Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20204K077 + (Rev 3 to Emergency Operating Procedure FR-I.1, Response to High Pressurizer Level)
- ML20245C065 + (Rev 3 to Emergency Operating Procedure IPOP05-EO-EC01, Loss of All AC Power Recovery W/O SI Required)
- ML20236N448 + (Rev 3 to Emergency Operating Procedures, Training Course Syllabus)
- NLS8400268, Rev 3 to Emergency Plan Implementing Procedure EPIP 5.7.14, Stable Iodine Thyroid Blocking (Ki) + (Rev 3 to Emergency Plan Implementing Procedure EPIP 5.7.14, Stable Iodine Thyroid Blocking (Ki))
- PLA-2829, Rev 3 to Emergency Plan Implementing Procedure EP-IP-032, General Ofc Activation & Rev 5 to EP-IP-033, Dose Assessment & Protective Actions. W/Revised Lists of Effective Pages & + (Rev 3 to Emergency Plan Implementing Procedure EP-IP-032, General Ofc Activation & Rev 5 to EP-IP-033, Dose Assessment & Protective Actions. W/Revised Lists of Effective Pages &)
- ML18141A621 + (Rev 3 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure)
- ML17261A477 + (Rev 3 to Emergency Plan Implementing Procedure SC-430, Administration of Potassium Iodine (Ki))
- ML17214A684 + (Rev 3 to Emergency Plan Implementing Procedure 3100035E, Offsite Radiological Monitoring)
- ML20083K419 + (Rev 3 to Emergency Plan Implementing Procedure EPIP 5.7.21, Emergency Equipment Inventory)
- ML20056F307 + (Rev 3 to Emergency Plan Off Normal (Epon) Occurrence Procedure HS-EP-02820, Earthquake. W/Rev 23 to Epon Occurrence Procedures Manual Table of Contents)
- ML20196H267 + (Rev 3 to Emergency Procedure A-01, Emergency Response Organization)
- ML20199J618 + (Rev 3 to Emergency Procedure A-04, Classification)
- ML20212J849 + (Rev 3 to Employee Concerns Special Program Rept 302.01-SQN, Possible Lack of Watertight Conduit & Connections)
- ML20212J627 + (Rev 3 to Employee Concerns Special Program Rept 229.12(B), Instrumentation & Control Design,Panel to Equipment Distances)
- ML20212J521 + (Rev 3 to Employee Concerns Special Program Rept 205.1(B), Control of Design Calculations,Calculation Preparation Requirements Policy & Practice Scope & Stds)
- ML20093D284 + (Rev 3 to Engineering Analysis, DG Upper Temp Limits)
- ML20087N462 + (Rev 3 to Engineering Assurance Dept Procedure EAD-4, Reporting of Design Process Review/Technical Assessment Results)
- ML20087N471 + (Rev 3 to Engineering Assurance Dept Procedure EAD-5, Control of Design Process Review & Assessment Records)
- ML20238F049 + (Rev 3 to Engineering Assurance Program Engineering Functional Evaluation,Comanche Peak Steam Electric Station)
- ML20132B758 + (Rev 3 to Engineering Justification for Placement of Automatic Sprinklers,Comanche Peak Steam Electric Plant)
- ML20205N798 + (Rev 3 to Engineering Operating Procedure EOP 30-4.00, Engineering Info Sys. Change Notice a Effective 840412 Encl)
- ML20035F234 + (Rev 3 to Engineering Operating Procedure EOP 42-10.00, Drf Assignment Sheet Instructions)
- ML20024F617 + (Rev 3 to Engineering Program Plan Project Instruction P1-3201-009 Midland Independent Design & Const Verification Program)
- ML20115D862 + (Rev 3 to Engineering Work Instruction (Ewi) EWI-09.04.01, Inservice Testing Program)
- ML20059E024 + (Rev 3 to Environ Monitoring & Emergency Preparedness)
- ML20205F520 + (Rev 3 to Environ Protection Control Program. Related Correspondence)
- ML20137T671 + (Rev 3 to Environ Qualification Summary Rept for Hope Creek Generating Station)
- ML17262A356 + (Rev 3 to Eop/Ap Attachment)
- ML20093K308 + (Rev 3 to Evaluation of Containment Coatings)
- ML18102B019 + (Rev 3 to Evaluation of Containment Structure for Latest Temp Loads)
- ML18064A578 + (Rev 3 to Evaluation of Palisades Current PTS Screenin Criteria Margin)
- ML20153F934 + (Rev 3 to FEP-2.0, Train a Plant Shutdown to Hot Standby Due to Fire)
- ML20153F969 + (Rev 3 to FEP-3.1, Train B Plant Shutdown from Hot Standby to Cold Shutdown Due to Fire)
- ML20150C220 + (Rev 3 to FNP-0-M-011, Offsite Dose Calculation Manual)
- ML20248H881 + (Rev 3 to FNP-1-M-042 Re Second 10-yr Interval Inservice Testing Program for ASME Code Class 1,2 & 3 Pumps & Valves)
- ML20058Q154 + (Rev 3 to FNP-1-M-043, Jm Farley Nuclear Plant Unit 1 Second 10-Yr Inservice Insp Program,Asme Code Class 1,2 & 3 Components)
- ML17250B132 + (Rev 3 to FR-I.2, Response to Low Pressurizer Level)
- ML17250B134 + (Rev 3 to FR-I.3, Response to Voids in Reactor Vessel)
- ML20205R408 + (Rev 3 to Failure Analysis & Structural Integrity Evaluation of Leaking Small Bore Aluminum-Bronze Cast Valve Bodies & Fittings in Essential Cooling Water Sys)
- ML20082Q681 + (Rev 3 to Final Deficiency Rept DER 82-78 Re Improperly Crimped Termination Lugs in Control Panels for Water Chillers Supplied by Carrier.Condition Corrected Via Subj Design Change Packages.Also Reportable Under Part 21)
- ML20244B334 + (Rev 3 to Final Design Description of ATWS Mitigation Sys Actuation Circuitry)
- ML20205P777 + (Rev 3 to Final Part 21 & Deficiency Rept DER 82-46 Re Itt Barton Pressure Transmitters Supplied by C-E That Do Not Meet Overpressure Requirements.Rev Updates & Clarifies Info Re Description of Deficiency & Corrective Actions)
- ML20095D310 + (Rev 3 to Final Rept Overhead Handling Sys Review)
- ML20064F508 + (Rev 3 to Final Rept to NRC for IE Bulletin 79-14 Requirements at TMI-1)
- ML20133K488 + (Rev 3 to Findings,Corrective Actions & Generic Implications Rept, Toledo Edison - Main Steam Header Pressure)
- ML18038A485 + (Rev 3 to First 10-Yr ISI Program Plan. W/910930 Ltr)
- ML20237J990 + (Rev 3 to First 10-yr Interval Augmented Inservice Insp Program)
- ML20237J840 + (Rev 3 to First 10-yr Interval Inservice Insp Program)
- ML20205C946 + (Rev 3 to Fitzpatrick Emergency Procedure Guidelines)
- ML20091P401 + (Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003)
- ML20237C029 + (Rev 3 to Fort Calhoun Station,Unit 1,Inservice Insp Program Plan for 1983-1993 Interval)