administrative Procedure CP-SAP-11, Review,Approval & Retention of Test Results)
- ML20244A943 + (Rev 5 to Comanche Peak Steam Electric Station Startup Administrative Procedure CP-SAP-8, Review,Approval & Rev of Test Instructions/Procedures)
- ML20086J423 + (Rev 5 to Comanche Peak Steam Electric Station Unit 1 Inservice Testing Program Plan)
- ML20207P583 + (Rev 5 to Configuration Control)
- ML20237L051 + (Rev 5 to Const Procedure 35-1195-CCP-10, Concrete Batch Plant Operations, Incorporating Document Change Notice 1. Related Documentation Encl)
- ML20138P325 + (Rev 5 to Const Procedure CCP 40, Protective Coatings of Concrete Surfaces, Attachment s, Special Coatings Procedure C-1, Application of Nutec 10 Concrete Curing & Sealing Compound)
- ML20138P613 + (Rev 5 to Const Procedure CCP-40 Re Surface Preparation & Coating of Cementitious Surfaces Inside Reactor Bldg & Radiation Area,Incorporating Document Change Notice 1-6)
- ML20138P278 + (Rev 5 to Const Procedure CCP-40, Protective Coatings of Concrete Surfaces, Incorporating Document Change Notices 1-6)
- ML20127C316 + (Rev 5 to Const Work Procedure W-WP-7, Concrete Placing, Curing,Finishing & Repairs)
- ML20236C584 + (Rev 5 to Control Room/Technical Support Ctr Habitability)
- ML17325B467 + (Rev 5 to Cook Nuclear Plant Restart Plan)
- ML20091H042 + (Rev 5 to Core Operating Limits Rept,Consisting of Revised Section 2.1 Re Moderator Temp Coefficient)
- ML20206E732 + (Rev 5 to Corporate Operations Manual Part IV-Functional Manuals,Section 1:Nuclear QA Manual)
- ML20235J675 + (Rev 5 to Corrective Maint Procedure 1-1ORH-F-605-1I, Temporary Mod of RHR Bypass Flow Loop F-RH605 for Linear Indication)
- ML20033G898 + (Rev 5 to Crisis Mgt Plan Implementing Procedure EDA-2, Offsite Dose Projections for Catawba Nuclear Station)
- ML20046B729 + (Rev 5 to Criticality Safety Engineering Rept)
- ML20140F141 + (Rev 5 to Cycle 5 Colr)
- ML17333A335 + (Rev 5 to DC Cook Nuclear Plant Unit 1,Cycle 15 Colr)
- ML17333B066 + (Rev 5 to DC Cook Nuclear Plant Unit 2 Cycle 11 Colr)
- ML20211A988 + (Rev 5 to DPC Nuclear Security Training & Qualification Plan)
- ML20072S840 + (Rev 5 to Davis-Besse Process Control Program)
- ML20132F310 + (Rev 5 to Decommissioning Program Plan for Dresden Nuclear Power Station Unit 1)
- ML20076G977 + (Rev 5 to Design Assessment Rept)
- ML20044G613 + (Rev 5 to Design Guide DG-II.20, Design Guide for Civil/Structural Operability Reviews)
- ML20129E044 + (Rev 5 to Design for Reactor Core Safety in Nuclear Power Plants, Safety Guide)
- ML20237G221 + (Rev 5 to Div Sys Description 3525-014, Dewatering Sys for Defueling Canisters)
- ML20126D562 + (Rev 5 to Document W3-3, Document Control & Records Turnover)
- ML20035H068 + (Rev 5 to Dresden Safe Shutdown Procedure Dssp 0100-A, Hot Shutdown Procedure - Path a)
- ML17250B107 + (Rev 5 to ECA-1.1, Loss of Emergency Coolant Recirculation)