Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20212M732 + (Rev 3 to Grand Gulf Unit 1 Cycle 2 Reload Analysis)
- ML20073D134 + (Rev 3 to H10.1, ASME Section XI Inservice Testing Implementing Program)
- ML18058B787 + (Rev 3 to HP 10.10, Palisades Radiological Environ Program Sample Collection & Shipment)
- ML20207K239 + (Rev 3 to HTRG-85-001, Licensing Plan for Std Htgr)
- ML20212N811 + (Rev 3 to Habitability of LaSalle County Station Control Room Following Postulated Accident Involving Shipments of Anhydrous Ammonia in Vicinity of LaSalle County Station)
- ML20211N356 + (Rev 3 to Hardware Validation Program. Supporting Documentation Encl)
- ML20195H010 + (Rev 3 to Hatch 9X9 Lead Fuel Assemblies Sar)
- ML20207P604 + (Rev 3 to Health Physics Facilities,Clothing & Protective Equipment)
- ML20214N922 + (Rev 3 to Health Physics Procedure RAC-002, Dosimetry Program)
- ML20214N991 + (Rev 3 to Health Physics Procedure RAC-015, Verification Procedures for Vicinity Properties & Tailings Sites (Soil Sampling & Analysis))
- ML20214N968 + (Rev 3 to Health Physics Procedure RAC-014, Excavation Control Procedure)
- ML20214N995 + (Rev 3 to Health Physics Procedure RAC-016, Indoor Working Level Verification Surveys)
- ML20129E649 + (Rev 3 to Hydrogen Control Program Plan)
- ML20082L545 + (Rev 3 to ISI Plan for Braidwood Nuclear Generating Station Units 1 & 2 1st Insp Interval)
- ML20215E163 + (Rev 3 to ISI-P-002, Preservice Insp Program)
- ML20043H309 + (Rev 3 to ISI-P-014, Inservice Insp Program)
- ML17156B067 + (Rev 3 to ISI-T-200.0, Pump & Valve Inservice Insp Testing Program)
- ML20073D367 + (Rev 3 to IST Program,Including Review Sheets to Add 17 Valves,Three Revised Pump Review Sheets,Reflecting Testing Requirements of Relief Request P3 & Review Sheets for Two Valves Which Had Testing Requirements Changed)
- ML20138K294 + (Rev 3 to IT 535B, Leakage Reduction & Preventive Maint Program Test of Train B HHSI & RHR Sys (Refueling) Unit 2)
- ML20211G945 + (Rev 3 to Independent Corrective Action Verification Program Millstone Unit 2 Audit Plan)
- ML20211C426 + (Rev 3 to Initial Startup Administrative Manual Procedure ISA-006, Initial Startup Test Procedure Changes)
- ML20006A832 + (Rev 3 to Inservice Exam Plan)
- ML20155J669 + (Rev 3 to Inservice Insp 10-Yr Plan for Beaver Valley Power Station)
- ML20202F619 + (Rev 3 to Inservice Insp Program Including Rev 1 to Inservice Insp Schedule Status Table)
- ML20212A153 + (Rev 3 to Inservice Insp Program Second 10-Year Interval, ASME XI 1980 Edition W80 Addenda, Re Recirculation Pipe Replacement Project Implemented During 1983-1984 Refueling Outage)
- ML20154C985 + (Rev 3 to Inservice Insp-First Interval)
- ML20154P801 + (Rev 3 to Inservice Pump & Valve Test Program)
- ML20151R033 + (Rev 3 to Inservice Test Program ISI-P-008, Summary of Changes)
- ML20107A827 + (Rev 3 to Inservice Testing Program)
- ML20134L289 + (Rev 3 to Inservice Testing Program)
- NLS8400169, Rev 3 to Inservice Testing Program + (Rev 3 to Inservice Testing Program)
- ML20062H908 + (Rev 3 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant)
- ML20238E250 + (Rev 3 to Inservice Testing Program Plan for Pumps & Valves)
- ML20246D959 + (Rev 3 to Inservice Testing Program Plan for Pumps & Valves)
- ML20216H822 + (Rev 3 to Inservice Testing Program Plan,Rancho Seco Nuclear Generating Station)
- ML20090G148 + (Rev 3 to Inservice Testing Program for Pumps & Valves)
- ML20207P916 + (Rev 3 to Insp - Insp Procedures, Element Rept)
- ML20205Q588 + (Rev 3 to Instruction CP-EI-4.5-1, General Program for As-Built Piping Verification, Per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14)
- ML20210G875 + (Rev 3 to Instruction QI-058, Reinsp of Pipe Supports Trt Issues - 42 Pipe Supports)
- ML20136B412 + (Rev 3 to Instruction QI-QP-11.14-12, Verification of Seismic Electrical Equipment Mounting Details)
- ML20210B021 + (Rev 3 to Instruction QI-QP-11.14-3, Insp of Structural/ Miscellaneous Steel Welding. Supporting Documentation Encl)
- ML20136B186 + (Rev 3 to Instruction QI-QP-11.3-40, Class 1E Electrical Post-Const Verification)
- ML20206N600 + (Rev 3 to Instruction QI-QP-11.3-49, Installation of Conax Feedthrough/Adapter Module Assemblies for Amphenol Sams Penetrations)
- ML20138M832 + (Rev 3 to Instruction QI-QP-11.4-22, QC Surveillance of Protective Coatings Unique Identification Number Transfer)
- ML20138M811 + (Rev 3 to Instruction QI-QP-11.4-9, Insp of Shop Primed Equipment)
- ML20211J712 + (Rev 3 to Instruction QI-QP-2.1-11, Qualification & Concrete Expansion Anchor Support Insp Personnel)
- ML20207P608 + (Rev 3 to Instruments,Matl,Equipment Re Purchasing & Requisitions)
- ML20076D131 + (Rev 3 to Interface Control Agreement,Westinghouse Piping & Structural Evaluation Program for Byron Station Unit 1)
- ML20086G781 + (Rev 3 to Interim Deficiency Rept DER 82-46 Re ITT-Barton Pressure Transmitters Supplied by C-E Not Meeting Overpressure Requirements.Initially Reported on 820824.Final Rept Expected by 840214.Also Reportable Per Part 21)
- ML20216J415 + (Rev 3 to Internal Procedure D.7, Procedure for Reviewing State Regulations)
- ML20141N166 + (Rev 3 to Isap III.a.2, Joint Test Group (Jtg) Approval of Test Data)